ML13079A282
From kanterella
Revision as of 08:03, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML13079A282 | |
Person / Time | |
---|---|
Site: | Pilgrim, Seabrook |
Issue date: | 03/26/2013 |
From: | Macfarlane A M NRC/Chairman |
To: | Keating B, Markey E J, Tierney J F US Congress, US HR (House of Representatives) |
Ellmers, Glenn, 415-0442 | |
Shared Package | |
ML13079A268 | List: |
References | |
CORR-13-0029, G20130209, LTR-13-0224 | |
Download: ML13079A282 (3) | |
Category:Congressional Correspondence
MONTHYEARML21022A2212021-02-0505 February 2021
[Table view]Letter to Senator Charles Schumer from Margaret Doane Response for NRC to Reconsider Its Decision to Not Allow for a Public Hearing in the Transfer of Indian Point'S License ML20192A2392020-07-29029 July 2020 Letter to the Honorable Jeanne Shaheen, Et Al., from Chairman Svinicki Regarding Concerns About Recent Incidents at Seabrook Station and Requests for a Public Information Session and Congressional Briefing ML20119A9872020-05-0505 May 2020 Letter to the Honorable Edward Markey, Et Al., from Chairman Svinicki Responds to Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML20111A1402020-04-20020 April 2020 LTR-20-0159 Senator Edward Markey Et Al., Letter Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML19262G4752019-10-0808 October 2019 10-08-19 - Ltr to the Honorable Edward J. Markey, Et Al., Responds to Concerns Related to the NRC Staff Recommendation Regarding a Request from Entergy for Exemptions from Emergency Preparedness and Planning Requirements for Pilgrim Nuclear ML19239A1452019-08-26026 August 2019 Letter to the Honorable Edward J. Markey from Rochelle C. Bavol, Acting Secretary of the Commission, Regarding the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec ML19233A2432019-08-21021 August 2019 LTR-19-0326 Sen Edward Markey, Sen Elizabeth Warren & REP William Keating, Letter Urges to Delay the Final Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy & Holtec Until After the Commission Has Ruled Upon ML19221B4792019-08-0808 August 2019 LTR-19-0310 Sen Edward J. Markey, Letter Urges the Chairman to Direct the NRC Staff to Delay Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec (Docket No. 50-293 & 72-1004) ML18341A0162018-12-20020 December 2018 Letter to the Honorable William Keating Responds to His Letter Commenting on Recent NRC Inspection Reports Issued for the Pilgrim Nuclear Power Station ML18331A0402018-11-21021 November 2018 Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report ML18228A6432018-08-28028 August 2018 Letter to Representative William Keating from Chairman Svinicki Responds to His Letter Regarding the Proposed Sale of Pilgrim Nuclear Power Station by Entergy Nuclear Operations Inc. to a Subsidiary of Holtec International ML18135A1022018-05-29029 May 2018 Letter to the Honorable Edward Markey from Chairman Svinicki Responds to His Letter Regarding Spent Fuel Storage at Pilgrim Nuclear Power Station and the Potential Impacts of Climate Change ML18127A0312018-05-0707 May 2018 Statement of Senator Edward J. Markey - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0322018-05-0707 May 2018 Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0302018-05-0707 May 2018 Statement of Congressman William R. Keating - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18066A0822018-03-19019 March 2018 Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station ML16295A0892016-10-20020 October 2016 Letter to Senator Edward J. Markey Et Al., from Chairman Burns, Response to Letter Urging the Commission to Reject a Request from Entergy Nuclear Operations Inc. for an Extension of Time to Comply with NRC Order EA-13-109 ML16266A0652016-09-21021 September 2016 LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim ML16174A4032016-06-15015 June 2016 Letter to Senator Edward Markey from Eugene Dacus, OCA Provides Final Response to His Letter on Seabrook Station, Unit 1 Enclosing UFSAR Revisions 11, 12, 13, 14 and 15 ML16141B3062016-05-17017 May 2016 05-17-16, Letter to Senator Edward Markey from Eugene Dacus Provides Second Response for Documents Regarding the Seabrook Station Unit 1 (Rev. 16 of the UFSAR and NextEra Response Letter to the Staff on License Renewal for Seabrook) ML16111B3122016-04-19019 April 2016 04-19-16 Letter to Senator Markey Fm Eugene Dacus Responds to His Letter Requesting Documents Pertaining to the Seabrook Station (Revisions 12-16 for Seabrook'S Updated Final Safety Analysis Reports, Chapter 3) ML16054A7672016-02-23023 February 2016 02-23-16 Letter to Senator Edward Markey from Eugene Dacus Acknowledging His Letter to Chairman Burns Dated 02/17/16 Pertaining to the Seabrook Station ML16054A1172016-02-17017 February 2016 LTR-16-0080 - Senator Edward J. Markey, Letter Request for Documents Related to Safety Issues at Seabrook Station Nuclear Power Plant ML15309A1282015-11-30030 November 2015 Letter to Senator Edward J. Markey, Et Al., from Chairman Burns Responds to His Letter Seeking Assurance That Decommissioning of Pilgrim Nuclear Power Station Will Be in Compliance with NRC Regulations (Response) ML15299A1142015-10-21021 October 2015 10-21-15 Ack Ltr to Honorable Edward J Markey - Pilgrim ML15289A1452015-10-15015 October 2015 LTR-15-0519 Senator Edward J. Markey, Letter Request to Ensure That the Remaining Period During Which the Pilgrim Nuclear Power Station Operates Receives the Utmost Attention to Safety and Security ML14163A4332014-08-0101 August 2014 Letter to Senator Edward J. Markey from Chairman Macfarlane Information About NRC-Sanctioned Job Shadow Program with China ML14141A6242014-05-20020 May 2014 LTR-14-0288 - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China ML14043A1382014-02-14014 February 2014 G20140055/LTR-13-0957 - Sen. Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the 6/1/10, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and Remedied ML14037A1262014-02-14014 February 2014 G20140030/LTR-14-0009- Senator Jeanne Shaheen Email Seabrook - Piping/Plumbing (Response) ML14014A2252014-01-14014 January 2014 LTR-13-0957, Response Letter to Senator Edward Markey Et Al., on His Request for NRC to Not Make a Decision for the Seabrook Plants for a 20 Year OL Until the Concrete Degradation Is Well Tested and Remedied ML13354B9522013-12-18018 December 2013 G20140055/LTR-13-0957 - Senator Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the June 1, 2010, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and ML13079A2822013-03-26026 March 2013 G20130209/LTR-13-0224 Ltr. to Rep. E. Markey, Et Al. - Responds to Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13007A4062013-01-0202 January 2013 Comment (136) of Thomas J. Calter, State Representative on Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation ML12215A0212012-07-31031 July 2012 G20120556/LTR-12-0385/EDATS: SECY-2012-0393 - Rep. Edward J. Markey and Rep. Bill Keating Ltr. Emergency Response Capability at the Pilgrim Nuclear Generating Station During Labor Dispute ML12163A5022012-07-23023 July 2012 G20120371/LTR-12-0238/EDATS: OEDO-2012-0270 - Letter to Rep. Edward J. Markey from Chairman Allison M. Macfarlane Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12191A3352012-07-23023 July 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Letter to Reps. Edward Markey and William Keating from Chairman Allison M. Macfarlane Concerns About Current Emergency Response Capabilities at Pilgrim Nuclear Generating Station ML12152A3892012-07-23023 July 2012 LTR-12-0187 - Ltr to Congressmen Edward Markey and William Keating from Chairman Macfarlane Responds to Letter Regarding the twenty-year Extension of Pilgrim Nuclear Power Station'S Operating License ML12172A3032012-06-0808 June 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Ltr. Reps. Edward Markey and William R. Keating Concerns the Current Emergency Response Capability at the Pilgrim Nuclear Generating Station ML12153A0262012-05-24024 May 2012 G20120371/LTR-12-0238/EDATS: SECY-2012-0270 - Ltr. Rep. Edward J. Markey Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12145A6922012-05-0404 May 2012 LTR-12-0187 - Incoming from Rep Markey and Rep Keating to Chairman Jaczko Urging the Commission Not to Move Forward with Its Decision on Whether to Issue the twenty-year License Extension for Pilgrim Nuclear Power Station ML12114A0172012-04-13013 April 2012 G20120265/LTR-12-0150/EDATS: SECY-2012-0195 - Ltr. Reps. Edward J. Markey and John F. Tierney to Chairman Jaczko Seabrook Nuclear Power Plant - Degradation of Concrete ML12090A5882012-03-27027 March 2012 G20120213/LTR-12-0123/EDATS: SECY-2012-0147 - Senator Kelly A. Ayotte Ltr. Seabrook Nuclear Station ML12104A1132012-03-23023 March 2012 G20120234/LTR-12-0140/EDATS: SECY-2012-0178 - E-mail Senator John F. Kerry Safety Issues at Seabrook Nuclear Power Plant ML12079A2162012-03-21021 March 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Ltr to Rep. Edward J. Markey Fm R. W. Borchardt Re Pilgrim Nuclear Power Station ML12072A3032012-03-0808 March 2012 Letter from the Secretary to the Honorable Edward J. Markey in Response to His February 27, 2012 Letter ML12079A2182012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Responses to Information Requests from Representative Edward J. Markey ML12061A2152012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 Urges NRC Not to Relicense the Pilgrim Nuclear Power Station Until All Legal Requirements Stipulated by the Endangered Species Act Have Been Met CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 2021-02-05 Category:Letter MONTHYEARML24254A2552024-09-25025 September 2024
[Table view]Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 2024-09-25 |