Title | Unusual Event Declaration: Loss of Offsite Power Due to Loss of Startup Transformer |
Event Description | Unusual event category 10A on Unit 4. Loss of offsite power to Unit 4 due to loss of Unit 4 Startup Transformer. Auto AFW actuation. Auto starting and loading of both Unit 4 Emergency Diesel Generators.
The licensee stated that the plant is stable in Mode 3 at approximately 700 psi and 380 deg F. The plant was experiencing electrical grid instabilities at the time of the trip of the Startup Transformer. The exact cause of the transformer trip is being investigated. The grid instabilities were associated with the plant's Northwest Bus, therefore, Unit 3 is not affected and continues to operate at approximately 60% power. The licensee notified the State of Florida and will notify the NRC Resident Inspector
The licensee terminated from their Unusual Event (EAL 10A) at 0200 EST on 11/02/05. Unit 4 A & B 4 KV busses are now powered from off-site power using Unit 4 startup transformer." The power / mode for Unit 4 is now 0% power / Mode 5. The licensee will notify the NRC Resident Inspector and has notified State, local and other government agencies. Notified R2DO (Ayres), NRR EO (Case), IRD-MOC (Wilson), DHS (J. Frost) and FEMA (S. Kimbrell). |
Where | |
---|---|
Turkey Point Florida (NRC Region 2) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-4.42 h-0.184 days <br />-0.0263 weeks <br />-0.00605 months <br />) | |
Opened: | David Funk 23:02 Oct 31, 2005 |
NRC Officer: | Mike Ripley |
Last Updated: | Nov 2, 2005 |
42104 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42104\u003C/a\u003E - \u003Ca href=\"/Turkey_Point\" title=\"Turkey Point\"\u003ETurkey Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnusual Event Declaration: Loss of Offsite Power Due to Loss of Startup Transformer\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42104 - Turkey Point\n","link":"","lat":25.435330555555556,"lon":-80.33125833333334,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 4 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Standby (0 %) |
After | Hot Standby (0 %) |
Turkey Point with 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 568132023-10-25T01:59:00025 October 2023 01:59:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 567552023-09-22T22:19:00022 September 2023 22:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 566582023-08-04T17:20:0004 August 2023 17:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 562642022-12-08T19:02:0008 December 2022 19:02:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Due to Excessive Reactor Coolant System Leakage ENS 555132021-10-09T07:00:0009 October 2021 07:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater System AUTO-STARTED on Feedwater Isolation Signal ENS 551532021-03-25T01:29:00025 March 2021 01:29:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notice of Unusual Event Declared Due to Fire Alarm in Containment ENS 540722019-05-18T15:08:00018 May 2019 15:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due Grid Disturbance ENS 529602017-09-10T22:55:00010 September 2017 22:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip on Lowering Steam Generator Water Level ENS 529522017-09-08T03:14:0008 September 2017 03:14:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event - Hurricane Warning ENS 526212017-03-18T15:19:00018 March 2017 15:19:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Alert Declared for Indications of Fire in Safety Related Switchgear ENS 526232017-03-18T15:07:00018 March 2017 15:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Reactor Trip and Loss of Ability for Unit 4 to Supply Power to Unit 3 ENS 510652015-05-12T08:30:00012 May 2015 08:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Main Generator Differential Trip ENS 506452014-11-30T18:54:00030 November 2014 18:54:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Auxiliary Feedwater Actuation Due to Planned Reactor Trip ENS 503542014-08-11T14:20:00011 August 2014 14:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip on Loss of Instrument Air Followed by Safety Injection ENS 500542014-04-23T17:02:00023 April 2014 17:02:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation During Rod Testing ENS 489482013-04-19T21:20:00019 April 2013 21:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Due to Loss of Offsite Power Greater than 15 Minutes ENS 488212013-03-13T15:20:00013 March 2013 15:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Afw Actuation Due to Trip of 3B Feedwater Pump ENS 487642013-02-18T06:31:00018 February 2013 06:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to High Seal Leakoff on Reactor Coolant Pump 3A ENS 487442013-02-12T03:36:00012 February 2013 03:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Trip on Loss of Condenser Vacuum ENS 477972012-04-02T23:33:0002 April 2012 23:33:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event - Fire from Hydrogen Supply to Volume Control Tank ENS 464192010-11-15T11:03:00015 November 2010 11:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of a Circulating Water Pump with Another Pump Out of Service for Maintenance ENS 462742010-09-23T21:14:00023 September 2010 21:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Inadvertent Energization Generator Trip ENS 462652010-09-22T00:17:00022 September 2010 00:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 462462010-09-09T19:34:0009 September 2010 19:34:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip During Startup Due to a Control Bank Step Counter Failure ENS 462352010-09-08T17:45:0008 September 2010 17:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip During Maintenance on a Reactor Protection System Relay ENS 456192010-01-11T15:55:00011 January 2010 15:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Initiated Due to High Steam Generator Level ENS 455222009-11-27T04:40:00027 November 2009 04:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Two Shutdown Bank Rods Were Dropped from Fully Withdrawn Position ENS 440092008-02-26T18:09:00026 February 2008 18:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Units 3 and 4 Tripped Due to Grid Fluctuations ENS 423992006-03-08T20:53:0008 March 2006 20:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of Emergency Diesel Generators ENS 421372005-11-11T20:02:00011 November 2005 20:02:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip During Startup Following Failure of Rod Control Power Cabinet ENS 421042005-11-01T03:27:0001 November 2005 03:27:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declaration: Loss of Offsite Power Due to Loss of Startup Transformer ENS 420782005-10-26T01:40:00026 October 2005 01:40:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Small Fire at the Main Turbine Area ENS 420672005-10-23T02:54:00023 October 2005 02:54:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Hurricane Wilma ENS 420562005-10-15T11:02:00015 October 2005 11:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater Actuation on a Manual Reactor Trip ENS 420012005-09-19T15:04:00019 September 2005 15:04:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Hurricane Rita ENS 419432005-08-25T03:04:00025 August 2005 03:04:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Hurricane Warning ENS 418002005-06-27T07:16:00027 June 2005 07:16:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Declaration of an Unusual Event Due Transformer Fire >10 Minutes ENS 417432005-06-03T04:33:0003 June 2005 04:33:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Declared Unusual Event Due to Rcs Leakage in Excess of Technical Specification Limit ENS 415112005-03-22T08:47:00022 March 2005 08:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Manually Tripped Following Loss of Main Feed Pump ENS 412982004-12-29T03:46:00029 December 2004 03:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Generator Exciter Cooling Water Leak ENS 412322004-11-30T13:50:00030 November 2004 13:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Dropped Control Rod ENS 412292004-11-29T05:09:00029 November 2004 05:09:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specifications Required Shutdown Due to Dropped Control Rod ENS 410682004-09-24T21:00:00024 September 2004 21:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Hurricane Warning ENS 410072004-09-02T14:56:0002 September 2004 14:56:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared ENS 407522004-05-14T21:29:00014 May 2004 21:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Scram Due to Lowering Steam Generator Level 2023-09-22T22:19:00 | |