ML15176A535 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 06/17/2015 |
From: | Pacific Gas & Electric Co |
To: | Office of Nuclear Reactor Regulation |
References | |
DCL-15-069 | |
Download: ML15176A535 (65) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARDCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023
[Table view]License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2022-02-16016 February 2022 License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses2022-01-13013 January 2022 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition2021-10-0808 October 2021 Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML21188A2142021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance2021-03-29029 March 2021 Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2020-12-0303 December 2020 License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-19-008, License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification2019-02-14014 February 2019 License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 DCL-16-099, License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2016-10-25025 October 2016 License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-09-15015 September 2016 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 DCL-16-057, License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. DCL-16-057, Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2016-01-28028 January 2016 Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) DCL-16-001, License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2016-01-21021 January 2016 License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process DCL-15-105, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2015-08-31031 August 2015 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-091, Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating2015-08-12012 August 2015 Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating DCL-15-080, License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results2015-07-0101 July 2015 License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results ML15176A5302015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 ML15176A5352015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 82015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5292015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 ML15176A5312015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 ML15176A5272015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5342015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15056A7052015-02-25025 February 2015 Update to the Diablo Canyon Power Plant License Renewal Application(Lra), Amendment 49 and LRA Appendix E, Applicant'S Environmental Report-Operating License Renewal Stage, Amendment 2 DCL-15-023, License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident2015-02-25025 February 2015 License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident ML14364A2622014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 1 of 2 ML14364A2642014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 2 of 2 ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)2014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) 2023-09-27 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23241A7642023-05-25025 May 2023
[Table view]7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496277, Rev. 7, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7792023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-8, Drawing 469001, Rev. 3, Restored Cross Sections & Embedment Plan Breakwaters - Restoration & Improvements ML23241A7802023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 441352, Revision 26, Electrical Schematic Diagram 4160V Bus Section F Automatic Transfer, Sheet 1 ML23241A7782023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 501365, Revision 18, Mechanial Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7422023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 455065, Revision 12, Electrical Single Line Meter and Relay Diagram 125V and 250V DC System, Sheet 1 ML23241A0532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-5, Rev. 29, Sheet 5, Extraction Steam and Heater Drip Systems ML23241A7562023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437676, Rev. 29, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7672023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108023, Rev 36, Sheet 2 ML23241A7622023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7742023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 437627, Revision 38, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer, Sheet 1 ML23241A7682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 445295, Revision 13, Electrical Single Line Meter and Relay Diagram 125 Volt and 250 Volt D.C. System, Sheet 1 ML23241A7662023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 111, Sheet 4, Condensate System ML23241A7632023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 437916, Revision 48, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 1F, Sheet 1 ML23241A7572023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 441239, Sheet 1, Rev. 48, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H ML23241A7692023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496281, Rev. 8, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7702023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437667, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 ML23241A7532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Drawing 516111, Sheet 1, Rev. 5, Mechanical Plans, Sections & Details Area L & GE Elev. 140'-0 ML23241A7522023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Drawing 516103, Revision 16, Mechanical Ventilation Flow Diagrams, Sheet 1 ML23241A7542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-1, Drawing 511157, Sheet 1, Rev. 21, Mechanical Control Room Flow Diagram ML23241A7582023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, Drawing 500001, Rev. 1, Piping and Mechanical Area Locaiton Plan ML23241A7442023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441286, Revision 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section F Automatic Transfer ML23241A7462023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102023, Rev. 57, Sheet 2 ML23241A7512023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.14, Drawing 496282, Rev. 13, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator No. 23 Auxiliary Motors ML23241A7652023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437666, Revision 8, Revision 21, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7472023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-19, Drawing 437545, Revision 10, Sheet 1, Electrical Single Line Diagram Pressurized Heaters DCL-23-044, 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams2023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams ML23241A7712023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496276, Revision 7, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 ML23241A7612023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G ML23241A7602023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 ML23241A7762023-05-25025 May 2023 Submittal of Revision 27 to Updated Final Safety Analysis Report ML23241A7432023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3a, Drawing 501366, Revision 30, Mechanical Ventilation Flow Diagram Containment Fuel Handling Fan Rooms, Sheet 1 ML23241A7772023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-10, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus G Automatic Transfer ML23241A7502023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 437614, Revision 37, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System, Sheet 1 ML23241A7482023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms ML23241A7722023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441297, Revision 14, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer, Sheet 1 ML23241A7732023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Drawing 437530, Revision 41, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System, Sheet 1 ML23241A7752023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 5, Rev. 112, Condensate System ML23241A7552023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 441240, Revision 48, Electrical Single Line Meter and Relay Diagram 125V D.C. System, Sheet 1 ML23241A7812023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-10, Drawing 441353, Sheet 1, Rev. 30, Electrical Schematic Diagram 1460V Bus Section G Automatic Transfer ML23241A7592023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441230, Revision 34, Electrical Single Line Meter & Relay Diagram 4160V System Bus Section G & H: DG 21 & 22, Sheet 1 ML23241A7492023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 437542, Sheet 1, Rev. 57, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 1G ML23241A7452023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 441340, Rev. 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H 2023-05-25 |