ML16049A009
From kanterella
Revision as of 10:21, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024
[Table view]Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations 2024-09-09 Category:Response to Request for Additional Information (RAI) MONTHYEARDCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024
[Table view]Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-22-058, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2022-07-20020 July 2022 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22172A1642022-06-21021 June 2022 Response to Public Follow-up Question Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 21, 2022 DCL-22-018, Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently.2022-03-23023 March 2022 Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently. DCL-21-060, Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, 'Ac Sources - Operating,' to Support Diesel Fuel Oil Transfer System.2021-09-14014 September 2021 Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, 'Ac Sources - Operating,' to Support Diesel Fuel Oil Transfer System. DCL-21-048, Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System'2021-07-0707 July 2021 Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System' DCL-21-040, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-05-13013 May 2021 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-034, Response to Request for Additional Information on Final Supplemental Response to Generic Letter 20042021-04-15015 April 2021 Response to Request for Additional Information on Final Supplemental Response to Generic Letter 2004 DCL-20-088, Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report2020-10-16016 October 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System DCL-20-012, Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report2020-03-11011 March 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report DCL-19-088, Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification'2019-10-24024 October 2019 Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification' DCL-19-056, Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation.2019-07-0303 July 2019 Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation. DCL-19-039, Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation2019-05-0202 May 2019 Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation ML19074A1092019-03-14014 March 2019 Response to Letter Dated February 26, 2019, Requesting NRC Opinion on Potential Impacts Due to Pacific Gas and Electric Company'S Bankruptcy Filing DCL-17-108, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..2017-12-18018 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. ML17324B3442017-11-20020 November 2017 Response to NRC Request for Additional Information Regarding Request for Approval of Alternative for Application of Full Structural Weld Overlay, REP-RHRSWOL, Units 1 and 2 DCL-17-073, Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors.2017-08-17017 August 2017 Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors. DCL-17-060, Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U22017-06-21021 June 2017 Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 ML17179A0192017-06-21021 June 2017 PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive .. DCL-16-114, Response to Generic Letter 2016-012016-11-0303 November 2016 Response to Generic Letter 2016-01 DCL-16-101, Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 DCL-16-101, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term DCL-16-094, Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'.2016-09-28028 September 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'. DCL-16-062, Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf..2016-07-0707 July 2016 Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf.. DCL-16-044, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-04-21021 April 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-023, Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39.2016-02-25025 February 2016 Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39. DCL-16-019, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-10010 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. ML16039A3662016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 1 of 2 DCL-16-016, Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 22016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 2 DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-0101 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-013, Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U22016-01-27027 January 2016 Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U2 DCL-16-012, Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application2016-01-26026 January 2016 Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application ML16049A0112016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 DCL-16-011, Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replaceme2016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement ML16049A0092016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-011, Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 92016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 DCL-15-156, Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement2015-12-31031 December 2015 Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement ML15355A5502015-12-21021 December 2015 Transmittal of Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report DCL-15-154, Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report2015-12-21021 December 2015 Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report 2024-08-08 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16049A009&oldid=384843"