ML21348A749
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Other | |
---|---|
EPID:L-2021-LRO-0032, (Open) | |
MONTHYEARML21348A7492021-12-16016 December 2021
[Table View]FSAR Revision 25 Chapter 1 Figures Redacted Project stage: Other 2021-12-16 |
ML21348A749 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 12/16/2021 |
From: | Mahesh Chawla Plant Licensing Branch IV |
To: | Diya F Union Electric Co |
Chawla M | |
References | |
EPID: L-2-21-LRO-0032 | |
Download: ML21348A749 (52) | |
Similar Documents at Callaway | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML23318A1082023-12-28028 December 2023
[Table view]FSAR Chapter 1, Figures Redacted ML23165A2432023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6232022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6222022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6192022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, General Table of Contents ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML22335A5102022-12-0101 December 2022 Attachment 1 - Proposed FSAR Change (Markups) ML21348A7492021-12-16016 December 2021 FSAR Revision 25 Chapter 1 Figures Redacted ML21335A4582021-12-0101 December 2021 Enclosure 6: Proposed Final Safety Analysis Report Changes (Mark-up - for Info Only) 2023-06-14 |
Text
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Figure withheld in accordance with 10 CFR 2.390
Retrieved from "https://kanterella.com/w/index.php?title=ML21348A749&oldid=3804128"