ML24159A195

From kanterella
Revision as of 18:03, 24 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Table 14.0-1 (Unit 2)
ML24159A195
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/30/2024
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24159A261 List: ... further results
References
AEP-NRC-2024-20
Download: ML24159A195 (1)


Text

IINNDDIIAANNAA M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision: 18.1 Table:

14.0-1 Page:

1 of 1 UNIT 2 OCCURRENCES EVALUATED FOR VANTAGE 5 FUEL Fault Conditions Evaluated FSAR Section Accident 14.1.7 Startup of an Inactive Reactor Coolant Loop Fault Conditions Analyzed FSAR Section Accident 14.1.1 Uncontrolled Rod Cluster Control Assembly Bank Withdrawal From a Subcritical Condition 14.1.2 Uncontrolled Rod Cluster Control Assembly Bank Withdrawal at Power 14.1.3 Rod Cluster Control Assembly Misalignment 14.1.4 Rod Cluster Control Assembly Drop 14.1.5 Uncontrolled Boron Dilution 14.1.6 Loss of Reactor Coolant Flow (including Locked Rotor Analysis)1 14.1.8 Loss of External Electric Load or Turbine Trip(1), 2,

14.1.9 Loss of Normal Feedwater3,4 14.1.10 Excessive Heat Removal due to Feedwater System Malfunctions 14.1.11 Escessive Load Increase Incident 14.1.12 Loss of Offsite Power to the Station Auxiliaries (3), (4) 14.2.4 Steam Generator Tube Rupture 14.2.5 Rupture of a Steam Line 14.2.6 Rupture of a Control Rod Drive Mechanism Housing (RCCA Ejection) 14.2.8 Major Rupture of a Main Feedwater Pipe (3), (4) 14.3.1 Major Reactor Coolant Pipe Ruptures 14.3.2 Loss of Reactor Coolant From Small Ruptured Pipes From Cracks in Large Pipes which Actuates the Emergency Core Coolant System 1 Reanalyzed to support PSV setpoint tolerance of +3%.

2 Reanalyzed to support MSSV setpoint tolerance of +3%.

3 Evaluated to support MSSV setpoint tolerance of +3%.

4 Evaluated to support PSV setpoint tolerance of +3%.

UFSAR Revision 32.0