ML21237A236

From kanterella
Revision as of 23:40, 19 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Amendment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components
ML21237A236
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/15/2021
From: Philip Mckenna
NRC/NRR/VPOB
To:
City of Dalton, GA, Georgia Power Co, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co
Gleaves B
Shared Package
ML21237A205 List:
References
EPID L-2021-LLA-0153, LAR-21-001
Download: ML21237A236 (2)


Text

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY

OGLETHORPE POWER CORPORATION

MEAG POWER SPVM, LLC

MEAG POWER SPVJ, LLC

MEAG POWER SPVP, LLC

CITY OF DALTON, GEORGIA

VOGTLE ELECTRIC GENERATING PLANT, UNIT 4

DOCKET NO.52-026

AMENDMENT TO FACILITY COMBINED LICENSE

Amendment No. 186 License No. NPF-92

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern Nuclear Operating Company (SNC),

dated August 24, 2021, complies with the standards and requirem ents of the Atomic Energy Act of 1954, as amended (the Act) and the Commiss ion's regulations set forth in 10 CFR Chapter I;

B. The facility will be constructed and will operate in conform ity with the application, the provisions of the Act, and the rules and regulations of the Commission;

C. There is reasonable assurance (i) that the activities author ized by this amendment can be conducted without endangering the health and s afety of the public, and (ii) that such activities will be conducted in comp liance with the Commission's regulations;

D. The issuance of this amendment will not be inimical to the c ommon defense and security or to the health and safety of the public; and

E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have b een satisfied.

2. Accordingly, the license is amended by changes to the Append ix C of the Facility Combined License as indicated in the attachment to the license amendment. Paragraph 2.D(8) of Facility Combined License No. NPF-92 is hereby amende d to read as follows:

(8) Incorporation

The Technical Specifications, Environmental Protection Plan, a nd ITAAC in Appendices A, B, and C, respectively of this license, as revised through A mendment No. 186, are hereby incorporated into this license.

3. This license amendment is effe ctive as of the date of its is suance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION:

/RA/

Philip J. McKenna, Chief Vogtle Project Office Office of Nuclear Reactor Regulation

Date of Issuance: October 15 th, 2021

Attachment:

Page 7 of the Facility Combined License and affected pages of Appendix C of the Facility Combined License