|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24163A3522024-05-15015 May 2024 Meeting Feedback from May 14, 2024, Meeting with Constellation on Peach Bottom Atomic Power Station Units Nos. 2 and 3 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 2024-09-06
[Table view] |
Text
From: Scott Wall Sent: Monday, October 30, 2023 2:34 PM To: Reynolds, Ronnie J:(Constellation Nuclear)
Subject:
FINAL RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 -
Exemption from Security Rule (L-2023-LLE-0032)
Dear Mr. Reynolds,
By letter dated October 16, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23289A121), Constellation Energy Generation, LLC (CEG) requested an exemption from the compliance date of January 8, 2024, for the implementation of the final rule for Enhanced Weapons, Firearms Background Checks, and Security Event Notifications, that became effective on April 13, 2023, for the Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Peach Bottom).
The NRC staff has reviewed the submitta l and determined that confirmatory information is needed to complete its review. The specific question is found in the enclosed request for confirmation of information (RCI). On October 30, 2023, the CEG staff indicated that a response to the RCIs would be provided by November 17, 2023.
If you have questions, please contact me at 301-415-2855 or via e-mail at Scott.Wall@nrc.gov.
Scott P. Wall, LSS BB, BSP Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov
Docket Nos.: 50-277 and 50-278
Enclosure:
Request for Confirmation of Information
cc: Listserv
RCI (Security Rule: NSIR)
REQUEST FOR CONFIRMATION OF INFORMATION
EXEMPTION FROM SECURITY RULE
CONSTELLATION ENERGY GENERATION, LLC
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
DOCKET NOS. 50-277 AND 50-278
By letter dated October 16, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23289A121), Constellation Energy Generation, LLC (CEG) requested an exemption from the compliance date of January 8, 2024, for the implementation of the final rule for Enhanced Weapons, Firearms Background Checks, and Security Event Notifications, that became effective on April 13, 2023, for the Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Peach Bottom).
The U.S. Nuclear Regulatory Commission (Commission, NRC) staff is reviewing your submittal and has identified areas where confirmatory information is needed to complete its review.
Request for Confirmation of Information:
- 1. Regarding CEGs request for exemption from the January 8, 2024, compliance date, please confirm the following:
o CEG is requesting an exemption for Peach Bottom from specific requirements, as described below, associated with the final rule for Enhanced Weapons, Firearms Background Checks, and Security Event Notifications, as identified in your submission; that would defer compliance with those provisions until December 31, 2024, or 180 days after publication of final Regulatory Guides, whichever is later.
o CEG is not requesting an extension to the compliance date for Peach Bottom for specific requirements in Title 10 of the Code of Federal Regulations (10 CFR)
Part 73, Subpart B, Enhanced Weapons, Preemption, and Firearms Background Checks, described in 10 CFR 73.15, Authorization for Use of Enhanced Weapons and Preemption of Firearms Laws, and 10 CFR 73.17, Firearms Background Checks for Armed Security Personnel.
o CEG is requesting an exemption for Peach Bottom from specific requirements in 10 CFR Part 73, Subpart T, Security Notifications, Reports, and Recordkeeping, 10 CFR 73.1200(a) through 10 CFR 73.1200(t), Notification of Physical Security Events, 10 CFR 73.1205(a)(1) through 10 CFR 73.1205(e),
Written Follow-up Reports of Physical Security Events, 10 CFR 73.1210(a)(1) through10 CFR 73.1210(h), Recordkeeping of Physical Security Events, and Suspicious Activity Reports, 10 CFR 73.1215(a) through 10 CFR 73.1215(f) until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides.
o CEG is requesting an exemption for Peach Bottom from using the definitions for the terms Contraband, and Time of Discovery as recently revised in 10 CFR 73.2, Definitions, until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides. The exemption would not apply to the definitions of those terms that were in effect prior to the issuance of the 2023 revisions.
- 2. Confirm that the current Peach Bottom site security plan implements the requirements of 10 CFR 73.71, Reporting of Safeguards Events for reporting the suspension of security measures.
o Confirm that Peach Bottom will continue to comply with security event reporting, as previously required in 10 CFR 73.71, Reporting of Safeguards Events, and Appendix G to Part 73, Reportable Safeguards Events.
o Confirm that Peach Bottom will use the definitions for the terms Contraband and Discovery (time of) in its site security plan consistent with how these terms are currently defined in Regulatory Guide 5.76, Revision 1, Physical Protection Programs at Nuclear Power Reactors.
- 3. Confirm that when Peach Bottom states that it is implementing the new Access Authorization Rule it actually means that it is implementing the new 2022 10 CFR Part 26 Fitness for Duty Rule (87 FR 71422, November 22, 2022)?
Hearing Identifier: NRR_DRMA Email Number: 2294
Mail Envelope Properties (SA1PR09MB960555B8324F4837CD1F3B8D92A1A)
Subject:
FINAL RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 -
Exemption from Security Rule (L-2023-LLE-0032)
Sent Date: 10/30/2023 2:34:09 PM Received Date: 10/30/2023 2:34:10 PM From: Scott Wall
Created By: Scott.Wall@nrc.gov
Recipients:
"Reynolds, Ronnie J:(Constellation Nuclear)" <Ronnie.Reynolds@constellation.com>
Tracking Status: None
Post Office: SA1PR09MB9605.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 5310 10/30/2023 2:34:10 PM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: