Enclosure 2: Westinghouse Open Session Slide Package for the May 16, 2024, Pre-Application Meeting on Leu+ Expansion at the Columbia Fuel Fabrication Facility
ML24134A276
Person / Time
Site: Westinghouse
Issue date: 05/13/2024
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML24134A273 List:
References
LTR-RAC-24-32
Download: ML24134A276 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-24-32 Enclosure 2 May 13, 2024

ENCLOSURE 2

Westinghouse Open Session Slide Package for the May 16, 2024, Pre-Application Meeting on LEU+ Expansion at the Columbia Fuel Fabrication Facility

(Non-Proprietary)

Westinghouse Non-Proprietary Class 3 © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Columbia Fuel Fabrication Facility 8 wt% Preapplication Meeting May 2024 Annette Pope Elise Malek Ed Wills Nader Mamish

1 Westinghouse Non-Proprietary Class 3 © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Agenda

  • Introductions
  • Low Enriched Uranium to 8 wt% (LEU+)

- Project Objectives

- Overview of Project

- LAR Process

  • Program Timeline
  • Licensing Strategy & Key Deliverables
  • LEU+ Manufacturing Program Organization
  • Process Overview
  • Questions

2 Westinghouse Non-Proprietary Class 3 © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Project Objectives

To support US pressurize water reactor transitions to 24 month refueling cycles, Westinghouse is pursuing an increase in allowable U235 enrichment (>5 wt%) at the Columbia Fuel Fabrication Facility (CFFF) site located in Hopkins, SC.

Westinghouse will construct a new building adjacent to the existing facility to produce fuel assemblies greater than the existing license requirements of 5 wt%.

The new building will operate at 8 wt%. No changes to the existing fuel factory.

The expansion and processes for 8wt% will require prior NRC approval of the License Amendment Request to the CFFF Special Nuclear Material License (SNM-1107) per 10 CFR 70.72.

3 Westinghouse Non-Proprietary Class 3 © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Overview of Project

  • Dry conversion process 8% enriched UF6
  • Ammonia free process Conversion
  • Lower emissions with use of dry process
  • Automated conversion lines and enclosed processes
  • Advanced Doped Pellet Technology (ADOPT) blending Pelleting
  • Automated pelleting lines and enclosed processes
  • Integral Fuel Burnable Absorber (IFBA) dry room Burnable
  • Automated rod loading and welding Rods
  • Ammonia free process
  • New processes do not require retention ponds Recovery
  • 30B cylinder wash and recertification The new building and selected technology will
  • Gadolinium separation and uranium recovery process incorporate sustainability principles and automation
  • Eliminate fuel assembly washing
  • Single control access point Mechanical
  • Ship in Traveller shipping container (Submittal in Q1 2026)

4 Westinghouse Non-Proprietary Class 3 © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Questions?

5