February 4, 2021 Columbia Risk Reduction & Environmental Update
ML21026A021
Person / Time
Site: Westinghouse
Issue date: 02/04/2021
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
DTiktinsky - NMSS/DFM/FFL - 301.415.8740
References
Download: ML21026A021 (10)


Text

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Columbia Risk Reduction & Environmental Update NRC Public Meeting February 4, 2021 1

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Leaving a new legacy:

One of environmental excellence

  • Path Forward:
  • Execute our Environmental Excellence Plan and Global Manufacturing Strategic Priority
  • Comprehensively address all legacy issues; leave no questions
  • Continue to implement future-focused strategies based upon industry best practices
  • Foster a culture of transparency and doing the right thing
  • Build productive relationships with our community and key external stakeholders
  • While we address our legacy issues, we are building a culture that will achieve and sustain environmental excellence:
  • Conceptual Site Model/Extensive monitoring strategy
  • Remediation Strategy document
  • Investment in people, systems, and equipment
  • Leveraging experts
  • Intrusive management engagement and critical oversight 2

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Risk Reduction

  • Implement Environmental Recovery/Consent Agreement Plan Actions
  • Implement Remediation Strategy Document
  • Improve Items Relied on for Safety Margin
  • Reduce Collective Radiation Exposure
  • Industrial Safety and Fire Program Improvement Plans
  • Investment in Environmental Health & Safety (EHS)

Systems and Equipment Our new site leaders, corporate leaders, and owners are setting a clear tone and new standards of excellence for Environmental Health &

Safety performance, and risk reduction 3

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Environmental Improvements

  • Eliminated sources of potential stormwater contamination from retired roof equipment
  • Eliminated 100% of Sealand container storage containing radioactive materials
  • Eliminated use of PCE in the solvent extraction process and disposed of bulk solvent mixture
  • Eliminated Plating Room and its Scrubber
  • Eliminated Chemistry Laboratory Scrubber
  • Eliminated old Spiking Station design risk
  • Completed wastewater treatment plant chlorination upgrades
  • Added dedicated URRS department manager
  • Completed extensive Fire Protection upgrades - Fire Brigade certified as a Fire Department 4

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Environmental Risk Reduction Activities Roof Equipment - Before Sealands Roof Equipment - After 5

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Environmental Risk Reduction Activities Elimination of Perchloroethylene We have eliminated the use of Volatile Organic Compounds used in uranium recovery operations

  • Completed shipment and disposal of bulk solvent containing perchloroethylene (PCE)
  • Modified uranium recovery process in Before After service May 12, 2020

- New process uses Dodecane

- Eliminated the need for PCE

  • Off-loaded remaining Sealands containing drums with residual PCE
  • Created storage locations for PCE drums pending EPA-approved disposition strategy 6

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Future Environmental Improvement Activities

  • Complete Spiking Station #1 modifications/floor upgrade (March 2021)
  • Complete Sanitary Lagoon Sludge characterization to determine closure method (April 2021)
  • Remediate & close the East Lagoon (June 2021)
  • Complete planned sitewide remedial investigation in accordance with SC DHEC Consent Agreement (June 2021) 7

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Remediating Legacy Issues

  • DHEC Consent Agreement -

signed on Feb 26, 2019

- Conceptual Site Model

- Communication Protocol

- Work Plans/Routine Meetings

- Phase I RIWP completed

- Phase II RIWP began in November and continues through June 2021 Remedial Final Approval of Remedial Action Feasibility Study Design /

RI Work Plan RI Report FS / Record of Completion (FS) Remedial Action Decision Report Work Plan We are Here Comprehensive CA signed with SCDHEC to address historical impacts following the CERCLA process and to promote the involvement of the local community and other key stakeholders 8

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Communications & Community Engagement

  • Columbia Fuel Fabrication Facility Website

- Source of publicly available information for ease of use

- http://www.westinghousenuclear.c om/columbiacommunity

  • Dedicated Communications and Community Resources

- We have resources located at the Columbia Fuel Fabrication Facility dedicated to engaging and managing community relations 9

© 2021 Westinghouse Electric Company LLC. All Rights Reserved.

Summary

  • The Columbia facility has been transformed from an environmental perspective over the past two years
  • We are implementing a sustainable culture change that influences all aspects of our performance
  • We are rooting this change in a culture of strong self-identification, doing the right thing regardless of how hard it may be and, transparency with all stakeholders
  • Reinvigorated corporate oversight and support to ensure we remain on track and drive sustainable change Focused on leaving a legacy of environmental excellence 10