Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv SetpointsML24208A174 |
Person / Time |
---|
Site: |
Hatch |
---|
Issue date: |
07/26/2024 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
Download: ML24208A174 (2) |
|
Similar Documents at Hatch |
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24208A1742024-07-26026 July 2024 Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv Setpoints ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch 2024-07-26
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION HATCH 1 AND 2 - REVISE TS SR (3.4.3.1 & 3.1.7.7) TO INCREASE S/RV SETPOINTS SOUTHERN NUCLEAR OPERATING COMPANY HATCH, UNITS 1, 2 DOCKET NO. 05000321, 05000366 ISSUE DATE: 07/26/2024
=
Background===
By letter dated April 19, 2024 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML24110A098), Souther n Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2. The proposed LAR revises Technical Specification (TS) Surveillance Requirement (SR) 3.4.3.1 to increase the nominal mechanical relief setpoints for all safety/relief valves (S/RVs) of the reactor coolant syst em (RCS) nuclear pressure relief system (NPRS). The proposed changes will reduce the potential for S/RV pilot leakage. As a result of the increased S/RV setpoints, the LAR also proposes to change SR 3.1.7.7 to increase the minimum Standby Liquid Control pump discharge pressure accordingly.
To complete its review of the application, U.S. Nuclear Regulatory Commission (NRC) staff determined that additional information is needed as described below.
Regulatory Basis
Title 10 of the Code of Federal Regulations (10 CFR) Part 50.36, Technical Specifications, specifies the content required to be included in technical specifications.
Request For Additional Information
Question 1
10 CFR 50.36(c)(3), Surveillance requirements, states that surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that fac ility operation will be within safety limits, and that the limiting conditions for operation will be met.
Section 3.0 of Enclosure 1 to the LAR discusses GE Nuclear Energy technical report NEDC-32041P, Safety Review for Edwin I. Hatch Nuclear Power Plant, Units 1 and 2, Updated Safety/Relief Valve Performance Requirements, Rev. 2, April 1996, which provided a detailed justification for an upper value mechanical S/RV relief setpoint as high as 1,195 psig, with one S/RV inoperable and at least 50 psi margin to the ASME BPV Code upset limit (1,375 psig).
1 Section 2.2 of NEDC-32041P states that this margin allows for variations in the peak vessel pressure which were calculated for past cycles and may be predicted for future fuel cycles. This implies that some of the 50 psi margin may be used, and therefore, peak pressure could potentially be larger than 1,325 psig. However, the Hatch TS Safety Limit in TS 2.1.2 states that reactor steam dome pressure shall be 1,325 psig.
Please confirm that the steam dome pressure safety limit is not exceeded in a) the analysis performed for the subject LAR and b) as part of the cycle-specific reload licensing analyses for future cycles.
Question 2
The NRC issued Generic Letter (GL) 89-10, Safety-Related Motor-Operated Valve Testing and Surveillance, (June 28, 1989) to extend the scope of the motor-operated valve (MOV) testing program in Bulletin 85-03 and its Supplement 1 to all safety-related MOVs in nuclear power plants. The NRC issued seven supplements to GL 89-10 as MOV issues were identified during its implementation by nuclear power plant licens ees. As a follow-up to the GL 89-10 programs, the NRC issued GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, (September 18, 1996) to request that licensees verify on a periodic basis that safety-related MOVs continue to be capabl e of performing their safety functions within the current licensing bases of the facility.
Historically, MOV inservice testing was performed under American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, until the preparation of the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code), usually without fluid pressure or flow in the lines (referred to as static testing). Based on operating and research experience, and the results of the GL 89-10 and 96-05 programs, the NRC conducted rulemaking to require in 10 CFR 50.55a(b)(3)(ii) as a compliance backfit that licensees must establish a program to ensure that MOVs continue to be capable of performing their design basis safety functions in addition to the ASME OM Code testing requirements. The purpose of the rulemaking is to periodically confirm that MOVs will perform their safety functions under design-basis conditions (i.e., under pressure and flow conditions) and, if possible, to identify the causes of MOV failures.
Section 3.0 of Enclosure 1 to the LAR states The impacts on MOVs due to the potential for increased reactor vessel and system pressure as a result of the increase in the S/RV nominal opening setpoint are evaluated in accordance with the Generic Letter 89-10 requirements as part of the SNC design process. However, there are no results provided of any evaluation.
Please provide a summary of SNC's evaluation of MOVs in the high-pressure systems (HPCI and RCIC) to confirm they will remain operable given the increased S/RV setpoint pressure.
2