ML20054G259

From kanterella
Revision as of 12:23, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Application to Amend Licenses DPR-57 & NPF-5 Increasing Min Shift Crew Composition Requirements as Shown in Table 6.2.2-1 & Required by NUREG-0737
ML20054G259
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/11/1982
From: Widner W
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20054G260 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-TM TAC-49071, TAC-49072, NUDOCS 8206210330
Download: ML20054G259 (2)


Text

r, . , , n -, o . . r ,

a r. .,r,,,,

/ ' c'.3 G. r ;a 33iW Ir - o r i 1'd ' }6 1C; ,

u,: . r-sv u y June 11, 1982 Georgia Power W. A. Widner

, .dr. i mj f .;r s f ,,gi P,a ,7. y; 3

f' jfd,  ; Gt + rd! On Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 tRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 REQUEST FOR CHANGE TO TFE TECHNICAL SPECIFICATIONS Gentlemen:

Pursuant to 10 CFR 50.59(c)(1), Georgia Power Company hereby requests a change to the Technical Specifications (Appendix A to the Operating License) for both Plant Hatch Units 1 and 2.

The proposed change would increase minimum shift crew composition requirements as shown in Table 6.2.2-1 for both units. These revised minimum requirements are required by NUREG-0737.

The Plant Review Board and Safety Review Board have reviewed and approved the proposed change and determined that it does not involve an unreviewed safety question. Since minimum shift crew requirements are increased in all cases, margins of safety are not decreased.

Included with the proposed changes is a determination of amendment class and appropriate payment.

W. A. Widner states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COMPANY 8206210330 820611 PDR ADOCK 05000321 P PDR By: 2M d'. L O N. Of, W. A. Widner Sworn to and subscribed b fore me this 11th day of June,1982 Mged'

/

/1- '

((/Notary

// Public

/M/

Notary Public. Georgia. State at Large My Comrmssion Expires Sect. 20.19R1 g,oO REB /mb Enclosure xc: H. C. Nix R. F. Rogers, III J. P. O'Reilly (NRC-Region II)

ATTACFHENT 1 PEC D00(ET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 RECUEST FOR CHANT TO TECFNICAL SPECIFICATIONS The proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page 6-4 6-4

.