Text
'
i S/RVs 3.4.3 1
SURVEILLANCE REQUIREMENTS' SURVEILLANCE FREQUENCY i
SR 3.4.3.1 Verify the safety function lift setpoints In accordance of the S/RVs are as follows:
with the Inservice i
Number of Setpoint Testing Program S/RVs (osia) 11 1150
- 34.5 Following testing, lift settings shall be within
- 15.
4
' HATCH UNIT 1 3.4-8 Amendment No. 208
- u 9 88eR B u88 6 p
j ECCS - Operating j
3.5.1 SURVEILLANCE REQUIREMENTS' (continued)
(
SURVEILLANCE FREQUENCY e
SR 3.5.1.12 Verify each ADS valve relief mode actuator 18 months strokes when manually actuated.
s HATCH UNIT 1 3.5-6 Amendment No. 208
..y.__.__.__..-___.___
S/RVs 3.4 3 0
l SURVEILLANCE REQUIREMENT $'
SURVEILLANCE FREQUENCY i
i s
i SR 3.4.3.1 Verify the safety function lift setpoints In accordance j
1 of the S/RVs are as followst with the Inservice Number of Setpoint Testing Program i
S/RVs fosia) 11 1150
- 34.5 i
Following testing, lift settings shall be within i 1%.
i I
a i
1 e
i i
i 1
l d
k 4
HATCH UNIT 2-3.4-8 Amendment No. 150 4
.--,.-_,--.....,_....-,___.__,,m
ECCS -- Operating 3.5e1 SURVEILLANCE REQUIREMENTS ^ (continued)
SURVEILLANCE FREQUENCY j
NOTE--------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
l Verify, with reactor pressure s 165 psig, It rynths
'he HPCI pump can develop a flow rate l
k 4250 gpm against a system head corresponding to reactor pressure.
SR 3.5.1.10
NOTE---------.-------
Vessel injection / spray may be excluded.
Verify each ECCS injection / spray subsystem 18 months actuates on an actual or simulated automatic initiation signal.
SR 3.5.1.11
NOTE--------------------
Valve actuation may be excluded.
Verify the ADS actuates on an actual or 18 months simulated automatic initiation signal.
SR 3.5.1.12 Verify each ADS valve relief mode Lctuator 18 months strokes when manually actuated.
(continued)
HATCH UNIT 2 3.5-5 Amendment No. 150