HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433

From kanterella
Jump to navigation Jump to search

Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433
ML20071H680
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/08/1994
From: Beckham J
GEORGIA POWER CO.
To:
Shared Package
ML20071H683 List:
References
RTR-NUREG-1433 HL-4620, TAC-M87310, TAC-M87311, NUDOCS 9407190441
Download: ML20071H680 (3)


Text

l t Georgi Power Company 5 40 inverrmss C;nter Pirkway Pott Offiz Box 1295 I Birmingham, Alabama 35201 f Telephone 20s 877-7279 J. T. Beckham, Jr. Georgia Power Vice President - Nuclear Hatch Project fu ou"em NNc svun Docket Nos. 50-321 HL-4620 50-366 TAC Nos. M87310 M87311 Edwin I. Hatch Nuclear Plant Request to Revis. Technical Specifications:

ILnPmved Standard Technical Specifications Submiltal Revision Gentlemen:

By letter dated February 25, 1994, GPC proposed to conven the current Edwin I. Hatch Nuclear Plant Technical Specifications to the Improved Technical Specifications consistent with NUREG 1433. Attached is a partial revision to the February 25 amendment request. The attachmot includes page change insertion instructions This revision is the result of meetings and discussions with the NRC staff, resolution ofindustry generic issues, and additional analysis to suppon a change in the drywell pressure limiting condition for operation. Any revisions to, or auditional no significant hazards evaluations, are also provided. The Environmental Assessment provided in the February 25,1994 submittal remains valid.

In accordance with the requirements of 10 CFR 50.91, a copy of this letter and all applicable athhments will be sent to the designated State official of the Environmental Protection Division of the Georgia Depenment of Natural Resources.

Mr. J. T. Beckham, Jr. states he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.

GEORGIA POWER COMPANY BY: bh v J. T. Beckham, Jr[

Sworn to andsubscribed before me this day$of _ , I99-1.

Notagr Public M N D D EIER 4 ffe?

SRM/cr v - ,

3 c.

9407190441 940709 si PDR ADOCK 05000321 3 \ g P PDR L

)

~1

- GeorgiaPower A 1

.I i

1 U.S. Nuclear Regulatory Commission Page Two July 8, 1994

Attachment:

Edwin I. Hatch Nuclear Plant Unit I and Unit 2 t Improved Technical Speci0 cations, Revision B cc: Georgia Power Company Mr H. L. Sumner, Nuclear Plant General Manager ,

NORMS i

U.S. Nuclear Regulatorv Commission. Washineton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch Mr. C. Grimes, Technical Specifications Branch U.S. Nuclear Regulatory Commission. Region H Mr. S. D. Ebneter, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch State ofGeorgia i

'. Mr. J. D. Tanner, Commissioner - Department of Natural Resources [

I

[

f i

1

?

6

ATTACHMENT EDWIN I. HATCH NUCLEAR PLANT UNIT 1 AND UNIT 2 IMPROVED TECHNICAL SPECIFICATIONS Rahion B i ,

e P

c r

?

l 1

1 It1A620 i l

i