Technical Specifications Task Force
Jump to navigation
Jump to search
Technical Specifications Task Force (TSTF) is an industry group responsible for developing standard changes to the Technical Specifications which individual licensees may request adoption from the NRC.
- docket = PROJ0753
Start date | Title | TSTF | Topic | |
---|---|---|---|---|
ML24268A327 | 24 September 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions | TSTF-604 | Pre-submittal |
ML24264A023 | 20 September 2024 | RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency | TSTF-600 | Surveillance Frequency Control Program |
ML24262A113 | 18 September 2024 | TSTF-596 Rev 1 Expand the Applicability of the Surveillance Frequency Control Program (SFCP) Additional Corrections Needed | TSTF-596 | Surveillance Frequency Control Program |
TSTF-24-07, PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force | 13 September 2024 | PRM-50-126 - Petition for Rulemaking to Amend 10 CFR 50.36, Technical Specifications from Brian D. Mann on Behalf of the Technical Specifications Task Force | TSTF-493 TSTF-505 | Probabilistic Risk Assessment Surveillance Frequency Control Program Operability Determination Pressure Boundary Leakage Backfit |
ML24249A148 | 11 September 2024 | Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements | TSTF-576 | |
ML24249A145 | 11 September 2024 | Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements | TSTF-576 | Surveillance Frequency Control Program Maintenance Rule Program Simmer margin |
ML24247A134 | 6 September 2024 | Final Model SE of Traveler TSTF 592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-592 | Reactor Vessel Water Level |
ML24247A316 | 6 September 2024 | Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-592 | |
EPID:L-2024-PMP-0011 | 14 August 2024 | TSTF-602 | ||
ML24222A400 | 14 August 2024 | TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter | TSTF-602 | |
ML24289A034 | 8 August 2024 | Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk | TSTF-585 | |
ML24204A271 | 1 August 2024 | TSTF-576 Safety Evaluation Supplement | TSTF-576 | Shutdown Margin Simmer margin |
ML24106A276 | 1 August 2024 | Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) | TSTF-576 | |
ML24053A102 | 1 August 2024 | Draft Traveler Safety Evaluation of TSTF-576, Revise Safety/Relief Valve Requirements | TSTF-576 | Maintenance Rule Program Simmer margin |
EPID:L-2024-PMP-0007 | 25 July 2024 | TSTF-601 | ||
ML24207A146 | 25 July 2024 | Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML24207A159 | 25 July 2024 | Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) | TSTF-585 | |
ML24207A182 | 25 July 2024 | TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter | TSTF-601 | |
ML24172A054 | 20 June 2024 | TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency | TSTF-600 | |
ML24170B041 | 18 June 2024 | Draft Model SE of TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-592 | Reactor Vessel Water Level |
ML24169A406 | 20 May 2024 | Draft Traveler TSTF-604, Revise Ventilation System Actions | TSTF-448 TSTF-287 TSTF-426 TSTF-423 TSTF-432 TSTF-431 TSTF-604 | Safe Shutdown Probabilistic Risk Assessment Surveillance Frequency Control Program Recently irradiated fuel Affidavit Control Room Habitability |
ML24064A155 | 17 May 2024 | LIC-600, Revision 2, Standard Technical Specifications Change Traveler Review and Adoption Process | TSTF-542 TSTF-445 | Exemption Request Backfit Pre-submittal |
ML24129A067 | 8 May 2024 | 5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements | ||
ML24129A066 | 8 May 2024 | 5_8_24 Meeting Handouts - History of Traveler Adoption | ||
ML24129A065 | 8 May 2024 | 5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities | TSTF-576 TSTF-585 TSTF-596 TSTF-601 TSTF-599 TSTF-600 TSTF-597 TSTF-602 TSTF-603 | Surveillance Frequency Control Program |
ML24121A243 | 30 April 2024 | Draft TSTF-603, Revise the Risk Informed Completion Time Backstop | TSTF-505 TSTF-567 TSTF-603 | Post Accident Monitoring Surveillance Frequency Control Program Scaffolding Affidavit |
EPID:L-2024-PMP-0003 | 24 April 2024 | TSTF-597 | ||
ML24114A257 | 24 April 2024 | TSTF-599 Acceptance Review Letter | TSTF-599 | |
EPID:L-2024-PMP-0000 | 24 April 2024 | TSTF-599 | ||
ML24114A265 | 24 April 2024 | TSTF-597 Acceptance Review Letter | TSTF-597 | |
EPID:L-2024-PMP-0005 | 22 April 2024 | TSTF-600 | ||
ML24113A152 | 22 April 2024 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML24067A163 | 7 March 2024 | NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing Risk | TSTF-505 TSTF-585 | Large early release frequency |
ML24044A140 | 8 February 2024 | TSTF Handout for 02/08/2024 Quarterly Meeting | TSTF-359 TSTF-576 TSTF-584 TSTF-585 TSTF-588 TSTF-589 TSTF-591 TSTF-592 TSTF-593 TSTF-596 TSTF-601 TSTF-599 TSTF-600 | Surveillance Frequency Control Program |
ML24038A349 | 7 February 2024 | NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency | TSTF-545 TSTF-600 | Incorporated by reference Pre-submittal |
ML24032A469 | 1 February 2024 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML24029A147 | 31 January 2024 | TSTF-592 Cover Letter for Final SE of TSTF-592 | TSTF-592 | |
ML24029A148 | 31 January 2024 | Final Traveler SE of TSTF-592 | TSTF-505 TSTF-59 TSTF-592 | Reactor Vessel Water Level |
ML24009A262 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency | TSTF-600 | Pre-submittal |
ML24009A263 | 9 January 2024 | Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators | TSTF-599 | Pre-submittal |
ML23325A213 | 18 December 2023 | Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | TSTF-591 | |
ML23325A214 | 18 December 2023 | Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | TSTF-591 | Probabilistic Risk Assessment |
ML23321A125 | 18 December 2023 | Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements | TSTF-505 TSTF-14 TSTF-592 | Reactor Vessel Water Level |
ML24016A270 | 12 December 2023 | TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk | TSTF-585 | |
ML23299A250 | 26 October 2023 | Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force | ||
ML23269A151 | 26 September 2023 | Draft Model SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-591 | Probabilistic Risk Assessment |
ML23262B229 | 21 September 2023 | Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-591 | |
ML23262B230 | 21 September 2023 | Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | TSTF-505 TSTF-591 | Probabilistic Risk Assessment |
ML23257A158 | 18 September 2023 | NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23 | TSTF-601 | Pre-submittal |
ML23124A221 | 11 September 2023 | Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown | TSTF-589 | |