ML21105A762
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML21105A762 | |
Person / Time | |
---|---|
Site: | Consolidated Interim Storage Facility |
Issue date: | 04/12/2021 |
From: | Consolidated Interim Storage Facility |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML21105A766 | List: |
References | |
E-58496 | |
Download: ML21105A762 (1) | |
Similar Documents at Consolidated Interim Storage Facility | |
---|---|
Category:Report
MONTHYEARML21188A1012021-09-13013 September 2021
[Table view]Public Final Safety Evaluation Report, Interim Storage Partners, Materials License SNM-2515, WCS Consolidated Interim Storage Facility ISFSI ML21188A0982021-09-13013 September 2021 License Preamble, Interim Storage Partners, Issuance of Materials License SNM-2515, WCS Consolidated Interim Storage Facility ISFSI ML21258A4022021-09-12012 September 2021 Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A4072021-09-10010 September 2021 Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A3982021-09-0303 September 2021 Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7852021-04-12012 April 2021 Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21154A2992021-03-23023 March 2021 Fws Updated List of Threatened and Endangered Species for the Proposed ISP CISF ML21155A1432021-03-15015 March 2021 a Demographic Profile: Combined Area (Andrews County, Tx; Gaines County, Tx; Lea County, Nm) ML21154A2962021-02-19019 February 2021 Profile of Socioeconomic Trends: Combined Area (Andrews County, Tx; Gaines County, Tx; Lea County, Nm) ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4552020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4572020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4582020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 ML20261H4592020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs ML20261H4602020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20128J3002020-04-28028 April 2020 Attachment 7: HI-STORM 100 FSAR Proposed Changed Pages ML20128J2992020-04-28028 April 2020 Attachment 6: HI-STORM 100 FSAR Proposed Changed Pages ML20104C0522020-03-31031 March 2020 Attachment 4: Proposed HI-STORM Umax FSAR Supplement I, Revision 3.I ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages ML21158A1172019-12-0909 December 2019 Revised Scientific Notebook 1335E for the ISP Consolidated Interim Storage Facility EIS Supporting Calculations (Transportation of Snf) 2021-09-03 Category:Technical MONTHYEARML21258A4022021-09-12012 September 2021
[Table view]Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A4072021-09-10010 September 2021 Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A3982021-09-0303 September 2021 Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21105A7852021-04-12012 April 2021 Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4552020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4572020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4582020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 ML20261H4592020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs ML20261H4602020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20128J3002020-04-28028 April 2020 Attachment 7: HI-STORM 100 FSAR Proposed Changed Pages ML20128J2992020-04-28028 April 2020 Attachment 6: HI-STORM 100 FSAR Proposed Changed Pages ML20104C0522020-03-31031 March 2020 Attachment 4: Proposed HI-STORM Umax FSAR Supplement I, Revision 3.I ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages 2021-09-03 |
Text
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 5 Attachment D Seismic Hazard Evaluation for WCS CISF (147 pages)
Proprietary Information on Cover page, Study Revision Page, Stamp Page, pages i to v, ES-1 and ES-2, 1-1 to 1-3, 2-1, 3-1 to 3-4, 4-1 to 4-6, 5-1 to 5-10, 6-1 and 6-2, 7-1 to 7-8, 8-1, 9-1, 10-1 to 10-7, Table 1 (2 pages),
Table 2 to Table 4, Table 5a to Table 5c, Figure 1 to Figure 40, Figure 41a to Figure 41c, Figure 42 to Figure 67, A-1 to A-15, B-1, C-1 Withheld Pursuant to 10 CFR 2.390 Page D-1
Retrieved from "https://kanterella.com/w/index.php?title=ML21105A762&oldid=3598074"