ML21188A098

From kanterella
Jump to navigation Jump to search
License Preamble, Interim Storage Partners, Issuance of Materials License SNM-2515, WCS Consolidated Interim Storage Facility ISFSI
ML21188A098
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 09/13/2021
From: Shana Helton
Division of Fuel Management
To:
Consolidated Interim Storage Facility
DHabib NMSS/DFM/STL 301.415.1035
Shared Package
ML21188A096 List:
References
Download: ML21188A098 (3)


Text

INTERIM STORAGE PARTNERS, LIMITED LIABILITY COMPANY DOCKET NO. 72-1050 WCS CONSOLIDATED INTERIM STORAGE FACILITY INDEPENDENT SPENT FUEL STORAGE INSTALLATION MATERIALS LICENSE NO. SNM-2515

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application filed by Interim Storage Partners, Limited Liability Company (the applicant),

for a materials license to receive, store, transfer, and possess power reactor spent fuel, associated radioactive material, and greater-than-Class-C radioactive waste at the WCS Consolidated Interim Storage Facility (CISF) Independent Spent Fuel Storage Installation (ISFSI) in Andrews County, TX, meets the standards and requirements of the Atomic Energy Act of 1954, as amended (Act), and the Commissions regulations set forth in 10 CFR Chapter I, Nuclear Regulatory Commission; B. The WCS CISF ISFSI will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. The applicants proposed ISFSI design complies with the criteria in 10 CFR Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste, Subpart F, General Design Criteria; D. The proposed site complies with the criteria in 10 CFR Part 72, Subpart E, Siting Evaluation Factors; E. The proposed ISFSI would not pose an undue risk to the safe operation of the WCS radioactive material disposal facilities; F. The applicant is qualified by reason of training and experience to conduct the operations covered by the regulations in 10 CFR Part 72; G. The applicants operating procedures to protect health and to minimize danger to life and property are adequate; H. The applicant is financially qualified to engage in the activities in accordance with the regulations in 10 CFR Part 72, subject to the conditions specified in the license; I. The applicants quality assurance plan complies with 10 CFR Part 72, Subpart G, Quality Assurance; J. The applicants physical protection provisions comply with 10 CFR Part 72, Subpart H, Physical Protection; K. The applicants personnel training program complies with 10 CFR Part 72, Subpart I, Training and Certification of Personnel;

L. The applicants decommissioning plan and its financing pursuant to 10 CFR 72.30 provide reasonable assurance, subject to the conditions specified in the license, that the decontamination and decommissioning of the WCS CISF ISFSI at the end of its useful life will provide adequate protection to the health and safety of the public; M. The applicants emergency plan complies with 10 CFR 72.32; N. The applicant has satisfied the applicable provisions of 10 CFR Part 170, Fees for Facilities, Materials, Import and Export Licenses, and Other Regulatory Services Under the Atomic Energy Act of 1954, as Amended; O. There is reasonable assurance that (i) the activities authorized by this license can be conducted without endangering public health and safety, and (ii) such activities will be conducted in compliance with the Commissions regulations; P. The issuance of this license will not be inimical to the common defense and security; and Q. The issuance of this license is in accordance with 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, of the Commissions regulations and all applicable requirements have been satisfied.

2. This license is effective as of the date of its issuance and shall expire at midnight on September 13, 2061.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION Shana R. Helton, Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards

Enclosure:

License SNM-2515 Date of Issuance: September 13, 2021 Shana R.

Helton Digitally signed by Shana R. Helton Date: 2021.09.13 08:51:26

-04'00'