(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:License-Operator
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22342B2602022-10-14014 October 2022 10 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments IR 05000416/20173022017-11-30030 November 2017 NRC Initial Operator Licensing Examination Approval 05000416/2017302 ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 2024-03-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2602022-10-14014 October 2022 10 Public Forms ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML16291A2602016-10-13013 October 2016 Notification of NRC Initial Operator Licensing Examination 05000416/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 12016-07-29029 July 2016 NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16019A3402015-12-14014 December 2015 2015-12 Post Exam Comments 2024-03-21
[Table view] |
Text
Grand Gulf 2020-02 Draft Operating Test Comments NOTE: This summary is being provided in lieu of Form 301-7, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.
Scenario 1:
- Event 7 - add 4 minutes after (Pg. 5)
- Event 8 - trigger at -100 (Pg. 5)
- Event 8 (Pg. 1) add lockout
- Event 3 - list CR to be manipulated
- Event 4 - Add 3.3.6.4 TS to D2
- Event 7 - increase leak size to 1.0 at -60
- All Events - ensure CTs are labeled consistently Scenario 2:
- Pg. 8 - add booth note that other operators will address 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO
- Pg. 13 - add note that TS 3.1.3 applies for only CR 60-37 (because of location of air leak)
- CT-2 NO LONGER a critical task
- Bound CT-1 to prevent MSIV closure Scenario 3:
- Event 1 - time 9 - delete bullets 2, 5, and 6
- Event 3 - time 24 - for pressure, add panel number and indicator
- Event 3 - time 29 - add TRM 3.5.1
- Event 4 - change leak from 25% to 15%
- Event 6 - time 47 - add and/or RCIC after HPCS Scenario 4:
- Add initial TS references to D1 and turnover sheet
- Event 4 - revise note on page 18 to say 3rd control rod (not 4th)
- Event 4 - time 32 - add CRs to be inserted
- Event 4 - time 31 - add and parameters after pumps JPM S1:
- Initiating cue: The CRS directs you totransfer reactor recirc IAW etc.
- Indicate step 1 already complete JPM S-2:
- Step 8 cue add after report, and direct to verify high drywell pressure response.
JPM S-4:
- Provide illustrations and mock-up for simulator administration JPM P-1:
- Specify difference between orange lights and orange targets JPM P-2:
- How is fire door kept open? (need to know post-exam)
JPM P-3:
- Step 7 - add EDG is shutting down
- Step 8 - ensure attachment has procedure to place EDG in maintenance JPM AS-1:
- Add 10 CFR reference to task standard JPM AS-2:
- Change validation time to 15 minutes
- Change summary to two critical steps
- Step 3 cue - if needed, specify air isolation valve inoperable JPM AS-3:
- Add answer key and as given handout
- Change summary to two critical steps
- Add task standard bullet to be IAW answer key
- Change validation time to 15 minutes JPM AS-4:
- Replace JPM. While it appears desirable on the surface to have the SROs classify the event on one of their simulator scenarios, varying performance by the applicants (i.e. a missed critical task) could result in different plant conditions at scenario termination, which could also result in differing emergency classifications between JPMs. Test EP classification as part of the written exam and make new AS-5 a protective action recommendation.
- In replacement JPM, revise task standard for ONLY C, D, and E to 10 miles per answer key JPM AR-1:
- Step 3 and 4 - change 05-1-02-III-3 to 05-1-02-III-6
- Step 4 - add actual values in standard for power and flow +/- 2%
- Modify task standard to be consistent with above Step 4 change
- Add feedwater temperature to cue (normal for plant conditions)
JPM AR-2:
- Add marked up attachment 1 in step 1 and specify per attachment 1 in step 1
- Step 2 - RCIC not running per narrow range requirements
- Step 3 - HPCS not injecting due to wide range requirements
- Step 3 - revise task standard to determine HPCS running but not injecting due to WR level > 53.5
- Add box for HPCS and RCIC to specify injection/running and have applicant denote status
- Revise to have three critical steps in summary JPM AR-3:
- Step 2 - add actual value in standard
- Task standard - add values to first two bullets; bullet 3 delete the individuals supervisor recommends, delete bullets 4 and 5 JPM AR-4:
- Change summary to 6 critical tasks
- Step 3 - change TTB to time to 200 degrees
- Task standard last bullet delete approximately and specify +/- 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />