Letter Sequence Other |
---|
|
|
MONTHYEARML20071J3931994-06-30030 June 1994 Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant Project stage: Other 1994-06-30
[Table View] |
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20129D8211996-02-23023 February 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station ML20071J3931994-06-30030 June 1994 Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant ML20057E5921993-09-30030 September 1993 Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant ML20086F7071991-10-31031 October 1991 Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1 ML20058F8691990-10-31031 October 1990 PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station ML20069N4871990-08-17017 August 1990 Station Blackout Evaluation, Final Technical Evaluation Rept ML20083B5491990-07-13013 July 1990 Monthly Rept for June 1990 for FIN B-5699, ISLOCA Research Program ML20083B4731990-02-16016 February 1990 Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station, Draft Rept ML20070Q6431989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Davis-Besse ML20245E9211988-08-31031 August 1988 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Davis-Besse Unit 1 ML20238A9461987-08-31031 August 1987 DAVIS-BESSE Uncertainty Study ML20214R2061987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Davis-Besse, Final Informal Rept ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210C1661986-03-0707 March 1986 Masonry Wall Design,Davis-Besse Unit 1, Technical Evaluation Rept ML20151L3451985-12-0606 December 1985 Suppl to Technical Evaluation Rept of Dcrdr for Davis-Besse Nuclear Power Station ML20210K1291985-11-19019 November 1985 Site Survey of Davis-Besse Maint Program & Practices, Technical Ltr Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D2071985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Davis-Besse Unit 1 ML20127J5941985-06-14014 June 1985 Preimplementation Audit of Dcrdr of Davis-Besse Nuclear Power Station ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 ML20108F4441984-11-27027 November 1984 Masonry Wall Design,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20095H0631984-07-10010 July 1984 Draft Control of Heavy Loads - Phase II,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20086N2451984-02-29029 February 1984 Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability Analysis ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20077K8451983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii,Rcs Vents, (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K1501982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1, Technical Evaluation Rept ML20071L3841982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept ML20065S6051982-07-23023 July 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20069C5921982-06-23023 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20064L2821982-05-10010 May 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17) ML20027A7751982-04-30030 April 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept ML20207N4381982-04-0606 April 1982 Rev 1 to Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Environ Qualification SERs & TMI Action Plan Installed Equipment, Request for Addl Info ML20040G1591981-12-22022 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20052A0681981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint. ML19240C0021981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety Evaluation ML19208B8711979-07-30030 July 1979 Technical Evaluation Rept Re Alternative to Keylock Control to Bypass Valves.Supports Alternative Procedures ML19329C4671970-07-17017 July 1970 Review of Seismic Design Criteria for Davis-Besse. ML19329C4801969-10-31031 October 1969 Seismological & Geological Review. ML19329C4701969-10-28028 October 1969 Seismic Review. 1996-02-23
[Table view] Category:QUICK LOOK
MONTHYEARML20129D8211996-02-23023 February 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station ML20071J3931994-06-30030 June 1994 Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant ML20057E5921993-09-30030 September 1993 Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant ML20086F7071991-10-31031 October 1991 Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1 ML20058F8691990-10-31031 October 1990 PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station ML20069N4871990-08-17017 August 1990 Station Blackout Evaluation, Final Technical Evaluation Rept ML20083B5491990-07-13013 July 1990 Monthly Rept for June 1990 for FIN B-5699, ISLOCA Research Program ML20083B4731990-02-16016 February 1990 Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station, Draft Rept ML20070Q6431989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Davis-Besse ML20245E9211988-08-31031 August 1988 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Davis-Besse Unit 1 ML20238A9461987-08-31031 August 1987 DAVIS-BESSE Uncertainty Study ML20214R2061987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Davis-Besse, Final Informal Rept ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210C1661986-03-0707 March 1986 Masonry Wall Design,Davis-Besse Unit 1, Technical Evaluation Rept ML20151L3451985-12-0606 December 1985 Suppl to Technical Evaluation Rept of Dcrdr for Davis-Besse Nuclear Power Station ML20210K1291985-11-19019 November 1985 Site Survey of Davis-Besse Maint Program & Practices, Technical Ltr Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D2071985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Davis-Besse Unit 1 ML20127J5941985-06-14014 June 1985 Preimplementation Audit of Dcrdr of Davis-Besse Nuclear Power Station ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 ML20108F4441984-11-27027 November 1984 Masonry Wall Design,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20095H0631984-07-10010 July 1984 Draft Control of Heavy Loads - Phase II,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20086N2451984-02-29029 February 1984 Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability Analysis ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20077K8451983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii,Rcs Vents, (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K1501982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1, Technical Evaluation Rept ML20071L3841982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept ML20065S6051982-07-23023 July 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20069C5921982-06-23023 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20064L2821982-05-10010 May 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17) ML20027A7751982-04-30030 April 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept ML20207N4381982-04-0606 April 1982 Rev 1 to Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Environ Qualification SERs & TMI Action Plan Installed Equipment, Request for Addl Info ML20040G1591981-12-22022 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20052A0681981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint. ML19240C0021981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety Evaluation ML19208B8711979-07-30030 July 1979 Technical Evaluation Rept Re Alternative to Keylock Control to Bypass Valves.Supports Alternative Procedures ML19329C4671970-07-17017 July 1970 Review of Seismic Design Criteria for Davis-Besse. ML19329C4801969-10-31031 October 1969 Seismological & Geological Review. ML19329C4701969-10-28028 October 1969 Seismic Review. 1996-02-23
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20129D8211996-02-23023 February 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station ML20071J3931994-06-30030 June 1994 Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant ML20057E5921993-09-30030 September 1993 Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant ML20086F7071991-10-31031 October 1991 Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1 ML20058F8691990-10-31031 October 1990 PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station ML20069N4871990-08-17017 August 1990 Station Blackout Evaluation, Final Technical Evaluation Rept ML20083B5491990-07-13013 July 1990 Monthly Rept for June 1990 for FIN B-5699, ISLOCA Research Program ML20083B4731990-02-16016 February 1990 Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station, Draft Rept ML20070Q6431989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Davis-Besse ML20245E9211988-08-31031 August 1988 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Davis-Besse Unit 1 ML20238A9461987-08-31031 August 1987 DAVIS-BESSE Uncertainty Study ML20214R2061987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Davis-Besse, Final Informal Rept ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210C1661986-03-0707 March 1986 Masonry Wall Design,Davis-Besse Unit 1, Technical Evaluation Rept ML20151L3451985-12-0606 December 1985 Suppl to Technical Evaluation Rept of Dcrdr for Davis-Besse Nuclear Power Station ML20210K1291985-11-19019 November 1985 Site Survey of Davis-Besse Maint Program & Practices, Technical Ltr Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D2071985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Davis-Besse Unit 1 ML20127J5941985-06-14014 June 1985 Preimplementation Audit of Dcrdr of Davis-Besse Nuclear Power Station ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 ML20108F4441984-11-27027 November 1984 Masonry Wall Design,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20095H0631984-07-10010 July 1984 Draft Control of Heavy Loads - Phase II,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20086N2451984-02-29029 February 1984 Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability Analysis ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20077K8451983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii,Rcs Vents, (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K1501982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1, Technical Evaluation Rept ML20071L3841982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept ML20065S6051982-07-23023 July 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20069C5921982-06-23023 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20064L2821982-05-10010 May 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17) ML20027A7751982-04-30030 April 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept ML20207N4381982-04-0606 April 1982 Rev 1 to Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Environ Qualification SERs & TMI Action Plan Installed Equipment, Request for Addl Info ML20040G1591981-12-22022 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20052A0681981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint. ML19240C0021981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety Evaluation ML19208B8711979-07-30030 July 1979 Technical Evaluation Rept Re Alternative to Keylock Control to Bypass Valves.Supports Alternative Procedures ML19329C4671970-07-17017 July 1970 Review of Seismic Design Criteria for Davis-Besse. ML19329C4801969-10-31031 October 1969 Seismological & Geological Review. ML19329C4701969-10-28028 October 1969 Seismic Review. 1996-02-23
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20129D8211996-02-23023 February 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station ML20071J3931994-06-30030 June 1994 Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001, for Plant ML20057E5921993-09-30030 September 1993 Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant ML20086F7071991-10-31031 October 1991 Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1 ML20058F8691990-10-31031 October 1990 PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station ML20069N4871990-08-17017 August 1990 Station Blackout Evaluation, Final Technical Evaluation Rept ML20083B5491990-07-13013 July 1990 Monthly Rept for June 1990 for FIN B-5699, ISLOCA Research Program ML20083B4731990-02-16016 February 1990 Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station, Draft Rept ML20070Q6431989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Davis-Besse ML20245E9211988-08-31031 August 1988 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Davis-Besse Unit 1 ML20238A9461987-08-31031 August 1987 DAVIS-BESSE Uncertainty Study ML20214R2061987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Davis-Besse, Final Informal Rept ML20212Q0881986-11-30030 November 1986 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1, Informal Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210C1661986-03-0707 March 1986 Masonry Wall Design,Davis-Besse Unit 1, Technical Evaluation Rept ML20151L3451985-12-0606 December 1985 Suppl to Technical Evaluation Rept of Dcrdr for Davis-Besse Nuclear Power Station ML20210K1291985-11-19019 November 1985 Site Survey of Davis-Besse Maint Program & Practices, Technical Ltr Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20132D2071985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Davis-Besse Unit 1 ML20127J5941985-06-14014 June 1985 Preimplementation Audit of Dcrdr of Davis-Besse Nuclear Power Station ML20133P8831985-05-31031 May 1985 Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station,Unit 1 ML20108F4441984-11-27027 November 1984 Masonry Wall Design,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20106A6541984-09-24024 September 1984 Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20095H0631984-07-10010 July 1984 Draft Control of Heavy Loads - Phase II,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20086N2451984-02-29029 February 1984 Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability Analysis ML20077L7891983-08-0909 August 1983 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept ML20077K8451983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii,Rcs Vents, (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K1501982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements, Davis-Besse Nuclear Power Station,Unit 1, Technical Evaluation Rept ML20071L3841982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept ML20027C5001982-08-27027 August 1982 Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station,Unit 1, Draft Technical Evaluation Rept ML20065S6051982-07-23023 July 1982 Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20069C5921982-06-23023 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept ML20064L2821982-05-10010 May 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication (F-16,F-17) ML20027A7751982-04-30030 April 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys, Technical Evaluation Rept ML20207N4381982-04-0606 April 1982 Rev 1 to Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Environ Qualification SERs & TMI Action Plan Installed Equipment, Request for Addl Info ML20040G1591981-12-22022 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20052A0681981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint. ML19240C0021981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety Evaluation ML19208B8711979-07-30030 July 1979 Technical Evaluation Rept Re Alternative to Keylock Control to Bypass Valves.Supports Alternative Procedures ML19329C4671970-07-17017 July 1970 Review of Seismic Design Criteria for Davis-Besse. ML19329C4801969-10-31031 October 1969 Seismological & Geological Review. ML19329C4701969-10-28028 October 1969 Seismic Review. 1996-02-23
[Table view] |
Text
!
, Attachment EGG-DNSP-11373 TECHNICAL EVALUATION REPORT Evaluation of Utility Response to Supplement I to NRC Bulletin 90-01: Davis-Besse-1 Docket No. 50-346 Alan C. Udy and LeRoy C. Meyer Published June 1994 EG&G Idaho, Inc.
Idaho National Engineering Laboratory Idaho Falls, Idaho 83415 Prepared for the o U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Under DOE Contract No. DE-AC07-76ID01570 FIN No. Ll695, Task No. 11 TAC No. M85380
[4[ 2ggo$k $ o 346 PDR p '
i
SUMMARY
This report documents the EG&G Idaho, Inc., review of the Centerior Energy submittals that respond to Supplement 1 to NRC Bulletin 90-01 for the Davis-Besse Nuclear Power Station, Unit No. 1. This NRC Bulletin provides i information regarding the loss of fill-oil in certain pressure and differential pressure transmitters manufactured by Rosemount, Inc. This report identifies areas of non-conformance to the requested actions and the i reporting requirements. Exceptions to the requested actions and the reporting ,
requirements are evaluated.
i I
i l
FIN No. L1695, Task No. 11 B&R No. 320-19-15-05-0 Docket No. 50-346 TAC No. M85380 ii l l
1
i l
l l
l l
I PREFACE This report is supplied as part of the " Technical Assistance in Support of the Instrumentation and Controls Systems Branch." It is being conducted for the U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of Reactor Controls and Human Factors, by EG&G Idaho, Inc., DOE \NRC Support Programs Unit.
iii
CONTENTS
SUMMARY
.............................................................. ii PREFACE .............................................................. iii
- 1. INTRODUCTION .................................................... 1
- 2. NRC SPECIFIED REQUESTED ACTIONS ................................. 4
- 3. EVALUATION ...................................................... 7 3.1 Evaluation of Licensee Response to Reporting Requirements . 7 3.2 Evaluation of Licensee Response to Requested Actions ...... 8
- 4. CONCLUSIONS ..................................................... 12
- 5. REFERENCES ...................................................... 13 iv
Evaluation of Utility Response to Sucolement 1 tq NRC Bulletin 90-01: Davis-Besse-1
- 1. INTRODUCTION The NRC issued Bulletin 90-01 on March 9, 1990 (Reference 1). That Bulletin discussed certain Rosemount pressure and differential pressure transmitter models identified by the manufacturer as prone to fill-oil leakage. The bulletin requested licensees to identify whether these transmitters were or may later be installed in safety-related systems.
Actions were detailed for licensee implementation for identified transmitters installed in a safety-related system. These same actions apply to identified transmitters presently held in inventory for later installation i . a safety-related system.
With the gradual leakage of fill-oil, the transmitter would not have the long term accuracy, time response, and reliability needed for its intended safety function. Further, this condition could go undetected over a long period. Redundant instrument channels are subject to the same degradation mechanism. This increases the potential for a common mode failure. Thus, this potential failure mechanism raised concern for the reliability of reactor protection systems (RPS), engineered safety features (ESF) actuation systems, and anticipated transient without scram (ATWS) mitigating systems. To achieve high functional reliability, there must be a low probability of component failure while operating, with any failures readily detectable.
Supplement 1 to NRC Bulletin 90-01 (Reference 2) was issued on December 22, 1992. The Supplement inf m -1 licensees of NRC staff activities regarding the subject transmitters, nc oc.bsd continuing reports of transmitter failures. The NRC requested licensee action to resolve the issue.
The Supplement also updated the information contained in the original bulletin. The licensee was requested to review the information and determine if it was applicable at their facility. Further, the licensee was requested j to modify their actions and enhanced surveillance monitoring programs to conform with the direction given. Finally, the licensee was instructed to l 1
l l
.-__-_-____J
respond to the NRC. The Reauested Actions in Supplement I to NRC Bulletin 90-01 supersede the original NRC Bulletin 90-01 Reauested Actions.
In responding to Supplement I to NRC Bulletin 90-01, the licensee is directed to address three items.
- 1. A statement either committing the licensee to take the NRC Bulletin 90-01, Supplement 1, Reauested Actions or taking ,
exception to those actions.
- 2. Addressing the actions committed to in the above statement, provide:
- a. a list of the specific actions, including any justifications, to be taken to complete the commitment,
- b. a schedule for completion, and
- c. after completion, a statement that confirms the actions committed are complete.
- 3. A statement identifying the NRC Bulletin 90-01, Supplement 1, Reauested Actions not taken, along with an evaluation providing the basis for exemption.
In implementing the replacement option of the NRC Reauested Actions, plant shutdown exclusively for replacing the transmitters is not required. ,
This allowance infers that replacements can be scheduled. With replacement in a timely manner, enhanced surveillance monitoring for interim operation is not required.
Centerior Energy, the licensee for the Davis-Besse Nuclear Power Station, Unit No.1, responded to Supplement 1 of NRC Bulletin 90-01 with a letter dated March 5, 1993 (Reference 3). The licensee augmented that information with an additional submittal dated April 29, 1994 (Reference 4).
This technical evaluation report evaluates the completeness of these 2
subm 'tt al; . It also determines whether proposed surveillance methods are adequatc to determine fill-oil loss-caused degradation of the transmitter. i Finally, this report addresses the interval of surveillance proposed by the licensee for any transmitters included in the enhanced surveillance program.
Many Rosemount transmitter failures have been attributed to the use of j stainless steel "0"-rings between the sensing module and the process flanges. ;
Rosemount improved the manufacturing process for transmitters manufactured after July 11, 1989. Those improvements included a limit of the torque -
applied to the flange bolts. This limits the stress caused in the sensing module by the "0"-ring. post-production screening, including pressure testing .
of the sensing module for this potential latent defect, was also implemented l at that time. Therefore, as described in Supplement 1 of NRC Bulletin 90-01, f those Rosemount transmitters manufactured after July 11, 1989, are not subject to this review.
I i
I i
r i
3 ,
e
.se 4, . . . . .< .. * - - =-
~ . _ . - - .. -- --
4
- 2. NRC SPECIFIED REQUESTED ACTIONS The NRC staff specified the following Reauested Actions of licensees of operating reactors.
t
- 1. Review plant records and identify the following Rosemount transmitters (if manufactured before July 11,1989) that either are used in or may be ,
used in either safety-related or ATWS mitigating systems.
l
- Rosemount Model 1153, Series B ;
- Rosemount Model 1153, Series D !
- Rosemount Model 1154 Following identification, the licensee is to establish the following: ;
- a. For those identified transmitters having a normal operating ,
pressure greater than 1500 psi, and are installed as part of reactor protection trip systems, ESF actuation systems, or ATWS mitigating systems, either replace the transmitter in an expedited manner, or monitor monthly, for the life of the transmitter, using an enhanced surveillance program. .
If the identified transmitter exceeds the 60,000 psi-month or the 130,000 psi-month criterion (depending on the range code of the transmitter) established by Rosemount, enhanced surveillance on a refueling (not exceeding 24 months) basis is acceptable. Under -
this option, justification must be based on the service record and the specific safety function of the transmitter. That '
justification can be based on high functional reliability provided by redundancy or diversity.
- b. For those identified transmitters having a normal operating pressure greater than 1500 psi, and are installed as part of a '
safety-related system other than reactor protection trip systems, :
ESF actuation, or ATWS mitigating systems, either replace the ,
transmitter or monitor quarterly, for the life of the transmitter, '
using an enhanced surveillance program.
If the identified transmitter exceeds the 60,000 psi-month or the 130,000 psi-month criterion (depending on the range code of the i transmitter) established by Rosemount, enhanced surveillance on a refueling (not exceeding 24 months) basis is acceptable. Under this option, justification must be based on the service record and the specific safety function of the transmitter. That 4
b 4
i i
l
- justification can be based on high functional reliability provided by redundancy or diversity.
i
- c. For boiling water reactors (BWR)-- !
I For those identified transmitters having a normal operating '
pressure greater than 500 psi and less than or equal to l 1500 psi, and are installed as part of reactor protection trip systems, ESF actuation systems, or ATWS mitigating systems, either replace the transmitter, or monitor monthly with an enhanced surveillance monitoring program, until the transmitter reaches the designated (by Rosemount) psi-month criterion (60,000 psi-month or 130,000 psi-month, depending on the transmit'.er range code).
For transmitters that provide signals to the RPS or ATWS trips for high pressure or low water level, the enhanced surveillance must be monthly. For other transmitters in this classification, enhanced surveillance on a refueling .
(not exceeding 24 months) basis is acceptable. Under this ,
option, justification must be based on the service record and the specific safety function of the transmitter. That justification can be based on high functional reliability provided by redundancy or diversity.
For pressurized water reactors (PWR)-- (
. For those identified transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and are installed as part of reactor protection ,
trip systems, ESF actuation systems, or ATWS mitigating systems, either replace the transmitter, or monitor with an enhanced surveillance monitoring program, until the transmitter reaches the designated (by Rosemount) psi-month ,
criterion (60,000 psi-month or 130,000 psi-month, depending on the transmitter range code) on a refueling (not exceeding -
24 months) basis.
i
- d. For those identified transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, !
and are installed as part of a safety-related system other than reactor protection trip systems, ESF actuation, or ATWS mitigating i systems, either replace the transmitter or monitor with an r enhanced surveillance monitoring program, until the transmitter .
reaches the designated (by Rosemount) psi-month criterion (60,000 l psi-month or 130,000 psi-month, depending on the transmitter range !
code) on a refueling (not exceeding 24 months) basis.
5 I
l l
. J
- e. Those transmitters having a normal operating pressure greater than i 500 psi and less than or equal to 1500 psi, and have accumulated sufficient psi-month operating history to exceed the criterion established by Rosemount, may be excluded from the enhanced i surveillance monitoring program at the discretion of the licensee. I However, the licensee should retain a high level of confidence that a high level of reliability is maintained and that i transmitter failure due to loss of fill-oil is detectable.
- f. Those transmitters having a normal operating pressure less than or equal to 500 psi may be excluded from the enhanced surveillance '
monitoring program at the discretion of the licensee. However, the licensee should retain a high level of confidence that a high level of reliability is maintained and that transmitter failure due to loss of fill-oil is detectable.
- 2. Evaluate the enhanced surveillance monitoring program. The evaluation is to ensure the measurement data has an accuracy commensurate with the accuracy needed to compare the data to the manufacturers drift data criteria. It is this comparison that determines the degradation threshold for loss of fill-oil failures of the subject transmitters.
The Supplement also states the NRC may conduct audits or inspections in the future to verify compliance with the established requirements.
6
l
- 3. EVALUATION The licensee provided a response to Supplement 1 of NRC Bulletin 90 01 .
on March 5, 1993. Supplemental information was provided by the licensee on ,
April 29, 1994. Those responses were compared to the Bulletin Reoortina Reauirements and Reauested Actions as described below. The licensee reports they have 37 Rosemount transmitters that are subject to the an.'uested Actions of the Supplement. The licensee also reports nine of the subject transmitters ;
are classified safety-related for pressure boundary integrity purposes only. ,
These nine transmitters are excluded from further review. The purpose of NRC Bulletin 90-01 is to identify and repair, before the safety function of the transmitter is compromised, those Rosemoor; transmitters where the safety-
- related signal deteriorates due to the loss of the transmitter fill-oil. .
Therefore, the exclusion of those nine transmitters (that do not provide a safety-related signal) from review for the Reauested Actions of the Supplement is appropriate. Thus, there are 28 Rosemount transmitters in the scope of this review. ;
3.1 Evaluation of Licensee Response to Reportina Reauirements ;
In Reference 3, the licensee committed to complete their actions that respond to the Supplement by the end of refueling outage BRF0. In Reference ;
4, the licensee states they have completed the actions required to meet the !
Reauested 'Actioni detailed in Supplement 1 of NRC Bulletin 90-01. Included with that statement is clarification, interpretation, and the limits placed on that commitment. The licensee described the specific actions taken to ;
implement the Reauested Actions.
i The licensee submittals conform with the Reportina Reauirements of Supplement 1 of NRC Bulletin 90-01.
7 I
1 i
- . . - . , - - , - , . . . - . . - -. ._ . - - , , . - . - .----,.,,y. - -
3.2 Evaluation of Licensee Response to Reouested Actions Supplement 1 of NRC Bulletin 90-01 requestod licensee action to resolve the issue of fill-oil leakage in Rosemount transmitters. In this Technical Evaluation Report, the Reauested Actions and associated transmitter criteria are summarized in Section 2 of this report. The licensee identified a total of 28 transmitters that are in the scope of this review. The licensee response is discussed in the following sections.
3.2.1 Licensee Response to Reauested Action 1.a The licensee states there are two Rosemount transmitters from this classification at Unit No.1 of the Davis-Besse Nuclear Power Station.
Transmitter PT6365A was scheduled for replacement during the (then current) refueling outage, 8RF0. The transmitter had already exceeded the psi-month maturity threshold criterion established by Rosemount and endorsed by the NRC.
That transmitter and a redundant transmitter, PT63658, measure the reactor coolant system loop pressure. Signals are distributed to the diverse scram (ATWS mitigation) system, the remote shutdown panel, and the post-accident monitoring indication. After replacement, PT6365A will be outside the scope of the enhanced surveillance monitoring program. The licensee informed the NRC, in Reference 4, that the replacement of transmitter PT6365A had been completed.
The redundant transmittt PT63658, will not be replaced. It will participate in the enhanced surveillance monitoring program. Calibration data will be obtained every refueling cycle. That calibration data will be trended, and compared to the zero and span drift limits that show a potential loss of fill-oil. Additionally, the plant computer will compare the signals from the redundant transmitters (PT6365A and PT6365B) weekly. Divergence between the two signals shows a potential loss of fill-oil. PT6365B has exceeded the psi-month maturity threshold criterion. The enhanced surveillance monitoring program for this transmitter is acceptable.
8
3.2.2 Licensee Resoonse to Reauested Action 1.b The licensee states there are five safety-related Rosemount transmitters !
from this classification at Unit No.1 of the Davis-Besse Nuclear Power Station. Transmitter LT5448A monitors the level in a hot leg. It has not l exceeded the psi-month maturity threshold criterion established for it. The licensee will include this transmitter in the enhanced surveillance monitoring l program. The plant computer will compare the signals from redundant transmitters RT5448A and LT54488) weekly. Divergence between the two shows a potential loss of fill-oil. LT5448B has exceeded the psi-month maturity threshold criterion. Additionally, calibration drift data will be trended !
> every refueling cycle.
l I
The four other transmitters in this classification have accumulated sufficient operational history to exceed the psi-month maturity threshold I criterion. These transmitters will participate in the enhanced surveillance monitoring program. Calibration drift data will be trended every refueling cycle. 1 1
s
- Transmitter LT54488 is redundant to LT5448A and monitors the hot leg level. It has shown no indication of loss of fill-oil since the enhanced surveillance monitoring program was established'in response to NRC Bulletin 90-01.
- Transmitters LTRC14-1 and LTRC14-3 are redundant transmitters, '
monitoring the pressurizer level. The signals provide indication, alarms, and interlocks. One signal provides level control for the normal makeup line flow control valve MU-32. Either transmitter i can be selected for the control function should the other fail.
- Transmitter FTHU31 monitors the wide-range makeup flow. It has no redundant transmitter. However, the same flow element is used with a narrow-range transmitter, FTMU34. The licensee states the ;
makeup system will not be adversely affected should FTMU31 fail.
The enhanced surveillante monitoring program for these transmitters is acceptable, i
9 9
4 l
1
, -. -. -. - - - - _-~
3.2.3 Licensee Response to Reauested Action 1.q The licensee states there are no Rosemount transmitters from this classification at Unit No.1 of the Davis-Besse Nuclear Power Station.
3.2.4 Licensee Response to Reauested Action 1.d The licensee states there are six Rosemount transmitters from this classification at Unit No. I of the Davis-Besse Nuclear Power Station. ;
Transmitters LTSP9A3, LTSP9A4, LTSP9B3, and LTSP984 will exceed the 60,000 psi-month maturity threshold criterion in October 1993. At that point they will be removed from the enhanced surveillance monitoring program. ;
Transmitters LTSP09A2 and LTSP09A5 already exceed the 60,000 psi-month maturity threshold criterion, and are no longer included in an enhanced ,
surveillance monitoring program. See Section 3.2.5. l I
t 3.2.5 Licensee Response to Reauested Action 1.e The licensee states there are no Rosemount transmitters from this classification at Unit No.1 of the Davis-Besse Nuclear Power Station. -
However, the licensee has six Rosemount transmitters that meet the classification requirements for Reauested Action 1.d., and either exceed or will soon exceed the psi-month maturity threshold criterion. At the discretion of the licensee, these six transmitters will be excluded from the enhanced surveillance monitoring program a,fter the maturity threshold is reached. This is permitted by the Supplement. [
The Supplement requires the licensee maintain a high degree of '
confidence that these transmitters remain highly reliable. The licensee ,
states these transmitters will contin'le with a weekly computer point trend analysis to maintain that confidence.
10 i
\
3.2.6 Licensee Response to Reauested Action 1.f The licensee states there are 15 Rosemount transmitters from this classification at Unit No.1 of the Davis-Besse Nuclear Power Station. The Supplement requires the licensee maintain a high degree of confidence that these transmitters remain highly reliable. The licensee states these transmitters will continue with a weekly computer point trend analysis (comparing redundant channels to each other) to maintain that confidence.
3.2.7 Enhanced Surveillance Monitorina proaram The licensee states that calibration data has sufficient accuracy to compare to the zero and span drift limits identified in Rosemount Technical Bulletin No. 4. Another part of the enhanced surveillance monitoring program is to trend computer point data of redundant transmitters weekly. Statistical data such as variance and deviation from the average will be used periodically to identify symptoms of the loss of fill-oil.
r l )
l l
11 i
J
- 4. CONCLUSIONS Based on our review, we find that the licensee has completed the reporting requirements of Supplement 1 of NRC Bulletin 90-01. Further, the licensee either conforms to or has adequate justification for deviating from the requested actions of Supplement I to NRC Bulletin 90-01.
l 1
l l
12 l l
l 1
- 5. REFERENCES
- 1. NRC Bulletin No. 90 01: " Loss of Fill-oil in Transmitters Manufactured by Rosemount," March 9, 1990, OMB No. 3150-0011.
- 2. NRC Bulletin No. 90-01, Supplement 1: " Loss of Fill-oil in Transmitters !
Manufactured by Rosemount," December 22, 1992, OMB No. 3159-0011.
- 3. Letter, Centerior Energy (D. C. Shelton) to NRC, " Response to NRC Bulletin 90-01, Supplement 1, ' Loss of Fill-Oil in Transmitters Manufactured by Rosemount'," March 5,1993, Serial Number 1-1005. I
- 4. Letter, Centerior Energy (D. C. Shelton) to NRC, " Supplemental Response l to NRC Bulletin Number 90-01, Supplement 1, ' Loss of Fill-oil in i Transmitters Manufactured by Rosemount'," April 29, 1994. l
.l
)
l i
i i
I 1
1 I
l 13
, . - . . - - _ - - -.