(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Memoranda
MONTHYEARML24008A0802024-01-0808 January 2024 Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting ML23318A5162023-11-30030 November 2023 Implementation of Provisions from Consultations Under Section 106 of the National Historic Preservation Act on the Kairos Hermes Test Reactor CP Review ML23220A1992023-09-0707 September 2023 Consideration of New Information Regarding Potential Cumulative Impacts from the Proposed Kairos Hermes 2 Test Reactor on the Kairos Hermes Construction Permit Review ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report ML23156A6682023-06-0606 June 2023 Summary of February 9, 2022, Public Meeting on the Kairos Herme Preliminary Safety Analysis Report ML23117A0052023-05-0101 May 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 3, Design of Structures, Systems and Components ML23117A0502023-04-29029 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 12, Conduct of Operations ML23117A0272023-04-28028 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 10, Experimental Facilities and Utilization ML23117A0032023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 2, Site Characteristics ML23117A0172023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 8, Electric Power Systems ML23117A0022023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 1, the Facility ML23117A0082023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 4, Reactor Description ML23117A0102023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 5, Heat Transport Systems ML23117A0112023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 6, Engineered Safety Features ML23117A0192023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 9, Auxiliary Systems ML23117A0302023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 11, Radiation Protection and Waste Management ML23117A0522023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 13, Accident Analysis ML23117A0612023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 14, Technical Specifications ML23117A0652023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 16, Other License Considerations ML23117A0692023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 17, Decommissioning and Possession-Only License Amendments ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML22196A3882022-08-24024 August 2022 Memorandum from T.Dozier to K.Erwin - Summary Report for Environmental Audit of the Kairos Hermes Test Reactor Construction Permit Application ML22193A2402022-08-0101 August 2022 Issuance of Environmental Scoping Summary Report for the Review of the Kairos Hermes Test Reactor Construction Permit Application ML22169A0092022-04-12012 April 2022 NPS Scoping Comments on Kairos Test Reactor ML20092J1952020-04-0707 April 2020 Summary of February 19, 2020, Public Meeting to Discuss Kairos Power Llc'S Quality Assurance Topical Report ML19336A5682019-12-0909 December 2019 Audit Plan for the Regulatory Audit of Kairos Power, LLC Topical Report KP-TR-006, Scaling Methodology for the Kairos Power Testing Program, Revision 0 2024-01-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555 - 0001 April 27, 2023 MEMORANDUM TO: David Petti, Lead Kairos Hermes License Application Review Subcommittee Advisory Committee on Reactor Safeguards FROM: Greg Halnon, Member Advisory Committee on Reactor Safeguards
SUBJECT:
INPUT FOR ACRS REVIEW OF THE KAIROS CONSTRUCTION PERMIT APPLICATION - DRAFT SAFETY EVALUATION FOR CHAPTER 16, OTHER LICENSE CONSIDERATIONS In response to the Subcommittees request, I have reviewed the NRC staffs safety evaluation (SE) with no open items for Chapter 16, Other License Considerations. The following is my recommended course of action concerning further review of this chapter and the staffs associated SE.
Background
This chapter captures license considerations that are unique to this technology that do not belong elsewhere in the preliminary safety analysis report (PSAR). This includes how reactor components may have been used in the past and any use of the nuclear process for medical purposes.
SE Summary Chapter 16 of the applicants PSAR was found to be of sufficient detail to provide confidence that the other license considerations will not be applicable to the Hermes reactor. The staff concluded there is no need for further review since the applicant stated all the material used in the construction and operation of the reactor plant and support systems will be new components (i.e., never used before) and there will be no medical use of the reactor plant associated with the direct medical administration of radioisotopes or other radiation-based therapies.
Discussion I have no concerns with either the applicants description or the staffs conclusion. No further review is necessary unless the considerations are changed by the applicant.
Recommendation(s)
I recommend no further action.
D. Petti References
- 1. USNRC, Draft Safety Evaluation for Hermes NonPower Reactor Preliminary Safety Analysis Report Chapter 16, January 2023 (ML23017A120)
- 2. Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2, February 2023 (ML23055A672)
- 3. USNRC, NUREG-1537, Part 1, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, Format and Content, issued February 1996 (ML042430055)
- 4. USNRC, NUREG-1537, Part 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, Standard Review Plan and Acceptance Criteria, issued February 1996 (ML042430048)
D. Petti April 27, 2023
SUBJECT:
INPUT FOR ACRS REVIEW OF THE KAIROS CONSTRUCTION PERMIT APPLICATION - DRAFT SAFETY EVALUATION FOR CHAPTER 16, OTHER LICENSE CONSIDERATIONS Package No: ML23117A000 Memo Accession No: ML23117A065 Publicly Available Y Sensitive N Viewing Rights: NRC Users or ACRS Only or See Restricted distribution *via e-mail OFFICE ACRS/TSB* SUNSI Review* ACRS/TSB* ACRS*
NAME WWang WWang LBurkhart (WWang for) GHalnon DATE 4/27/2023 4/27/2023 4/27/2023 4/27/2023 OFFICIAL RECORD COPY