(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22153A4682022-01-28028 January 2022 ES-301-4 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A3022021-04-13013 April 2021 Administered RO Admin JPM ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2402021-04-13013 April 2021 LTR 75 Day Submittal ML21144A2372021-04-13013 April 2021 ES-301-4 ML21144A2442021-04-13013 April 2021 ES-401-6 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21145A0402021-04-13013 April 2021 ES-301-5 ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3022021-04-13013 April 2021 Administered RO Admin JPM ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A2642021-04-13013 April 2021 Sim JPM ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21144A3182021-04-13013 April 2021 ES-301-1 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline 2024-06-27
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Form ES-201-2 NOTE: This ES-201-2 is for the NRC developed Written Examination Outline sent to the Facility ONLY Facility: Clinton Power Station Date of Examination: January 18 - 28, 2022 Initials Item Task Description a b* c#
- 1. a. Verify that the outline(s) fit(s) the appropriate model in accordance with ES-401 or ES-401N. BLB N/A dwr W b. Assess whether the outline was systematically and randomly prepared in accordance with N/A dwr BLB R Section D.1 of ES-401 or ES-401N and whether all K/A categories are appropriately sampled.
I T c. Assess whether the outline overemphasizes any systems, evolutions, or generic topics. BLB N/A dwr T
E N
- d. Assess whether the justifications for deselected or rejected K/A statements are appropriate. BLB N/A dwr
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major S transients.
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number and U mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using at A least one new or significantly modified scenario, that no scenarios are duplicated from the T applicants audit test(s), and that scenarios will not be repeated on subsequent days.
O
- c. To the extent possible, assess whether the outline(s) conforms with the qualitative and R
quantitative criteria specified on Form ES-301-4 and described in Appendix D and in Section D.5, Specific Instructions for the Simulator Operating Test, of ES-301 (including overlap).
- 3. a. Verify that the systems walkthrough outline meets the criteria specified on Form ES-301-2:
(1) The outline(s) contains the required number of control room and in-plant tasks distributed W among the safety functions as specified on the form.
A (2) Task repetition from the last two NRC examinations is within the limits specified on the form.
L (3) No tasks are duplicated from the applicants audit test(s).
K (4) The number of new or modified tasks meets or exceeds the minimums specified on the form.
T (5) The number of alternate-path, low-power, emergency, and radiologically controlled area H tasks meets the criteria on the form.
R O b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
U (1) The tasks are distributed among the topics as specified on the form.
G (2) At least one task is new or significantly modified.
H (3) No more than one task is repeated from the last two NRC licensing examinations.
- c. Determine whether there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- 4. a. Assess whether plant-specific priorities (including probabilistic risk assessment and individual plant examination insights) are covered in the appropriate exam sections.
G E b. Assess whether the 10 CFR 55.41, 55.43, and 55.45 sampling is appropriate.
N
- c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
E R d. Check for duplication and overlap among exam sections and the last two NRC exams.
A L e. Check the entire exam for balance of coverage.
- f. Assess whether the exam fits the appropriate job level (RO or SRO).
Printed Name/Signature Date
- a. Author Bruce L. Bartlett /
- b. Facility Reviewer (*) N/A N/A David W. Reeser / David W Reeser Digitally signed by David W Reeser Date: 2021.06.17 09:38:06 -05'00' 6/7/21 Bruce L. Bartlett /
- c. NRC Chief Examiner (#) Chief Under Instruction 6/14/21
- d. NRC Supervisor Patricia J. Pelke / Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2021.06.16 16:39:38 -05'00'
- Not applicable for NRC-prepared examination outlines.
- The independent NRC reviewer initials items in column c; the chief examiners concurrence is required.