|
---|
Category:License-Operator
MONTHYEARIR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20282A5172020-07-29029 July 2020 ST-2020-07 Post Exam Comments Analysis ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20301A3912020-07-29029 July 2020 ST-2020-07 Public Forms ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test 2024-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 ML24278A1602024-09-23023 September 2024 12 STP-2024-09 Public Forms ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23242A0522023-08-0909 August 2023 07-Post Exam Comments ML23254A2012023-08-0909 August 2023 07-Public Forms ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 ML22293A8202022-10-24024 October 2022 Notification of NRC Initial Operator Licensing Examination 05000498 2023301 05000499 2023301 ML22250A4462022-09-0808 September 2022 Initial Exam 2022-08 Draft Outline Comments ML22250A4442022-09-0808 September 2022 Initial Exam 2022-08 Final Operating Test ML22276A2632022-09-0808 September 2022 Initial Exam 2022-08 Post Exam Comments ML22250A4452022-09-0808 September 2022 Initial Exam 2022-08 Draft Outlines ML22250A4512022-09-0808 September 2022 Initial Exam 2022-08 Final Outlines ML22250A4492022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam ML22276A2432022-09-0808 September 2022 Initial Exam 2022-08 Final Written Exam ML22250A4502022-09-0808 September 2022 Initial Exam 2022-08 Draft Written Exam Comments ML22250A4482022-09-0808 September 2022 Initial Exam 2022-08 Draft Operating Test Comments ML22353A5812022-09-0808 September 2022 Initial Exam 2022-08 Public Documents ML22250A4472022-08-22022 August 2022 Initial Exam 2022-08 Draft Operating Test ML22139A2482022-05-19019 May 2022 Operator Licensing Examination Schedule Revision 1 ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21306A2682021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 ML21246A1292021-07-29029 July 2021 8-STP-2021-07 Final Written Exam ML21334A2592021-07-29029 July 2021 10_1-STP-2021-07 Post Exam Comments Cover Letter ML21265A5122021-07-29029 July 2021 11-STP-2021-07 Public Forms ML21265A5102021-07-29029 July 2021 6-STP-2021-07 Draft Operating Test Comments ML21265A5112021-07-29029 July 2021 7-STP-2021-07 Final Outlines ML21265A5062021-07-29029 July 2021 2-STP-2021-07 Draft Outline Comments ML21246A1302021-07-29029 July 2021 9-STP-2021-07 Final Operating Test ML21265A5052021-07-29029 July 2021 1-STP-2021-07 Es 301-2 Draft Outlines (Combined 4-15-21) ML21265A5072021-07-29029 July 2021 3-STP-2021-07 Draft Written Exam ML21265A5082021-07-29029 July 2021 4-STP 2021-07 ES-401-9 Draft Written Exam Comments ML21265A5092021-07-29029 July 2021 5-STP-2021-07 Draft Operating Test ML21246A1392021-07-29029 July 2021 10_STP-2021-07 Post Exam Comments NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule ML21111A1952021-04-21021 April 2021 Operator Licensing Examination Schedule ML20255A2252020-09-11011 September 2020 Notification of NRC Initial Operator Licensing Examination 05000498/2020301; 05000499/2020301 ML23103A0642020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5342020-07-29029 July 2020 ST-2020-07 Final Op Test ML20282A5332020-07-29029 July 2020 ST-2020-07 Final Written Exams ML20282A7852020-07-29029 July 2020 ST-2020-07 Draft Outlines ML20282A7842020-07-29029 July 2020 ST-2020-07 Draft Op Test ML20282A7862020-07-29029 July 2020 ST-2020-07 Draft Written Exam ML20301A3862020-07-29029 July 2020 ST-2020-07 Draft Written Exam Comments ML20301A3842020-07-29029 July 2020 ST 2020-07 Draft Op Test Comments ML20301A3852020-07-29029 July 2020 ST-2020-07 Draft Outline Comments ML20282A7872020-07-29029 July 2020 ST-2020-07 Final Outlines 2024-09-23
[Table view] |
Text
POST-EXAM QUESTION CHALLENGES BY STP LOT 25 NRC WRITTEN EXAM 07/29/2021 STPNOC personnel are not challenging any questions for the LOT 25 NRC Written Exam.
Page 1 of 1
LOT 25 NRC EXAM ANALYSIS - 07/29/2021 Bank # RO# SRO# ANSWER A B C D Total Missed 2999 1 A 0 3000 2 A 1 1 3001 3 B 1 3 4 3029 4 C 3 3 3002 5 D 2 2 3030 6 C 0 3031 7 B 4 4 3082 8 D 0 3032 9 A 2 1 3 3003 10 C 1 1 2 3033 11 C 3 3 3004 12 C 0 3034 13 B 0 3035 14 C 0 3036 15 A 1 1 3005 16 C 1 2 3 3037 17 D 0 3099 18 B 0 3038 19 C 1 1 3039 20 B 2 2 3040 21 B 0 3116 22 B 1 1 3042 23 B 1 1 3075 24 D 2 2 4 3043 25 A 3 3 3092 26 C 2 2 3044 27 D 0 3045 28 B 3 3 3046 29 D 0 3047 30 C 4 1 5 3048 31 A 6 1 7 3049 32 A 1 1 3050 33 B 1 1 3051 34 D 3 4 7 3006 35 C 0 3007 36 C 3 1 4 3083 37 B 1 1 3096 38 A 0 3052 39 A 5 5 3076 40 D 3 3 3077 41 B 1 1 2 3008 42 C 1 1 Page 1 of 3
LOT 25 NRC EXAM ANALYSIS - 07/29/2021 Bank # RO# SRO# ANSWER A B C D Total Missed 3009 43 A 0 3010 44 C 0 3011 45 A 0 3012 46 B 2 2 3013 47 A 2 1 3 3014 48 D 0 3078 49 A 0 3015 50 C 3 3 3016 51 B 0 3017 52 D 1 1 2 3018 53 D 0 3053 54 B 0 3054 55 A 0 3055 56 C 4 8 12 (75%)
3056 57 D 6 6 3019 58 D 1 1 3079 59 C 1 1 3020 60 A 0 3021 61 C 4 4 3022 62 A 0 3057 63 B 5 5 3080 64 C 1 1 2 3058 65 B 0 3023 66 A 2 2 3059 67 B 0 2883 68 B 0 3061 69 D 4 4 3024 70 B 4 3 7 3062 71 B 1 1 3093 72 C 0 3063 73 B 1 1 3064 74 B 1 1 3065 75 C 1 1 3094 76 A 0 3066 77 D 1 1 3097 78 A 0 3084 79 B 2 2 3025 80 A 2 2 3098 81 A 3 3 3115 82 B 1 1 2 4 3088 83 B 1 2 3 3089 84 D 0 3067 85 C 1 1 3068 86 B 0 Page 2 of 3
LOT 25 NRC EXAM ANALYSIS - 07/29/2021 Bank # RO# SRO# ANSWER A B C D Total Missed 3069 87 A 0 3070 88 D 3 3 3081 89 C 0 3071 90 C 1 1 3026 91 B 2 2 3027 92 C 0 3100 93 B 3 3 3090 94 A 1 1 3095 95 C 0 3072 96 C 2 2 3073 97 D 1 1 2 3074 98 C 1 1 3028 99 A 0 3091 100 A 1 1 2 RO #56 - 4 candidates chose distracter B." 8 candidates chose distracter "D." Correct answer is "C."
This question required the student to know the reason for a ROD CONT URGENT ALARM while recovering a dropped Control Bank C Rod. The procedure in progress would be 0POP04-RS-0001. The question stem stated that crew is recovering a dropped rod. With this information, the crew would be in Addendum 1, Recovery of a Dropped Rod. The Note before Step 22 of Addendum 1, warns the student that a ROD CONT URGENT ALARM will occur during the performance of Step 22. Step 22 requires the crew to open all lift coil disconnect switches in the affected bank except for the dropped rod. After that, rod withdrawal is commenced. Since the stem stated that the ROD CONT URGENT ALARM is alarming, the reason for alarming must be correct per plant design. Regardless of where the alarm sounds in the procedure, the question stated the alarm was sounding already. Since the alarm does not normally sound unless lift coil disconnect switches are opened, then the question is correct as written. No changes to the exam are warranted. The Lesson Plan, LOT 201.18 Student Handout Page 33, adequately covers knowledge of the Rod Control Urgent Alarm.
Page 3 of 3