Title | Part 21 Initial Report - Deviation Identified in Bolting Utilized to Maintain Seismic Qualification: |
Event Description | Pursuant to 10 CFR 21.21 (d)(3)(i), Paragon Energy Solutions is providing initial notification of the identification of a deviation.
Condition that requires evaluation: NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by Nuclear Logistics under PO: NU-02SR726683 in 2010. The original seismic qualification was questioned by plant personnel related to the size of the bolting utilized for the diagonal cross braces on the two lower chiller frames. Paragon performed a review and additional analysis of the original qualification report. It was confirmed that the bolting which was utilized to install the pinned diagonal braces on the condenser and compressor frame sections does not have a sufficient load bearing capacity to support the application loading during a seismic event. The upset and emergency loading for the diagonal brace is 5.59 kip and 8.59 kip, respectively. Compared to the load capacity of 2.32 kip and 3.09 kip for upset and emergency, respectively, for the 3/8" bolt in single-shear configuration with threads included in the shear plane. This condition does not affect normal operation of the chiller. However, this deviation has the potential to impact the ability to maintain structural integrity during a seismic event. Date of Discovery: 6/8/2021 Formal notification will be submitted on or before 7/8/2021. Paragon contact: Tracy Bolt, Chief Nuclear Officer, Paragon Energy Solutions, 817-284-0077, tbolt@paragones.com. This equipment was supplied to V.C. Summer Nuclear Station.
The following information was recevied via E-mail: Pursuant to 10 CFR 21.21(b), Paragon Energy Solutions, LLC is providing written notification of the identification of a deviation. On 6/24/2021, Paragon has determined that we do not have the capability to perform the evaluation to determine if the deviation, if left uncorrected, could create a substantial safety hazard. VC Summer has been notified within five working days of this determination so that they can evaluate the deviation or failure to comply, pursuant to 10 CFR 21.21(a). Condition that requires evaluation: NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by NLI to VC Summer station under PO: NU-02SR726683 in 2010. Ref. P21-06102021-IN, Rev. 0 (ML21174A009) Name and address of the individual or individuals informing the Commission: Tracy Bolt, Chief Nuclear Officer. Paragon Energy Solutions, LLC, 7410 Pebble Drive, Ft. Worth, TX 76118. Notified R2DO (Miller), R4DO (Werner), and the Part 21/50.55 Reactors E-mail group. |
Where | |
---|---|
Paragon Energy Solutions Ft. Worth, Texas (NRC Region 4) | |
Organization: | Paragon Energy Solutions |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+58.93 h2.455 days <br />0.351 weeks <br />0.0807 months <br />) | |
Opened: | Tracy Bolt 15:56 Jun 10, 2021 |
NRC Officer: | Donald Norwood |
Last Updated: | Jun 28, 2021 |
55300 - NRC Website | |
Paragon Energy Solutions with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 571432024-05-09T04:00:0009 May 2024 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect with Emergency Diesel Generator Voltage Regulator ENS 568992023-12-18T06:00:00018 December 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Initial Part 21 Report - Deficient Fuel Injectors ENS 566532023-08-03T00:00:0003 August 2023 00:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect, 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Initial Part 21 Report - Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors ENS 563872023-01-29T06:00:00029 January 2023 06:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Defect Identified in Automatic Transfer Switch ENS 554972021-09-03T05:00:0003 September 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Deviation in DC-DC Converter Rectifiers in Inverter Assemblies ENS 553002021-06-08T05:00:0008 June 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Initial Report - Deviation Identified in Bolting Utilized to Maintain Seismic Qualification: ENS 552232021-03-29T05:00:00029 March 2021 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Failure of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ENS 547342020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failure of Size 1 and 2 Freedom Series Auxiliary Contacts ENS 547602020-06-01T05:00:0001 June 2020 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect 2024-05-09T04:00:00 | |