ML20215A499

From kanterella
Revision as of 19:12, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License DPR-30,revising Tech Specs to Add MAPLHGR Limits to Reload Fuel & Adjustment of Min Critical Power Ratio Limit to Reflect Results of Cycle 9 Transient Analyses.Fee Paid
ML20215A499
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 09/18/1986
From: Wojnarowski J
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20215A501 List:
References
2072K, NUDOCS 8610060096
Download: ML20215A499 (2)


Text

i

, vy ,

s Commonwealth Edison )

A_J 72 West Adams Street, Chicego, lilinois Address Riply to: Post Office B~6776T ,

v- Chicago, iiiinois 60090 - 0767 September 18, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Quad Cities Station Unit 2 Proposed Technical Specification Amendment - Unit 2 Cycle 9 Reload NRC Docket No. 50-265

Dear Mr. Denton:

Pursuant to 10 CPR 50.90, Conunonwealth Edison Company (CECO) proposes to amend Facility Operating License DPR-30, Appendix A, the Technical Specifications, to support operation of Quad Cities Unit 2 during Cycle 9. The changes involve addition of Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) limits for the reload fuel and adjustment of the Minimum Critical Power Ratio (MCPR) limit to reflect the results of Cycle 9 Transient Analyses. In addition, we propose to delete the provisions for Single Loop Operation (SLO) from the License and incorporate SLO in the body of the Technical Specifications.

The following documents are provided as attachments to support our proposed amendment:

Attachment 1: proposed License and Technical Specification Changes for Quad Cities Unit 2.

Attachment 2: Summary of Unit 2 Cycle 9 Reload and Proposed Technical Specification Changes.

Attachment 3: General Electric Supplemental Reload Licensing Submittal for Unit 2 Cycle 9.

Attachinent 4: Errata and Addenda Sheets Nos. 14 and 15 to NEDO-24146A, Dresden and Quad Cities LOCA Analysis Report.

Attachment 5: Evaluation of No Significant Hazards Consideration.

The proposed amendment has been on-Site and off-Site reviewed and approved. We have reviewed this amendment request and determined that No Significant Hazards Consideration (NSHC) exists. Ceco has notified the Dg k State of Illinois of our request and our determination of NSHC by providing a copy of this letter and the attachments to the designated State Official.

s 8610060096 860918 PDR ADOCK 05000265 I 3 ff P , ppg Red wlcHeub5/9 %

r.

Mr. H. R. Denton September 18, 1986 In accordance with 10 CFR 170, a fee remittance in the amount of

$150.00 is enclosed.

We request your approval of this amendment by November 30, 1986.

If you have any further questions regarding this submittal, please contact this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.

Very truly yours, J. R. Wojnarowski Nuclear Licensing Administrator 1m

Enclosure:

Fee Remittance $150.00 Attachments: As Indicated Above cc: Region III Inspector - Quad Cities R. Bevan - NRR M. C. parker - IL BED AND SWQ to SUBSCR[metht=4 beforp /f day of UMI/l?(IV kot, 1986

'/ I. A ..

(Notary\lIPublic

. [

2072K