ML20096F109

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-19,changing Reporting Requirements of OL Section 2.G Re Notification of NRC of Violations
ML20096F109
Person / Time
Site: Dresden Constellation icon.png
Issue date: 04/24/1992
From: Piet P
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20096F115 List:
References
NUDOCS 9205200201
Download: ML20096F109 (2)


Text

_ _ _

,r'P"'M*~

/

\\ C:mm:nw:stth Edis:n l

__. ;d 1400 Opus Place e

(

/ Downers Grove, Hlinois 60515 April 24,1992 Dr. Thomas E. Murley, Director Office of Nuclear Reacter Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn
Document Control Desk

Subject:

Dresden Nuclear Power Station Unit 2 License Change for Reporting Requirements as Specified within Section 2 G. of License DPR 19 NRC Df-het No. 50 237

Reference:

Teleconference between CECO (P. Piet) and US NRC (B. Siegel) dated February 26,1992 Pursuant to 10 CFR 50.90, Commonwealth Edison (CECO) proposes to amend Facility Operating License DPR 19. The proposed licensed change clarlfies the reporting requirements of Section 2.G of Operating License DPR 19. As currently written, Section 2 G specifies NRC notification for violations to any requirements specified in Section 2.C of the License: However, Section 2.C(2) to License DPR 19 includes requirements for Appendix A, Technical Specifications for Dresden Station. Section 2.G does not clearly define Dresden's responsibility for reporting to the NRC violations from the requirements of Appendix A. Technical Specifications beyond the specific reporting requirements already delineated eithin Dresden's Technical Specifications. As discussed with members of your staff during the referenced teleconference,it is not the intent of Section 2.G of License DPR 19 to require additional reportina requirements outside of those already specified within the Technical Specifications. Therefore, Commonwealth Edison proposes changing Section 2.G of License DPR-19 to clarify Dresden's reporting requirements.

Dresden's proposed change to License DPR-19 reflects current industry standards already in place and accepted by the Cornmission at other sites. The proposed license ct'ange is specified as follows:

2.G The licensee shall report any violations of the requirements contained in Section 2, items C(1), C initial notification shall be(3), and C(4) of this license in the following manner:

made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73(b),(c), and (e).

t W

9205200201 920424 t

\\

(

PDR AbOCK 05000237 l

ti P

PDR I

/scl:1165:43

Dr. Murley

  • A ril 24,1992 t

The proposed changes are purely administrative in nature and have no impact on plant

~

operation or the safety analysis for Dresden Station. The changes proposed to License DPR-19 do not: 1) involve a significant increase in the probability or consequences of an accident previously evaluated; or 2) create the possibility of a new or different kind of accident

- from any accident previously evaluated; or 3) involve a significant reduction in a margin of safety, in addition, the proposed License change meets the criteria for categorical exclusion from environmental review per the requirements of 10 CFR 51.22 (c)(9).

The proposed license change has been reviewed and approved by CECO On Site and Off Site Review in accordance with Commonwealth Edison procedures.

To the best of my knowledge and belief, the information contained within is true and conect. In some respect these statements are not based on my personal knowledge, but obtained information furnished by other Commonwealth Edison employees. contractor employees, and conauftants. Such information has been reviewed in accordance with cvmpany practice, and I believe it to be reliable.

Commonwealth Edison is notifying the State of Illinois of this License change by transmitting a copy of this letter and its attachments to the designated state official.

Please direct cny questions you may have concoming this submhtal to this office.

Sincerely,

./

eter L. Pi Nuclear Licensing Administrator

Attachment:

Marked-up License Page cc:

A.B. Davis - Reolonal Administrator. Alli W.G. Rogers - senior P.esident inspector - Dresden B.L. Siegel-NRR. Project Manager Office of Nuclear Facility Safety -IDNS Si ed before me on this 8fMday, of nJ '

1992.by Notdri ~Ptibit j " OFrlCI AL w

S A N D R A C. L A rx ASEAL"l WWY PUSUC. STAT [ Or jtygj3 l MY CCM55:0N EXPM Wsmwe[$ g/2$fg4 '

l I

/scl:1165:44

!