|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20217E1551999-09-28028 September 1999 Comment Supporting Pr 10CFR50 Re Elimination of Requirement for Licensees to Revise ISI & IST Programs Beyond Baseline Edition & Addenda of ASME B&PV Code ML17313B0651999-07-30030 July 1999 Comment on Draft Rg DG-1076, Service Level I,Ii & III Protective Coatings Applied to Npps. ML17313B0161999-07-0101 July 1999 Comment on Draft Rg DG-1074, SG Tube Integrity. ML20196K5631999-06-29029 June 1999 Comment Supporting Proposed Rule 10CFR50.55a Re Elimination of 120-month Requirement to Update ASME Code ISI & Inservice Testing Program ML20207D1591999-05-20020 May 1999 Comment on Proposed Rules 10CFR21,50 & 54 Re Use of Alternative Source Terms at Operating Reactors ML17313A9791999-05-20020 May 1999 Comment Opposing Draft Reg Guide DG-1084, Qualification & Training of Personnel for Nuclear Power Plants. as General Comment,Util Believes That Many of Proposed Changes Will Limit Ability to cross-train Mgt Level Personnel ML20205A4271999-03-18018 March 1999 Comment on Petition for Rulemaking PRM-50-64 Which Requested Greater Clarification by NRC Re Possible Financial Obligations of NPP Licensees as Reflected in NRC Final Policy Statement on Restructuring & Economic Deregulation ML17313A8521999-03-0505 March 1999 Comment Supporting Proposed Change to NRC Enforcement Policy.Suggested Rewording of Sections Provided ML17313A8191999-02-24024 February 1999 Comment Supporting Secy 99-007, Recommendation for Reactor Oversight Process Improvements, & Comments Provided by NEI & Regional Utility Group Iv.Offers Comments on NRC Approach to Using Performance Indicators in Assessment Process ML20198J4031998-12-11011 December 1998 Comment Opposing Proposed Rule 10CFR50 Re Requirement for Monitoring Effectiveness of Maint at NPPs ML20217B9761998-04-0909 April 1998 Comment Re Draft RG DG-1029, Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safey-Related Instrumentation & Control Sys ML20216A9091998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50.55a Re Industry Codes & Stds ML17313A3361998-03-27027 March 1998 Comment Opposing Proposed GL Re Lab Testing on Nuclear-Grade Activated Charcoal. Believes That Proposed 60 Day Implementation Schedule Would Severely Challenge Resources of Limited Number of Qualified Vendors ML20217E8781998-03-27027 March 1998 Comment Supporting Proposed GL, Lab Testing of Nuclear- Grade Activated Charcoal ML17313A2511998-03-0303 March 1998 Comment on Proposed GL 98-XX Re Yr 2000 Readiness of Computer Sys at Npps. ML20203L5521998-02-25025 February 1998 Forwards Comments on Draft Reg Guide DG-5008, Reporting of Safeguards Events ML20202E4251998-01-30030 January 1998 Comment on Draft RG DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Npps. Draft RG Should Be Revised to Clarify That Alloy Analyzer Can Be Used Consistent W/Guidance in EPRI NP-5652 ML20199E0871998-01-17017 January 1998 Comment Opposing PRM 50-63A by Pg Crane Re Amending Emergency Planning Regulations to Require Consideration of Prophylactic Use of Potassium Iodide for General Public ML20202G4461997-12-0101 December 1997 Comment on Proposed Final Rule 10CFR50.Licensee Requests That Effective Date Be Delayed from 980101 to 0601,in Order to Provide Enough Time to Request & Obtain NRC Review of Exemption from Rule ML20212D1391997-10-17017 October 1997 Comment on Pr 10CFR55 Re NUREG-1021,Interim Rev 8, Operator Licensing Exam Stds for Power Reactors ML17312B4241997-04-23023 April 1997 Comment Supporting Draft Rg DG-1068 (Proposed Rev 3 to Rg 1.134, Medical Evaluation of Licensing Personnel at Npps) ML20134J9671997-02-0606 February 1997 Comment Supporting Proposed Rule 10CFR50, Draft Policy Statement on Restructuring & Economic Deregulation of Electric Util Industry ML20134N2521996-11-14014 November 1996 Comment on Draft RG DG-1012,proposed Rev 3 to RG 1.8, Qualification & Training of Personnel for Npp ML20117E3871996-08-0707 August 1996 Comment Supporting Proposed Rule 10CFR26 Re Mod to fitness-for-duty Program Requirements ML20113C6981996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Cautions NRC Not to Adopt Rules That Are Too Restrictive & Could Lead to Premature Decommissioning ML20117P1261996-06-24024 June 1996 Comment on Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Urges NRC to Approach Rulemaking Re Decommissioning Costs in Manner That Will Facilitate Federal Legislative Solution ML20095A8461995-11-28028 November 1995 Comment on Petition for Rulemaking PRM-50-62 Re Proposed Changes to 10CFR50.54.Util Endorses Industry Petition & Response Provided by NEI ML17311B2931995-11-27027 November 1995 Comment Opposing Draft NUREG/CR-6354, Performance Testing of Electronic Personnel Dosimeters. ML17311B1601995-08-31031 August 1995 Comment Opposing Review of Revised NRC SALP ML20087H7241995-08-16016 August 1995 Comment Opposing Proposed Rule 10CFR2 Re Comment on Revision of NRC Enforcement Policy ML20087H7501995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certification for ABWR Design & Std Design Certification for Sys 80+ Design ML20087H7331995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for ABWR Design & Standard Design Certification for Sys 80+ Design.Concurs w/ABB-CE Comments & NEI Recommendations ML17311B0071995-06-27027 June 1995 Comment on Proposed Review of NRC Insp Rept Content,Format & Style. Insp Detail Should Be Brief & Ref Previous Rept by Section or at Min IR Number ML20083N5031995-05-0505 May 1995 Comment on Proposed Rev to 10CFR50,app J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors. Proposed Rev Will Result in Highly Efficient Regulation ML20082P7461995-04-19019 April 1995 Comment Supporting Proposed Rules 10CFR170 & 171 Re Proposed Revs of NRC Fee Schedule for FY95 in Fr ML20082H0971995-04-10010 April 1995 Draft Policy Statement Re Freedom of Employees in Nuclear Industry to Raise Safety Concerns W/O Fear of Retaliation ML20081B5721995-03-0808 March 1995 Motion of Plains Electric Generation & Transmission Cooperative,Inc to Withdraw,W/Prejudice,Petition for Leave to Intervene,Request for Finding of Significant Change & for Antitrust Hearing & Comments.* W/Certificate of Svc ML17311A6691995-02-0202 February 1995 Comment Supporting Draft Rg DG-8014 (Proposed Rev 3 to Rg 8.13, Instruction Concerning Prenatal Radiation Exposure) ML20078H0671995-01-20020 January 1995 Comment Supporting NUMARC Position on Proposed Rules 10CFR20,30,40,50,51,70 & 72 Re Radiological Criteria for Decommissioning of Lands & Structures ML20077M5471995-01-0404 January 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Nuclear Power Reactor Proposed Rule ML17311A2461994-08-25025 August 1994 Comment on Draft Reg Guide (DG-1031), Monitoring Effectiveness of Maint at Npps. Term Maint Preventable Failure Needs to Be Defined & Compared to Term Maint Preventable Functional Failure. ML17310B1911994-04-12012 April 1994 Petition to Intervene of Public Utility Commission of Texas. W/Certificate of Svc ML17310B2041994-04-12012 April 1994 Petition to Intervene of Public Utility Commission of Tx ML20062M4141993-12-27027 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Procurement of Commercial Grade Items ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML17306B2461993-01-15015 January 1993 Comment Supporting in Part,Draft Reg Guide DG-1020, Monitoring Effectiveness of Maint at Npps. ML17306A9571992-09-0808 September 1992 Comments on Proposed Rev to Staff Technical Position on Radwaste Classification.Supports Rev ML20099E0621992-07-29029 July 1992 Comment Opposing Proposed Rule 10CFR50.63, Loss of All AC Power ML20090F9661992-03-0909 March 1992 Comment Supporting Proposed Rule 10CFR50 & 52 Re Training & Qualification of Nuclear Power Plant Personnel ML17306A4501992-02-0404 February 1992 Comment on Draft Reg Guide Task DG-8007 (Proposed Rev 1 to Reg Guide 8.7) Re Instructions for Recording & Reporting Occupational Radiation Exposure Data 1999-09-28
[Table view] Category:ORDERS
MONTHYEARML20215F2141986-10-10010 October 1986 Partially Withheld Order Imposing Civil Monetary Penalties in Amount of $100,000 (Ref 10CFR73.21) for Physical Security Violations CLI-85-17, Order CLI-85-17 Consenting to Allow Sale & Leaseback Financing Transaction by Public Svc Co of Nm in Response to Util 851018 Application.Served on 851212.Re-served on 8512131985-12-12012 December 1985 Order CLI-85-17 Consenting to Allow Sale & Leaseback Financing Transaction by Public Svc Co of Nm in Response to Util 851018 Application.Served on 851212.Re-served on 851213 ML20138G3141985-12-12012 December 1985 Order Consenting to Util 851018 Application Re Sale & Leaseback Financing Transaction by Public Svc Co of Nm & Authorizing Director,Nrr to Amend License as Described in SECY-85-367.Served on 851212 ML20134N2721985-09-0303 September 1985 Order Extending Time Until 851003 for Commission to Act to Review Director'S Decision 85-12.Served on 850903 ML20128M2971985-07-22022 July 1985 Order Dismissing Proceeding,Based on Withdrawal of West Valley Agricultural Protection Council,Inc 821014 Petition to Intervene & Granting of 850520 Settlement Agreement.Served on 850723 ML20128M4251985-07-19019 July 1985 Order Incorporating Joint Applicants 850624 Encl Proposed Corrections to Transcripts of 850611 & 12 Hearings Into Official Transcripts of Hearing.Served on 850723 ML20140C7761984-06-18018 June 1984 Order Directing Parties to File Complete Status Rept W/Aslb on or Before 840712,addressing,inter Alia,Agreements Reached on Stipulations Re Remaining Contentions.Served on 840619 ML20062H4691982-08-12012 August 1982 Memorandum & Order Denying Pl Hourihan 820621 Petition for Directed Certification of Two Evidentiary Rulings.No Reasons Given Why Certification Should Be Granted Rather than Appealing Record to Aslab ML20148F3071978-10-27027 October 1978 Grants 781020 Motion by Elec Dist 2,State of Az,For Extension,Until 781108,to File Petition for Leave to Intervene ML20150B8721978-10-27027 October 1978 Orders Extension of Time Until 781108 within Which Elec Dist 2 May File a Petition for Leave to Intervene as Per Motion of 781020 1986-10-10
[Table view] |
Text
. 1 .- .
UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of )
ARIZONA PUBLIC SERVICE COMPANY Docket Nos. 50-528 and 50-529 Palo Verde Nuclear Generating Station ) License Nos. NPF-41 and NPF-51 Units 1 and 2 ) EA 86-65 ORDER IMPOSING CIVIL MONETARY PENALTIES I
The Arizona Public Service Company (the licensee) is the holder of Operating License Nos. NPF-41 and NPF-51, issued by the Nuclear Regulatory Commission (the Connission). These licenses authorize the licensee to operate the Palo Verde Nuclear Generating Station, Units 1 and 2 in accordance with the conditions specified therein. Operating Licensee No. NPF-41, issued on June 1,1985, superseded License No. hPF-34, issued on December 31, 1984. Operating License No. NPF-51, i'ssued on April 23, 1986, superseded License No. NPF-46, issued on December 9, 1985.
II A routine physical security inspection of the licensee's activities under the licenses was conducted by Region V during the period February 11 through March 13, 1986. As a result of this inspection, it appears that the licensee had not conducted its activities in full compliance with the conditions of its licenses.
A written Notice of Violation and Proposed Imposition of Civil Penalties was served upon the licensee by letter dated May 5, 1986. This Notice stated the nature of the violations, the requirements of the Connission that the licensee 8610160123 86101o PDR
~
bb 0 ADOCK 05000528 PDR h. ,
r _
. *4 . * .
2 had violated, and the amount of civil penalties proposed for these violations.
A reply dated June 4,1986 to the Notice of Violation and Proposed Imposition of Civil Penalties was received from the licensee on June 5,1986.
Upon consideration of the licensee's response and the statement of facts, explanation, and arguments for mitigation contained therein, the Director, Office of Inspection and Enforcement has detertnined, as set forth in the Appendix to this Order, that the penalties proposed for the violations designated iii the Notice of Violation and Proposed Imposition of Civil Penalties should be imposed.
III In view of the foregoing and pursuant to Section 234 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2282, PL 96-295), and 10 CFR 2.205, IT IS HEREBY ORDERED THAT:
The licensee pay civil penalties in the amount of One Hundred Thousand Dollars ($100,000) within 30 days of the date of this Order, by check, draft, or money order payable to the Treasurer of the United States and mailed to the Director, Office of Inspection and Enforcement, U.S. NRC, Washington, D.C. 20555.
IV The licensee may, within 30 days of the date of this Order, request a
, hearing. A request for hearing shall be addressed to the Director, Office
~'
7OD
_. t ,
- - - ._-- ,_ _.._ = - . . . . - .
. .. r . .. .
3 of Inspection and Enforcement, U.S. Nuclear Regulatory Commission, Washington, D. C. 20555. A copy of the hearing request shall also be sent to the Assistant General Counsel for Enforcement, Office of General Counsel, at the same address. If a hearing is requested, the Commission will issue an Order designating the time and place of hearing. Upon failure of the licensee to request a hearing within 30 days of the date of this Order, the provisions of this Order shall be effective without further proceedings, and if payment has not been made by that time, the matter may be referred to the Attorney General for collection.
V In the event the licensee requests a hearing as provided above, the issues to be considered at such hearing shall be:
(a) whether the licensee was in violation of the Consnission's requirements as set forth in the Notice of Violation and Proposed Imposition of Civil Penalties referenced in Section II above, and (b) whether, on the basis of such violations, this Order should be sustained.
FOR THE NUCLEAR REGULATORY COMMISSION A
Jam s M. Taylor W irector Of ice of Inspection and Enforcement Dated at Bethesda, Maryland Db this/gthiayofOctober,1986 , , . .
Arizona Nuclear Power Project Distribution w/o Safeguards PDR LPDR SECY~
CA JMTaylor, IE JMartin, RV RStarostecki, IE JAxelrad, IE JLieberman, 0GC Enforcement Coordinators RI, RII, RIII, RIV, FIngram, PA GJohnson, RM RBurnett, NMSS EA File ES File DCS Distribution w/ Safeguards PRobinson IE AJohnson, RV yD0k 3
IE:E k RV
[
PRobfnson JMa t n OGCOVk JLieWerhan ES:0 JAx IE:D
/Td RSta ostecki s
Ih 4 'a(1or 10/ /86 10/q/86 10/g/86 .0/ /86 10/ /86 F)//0/86
%x ?D'
.