ML17272A019
From kanterella
Revision as of 05:22, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17272A019 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 09/29/2017 |
Revision: | 0 |
From: | Simmons P Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML17272A019 (3) | |
Similar Documents at Watts Bar | |
---|---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024
[Table view]Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05 Category:Report MONTHYEARWBL-24-047, Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program2024-09-25025 September 2024
[Table view]Analysis of Capsule V from the Tennessee Valley Authority Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program WBL-24-022, Cycle 5 Steam Generator Tube Inspection Report2024-05-16016 May 2024 Cycle 5 Steam Generator Tube Inspection Report WBL-24-007, Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program2024-03-0505 March 2024 Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-12-16016 December 2021 Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)2021-12-0909 December 2021 Revised Pressure and Temperature Limits Report (PTLR) ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-07-20020 July 2021 Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-03-23023 March 2021 Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) ML21060A9132021-03-17017 March 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-02-25025 February 2021 Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-02-11011 February 2021 Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)2020-12-16016 December 2020 Revised Pressure and Temperature Limits Report (PTLR) CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-08-28028 August 2020 Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program2020-04-16016 April 2020 Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2019-10-10010 October 2019 License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) ML19039A0492019-02-0808 February 2019 Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions ML19003A5692019-01-16016 January 2019 Review of the Fall 2017 Steam Generator Tube Inspection Report ML18242A0382018-08-30030 August 2018 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report CNL-18-092, Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02)2018-08-0101 August 2018 Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02) CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17313A1282017-11-0909 November 2017 Revised Pressure and Temperature Limits Report (PTLR) CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations2017-10-13013 October 2017 Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations ML17272A0192017-09-29029 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17263A1162017-09-20020 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17209A5542017-07-28028 July 2017 Cycle 14 Steam Generator Tube Inspection Report CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index2017-05-30030 May 2017 Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index ML16215A1042016-08-0202 August 2016 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report ML16113A0202016-04-22022 April 2016 Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information CNL-16-034, TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program2016-02-19019 February 2016 TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit2015-09-21021 September 2015 Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 32015-07-15015 July 2015 Individual Plant Examination of External Events (IPEEE) Report, Revision 3 CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-06-16016 June 2015 Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML15121A6562015-05-0101 May 2015 NRC Region II - CIB1 Watts Bar 2 Ip&S 194 Additional Questions Request List CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals2015-04-10010 April 2015 Severe Accident Management Alternatives for Reactor Coolant Pump Seals CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2015-03-25025 March 2015 Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid 2024-09-25 Category:Miscellaneous MONTHYEARWBL-24-007, Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program2024-03-0505 March 2024
[Table view]Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves ML19003A5692019-01-16016 January 2019 Review of the Fall 2017 Steam Generator Tube Inspection Report ML18242A0382018-08-30030 August 2018 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report CNL-18-092, Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02)2018-08-0101 August 2018 Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02) CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information ML17313A1282017-11-0909 November 2017 Revised Pressure and Temperature Limits Report (PTLR) ML17272A0192017-09-29029 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17263A1162017-09-20020 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17209A5542017-07-28028 July 2017 Cycle 14 Steam Generator Tube Inspection Report ML16215A1042016-08-0202 August 2016 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report ML16113A0202016-04-22022 April 2016 Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information CNL-16-034, TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program2016-02-19019 February 2016 TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 32015-07-15015 July 2015 Individual Plant Examination of External Events (IPEEE) Report, Revision 3 CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information ML15121A6562015-05-0101 May 2015 NRC Region II - CIB1 Watts Bar 2 Ip&S 194 Additional Questions Request List CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2015-03-25025 March 2015 Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14163A6582014-09-18018 September 2014 Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML14212A6032014-07-31031 July 2014 WBRD-50-391/86-60 - Final Report and Revised Completion Schedule IR 05000391/19860602014-07-31031 July 2014 WBRD-50-391/86-60 - Final Report and Revised Completion Schedule ML14149A1502014-06-16016 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A5422014-05-23023 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13246A0222013-08-28028 August 2013 Submittal of Pre-op Test Instruction ML13178A2812013-06-26026 June 2013 10 CFR 50.59 Summary Report Supplement ML13144A5762013-05-22022 May 2013 Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1) ML13126A2942013-04-29029 April 2013 10 CFR 50.59 Summary Report ML13121A0602013-04-29029 April 2013 Commitment Summary Report ML13080A3632013-03-18018 March 2013 Enclosure 3, Summer 2011 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone ML13080A3662013-03-18018 March 2013 Enclosure 1, Summer 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone ML13080A0732013-03-12012 March 2013 Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation.. ML13175A1352013-03-0505 March 2013 2-PTI-092-03, Revision 0, Nuclear Instrumentation Source Range Noise Checks During Hot Functional Testing. ML12356A3172012-12-17017 December 2012 Submittal of Pre-op Test Instruction, 2-PTI-063-06, Revision 0, Safety Injection System Check Valve Test. ML12335A3402012-11-27027 November 2012 Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of ML13108A2842012-11-12012 November 2012 Unit 1, Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report ML13175A1362012-11-0808 November 2012 2-PTI-099-06, Revision 0, Reactor Protection Setpoint Verification. ML13175A1342012-11-0101 November 2012 2-PTI-082-02, Revision 0, Rod Control - Non Hft. ML13175A1332012-10-22022 October 2012 2-PTI-085-01, Revision 0, Rod Control Functional Test. ML12236A1642012-07-19019 July 2012 Enclosure 1 Evaluation of Proposed Changes Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 1 ML12223A1832012-03-29029 March 2012 Environmental Protection Agency 2012 - Facility Detail Report - Environmental Facts Warehouse Fii - Moccasin Bend Wwtp ML11362A0562011-12-20020 December 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 7 ML11341A1572011-11-30030 November 2011 Attachments 7 Through 9, WNA-CN-00157-WBT-NP, Revision 1, CAW-11-3316, and WBT-D-3566 Np, Incore Instrument System Signal Processing System Isolation Requirement ML11326A2842011-11-18018 November 2011 Commitment Summary Report ML11257A0502011-08-31031 August 2011 Attachment 7, WCAP-17427-NP, Rev. 1, Watts Bar Nuclear Plant Unit 2 Common Q Post Accident Monitoring System Computer Security Assessment, Attachment 8, Application for Withholding Proprietary Information from Public Disclosure and Attachme ML1104003852011-02-0707 February 2011 Enclosure 2, Appendix a, Hydrothermal Effects on the Ichthyhoplankton from the Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir 2024-03-05 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17272A019&oldid=322777"