MONTHYEARML20210T5591999-08-12012 August 1999 Environ Assessment & Finding of No Significant Impact Re 990202 Application for Amends to Plant,Units 1 & 2.Proposed Action Would Correct Existing Editorial & Typographical Errors in TSs ML20249A7781998-06-15015 June 1998 Environ Assessment & Finding of No Significant Impact. Proposed Action Would Exempt Licensee from Requirement of 10CFR70.24(a) ML20197G3991997-12-0202 December 1997 Environ Assessment & Finding of No Significant Impact Re Indirect Transfer of Control of Interests in Units 2 & 3, Licenses to Extent Affected by Proposed Merger of Alantic Energy,Inc & Delmarva Power & Light Co 1999-08-12
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20210T5591999-08-12012 August 1999 Environ Assessment & Finding of No Significant Impact Re 990202 Application for Amends to Plant,Units 1 & 2.Proposed Action Would Correct Existing Editorial & Typographical Errors in TSs ML20195B6241998-12-31031 December 1998 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 56 for 980101-1231 ML20206E0351998-12-31031 December 1998 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 14 for 1998. with ML20206C5631998-12-31031 December 1998 Radioactive Effluent Release Rept 41 for Jan-Dec 1998 for Pbaps,Units 1 & 2 ML20249A7781998-06-15015 June 1998 Environ Assessment & Finding of No Significant Impact. Proposed Action Would Exempt Licensee from Requirement of 10CFR70.24(a) ML20217H5791997-12-31031 December 1997 Radiation Dose Assessment Rept Number 13 Jan-Dec 1997 ML20217M7971997-12-31031 December 1997 Radioactive Effluent Release Rept 40,970101-1231, for Peach Bottom Atomic Power Station Units 1 & 2 ML20248E1801997-12-31031 December 1997 PBAPS Annual Radiological Environ Operating Rept,Rept 55 for Jan-Dec 1997 ML20197G3991997-12-0202 December 1997 Environ Assessment & Finding of No Significant Impact Re Indirect Transfer of Control of Interests in Units 2 & 3, Licenses to Extent Affected by Proposed Merger of Alantic Energy,Inc & Delmarva Power & Light Co ML20138A9931996-12-31031 December 1996 Annual Effluent Release Rept Number 39,for 960101-1231 ML20138C8201996-12-31031 December 1996 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 12 for Period Jan-Dec 1996 ML20141C7391996-12-31031 December 1996 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept,Rept 54 Jan-Dec 1996 ML20112B6061995-12-31031 December 1995 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 53,Jan-Dec 1995 ML20107L9201995-12-31031 December 1995 Annual Effluent Release Rept No 38 Jan-Dec 1995 ML20107M2521995-12-31031 December 1995 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 11 for Jan-Dec 1995 ML20082P9991994-12-31031 December 1994 Annual Effluent Release Rept 37 Jan-Dec 1994 ML20082M6551994-12-31031 December 1994 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 10 for Jan-Dec 1994 ML20084A0411994-12-31031 December 1994 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept, Rept 52 for Period of 940101-1231 ML20029C7651993-12-31031 December 1993 Radiation Dose Assessment Rept 9 for 1993. ML20076K7801993-12-31031 December 1993 Corrected Copies of Semi-Annual Effluent Release Rept 36 Jul-Dec 1993, for PBAPS Units 2 & 3 ML20064H8801993-12-31031 December 1993 Revised Occupational Exposure Rept for 1993 ML20067D2611993-12-31031 December 1993 Semiannual Effluent Release Rept 36 Jul-Dec 1993 ML20063K2881993-12-31031 December 1993 PBAPS 1993 Occupational Exposure Tabulation 18 ML20056G0921993-06-30030 June 1993 Semiannual Effluent Release Rept 35 for Jan-June 1993 for Pbaps,Units 2 & 3 ML20044E3811992-12-31031 December 1992 Annual Radiological Environ Operating Rept,Rept 50 for Jan-Dec 1992. ML20114B5291992-06-30030 June 1992 Semiannual Effluent Release Rept 33,Jan-June 1992,Peach Bottom Atomic Power Station,Units 2 & 3 ML20095J8231991-12-31031 December 1991 Radiation Dose Assessment Rept,1991 ML20096G6911991-12-31031 December 1991 Annual Radiological Environ Operating Rept,Rept 49, for 1991 ML20094G7731991-12-31031 December 1991 Semi-Annual Effluent Release Rept for Jul-Dec 1991 ML20115A6251991-12-31031 December 1991 Revised 1991 Recorded Annual Whole Body Exposure Rept, Consisting of Listing of Std Format for Reporting Number of Personnel & man-rem by Work & Job Function for 1991 & Number of Individuals in Each Range ML20090B4321991-12-31031 December 1991 Standard Format for Reporting Number of Personnel & Man-Rem by Work & Job Function for the Period Jan-Dec 1991 ML20082L8751991-06-30030 June 1991 Semiannual Effluent Release Rept,Jan-June 1991 ML20115A6351990-12-31031 December 1990 Revised 1990 Occupational Exposure Rept, Consisting of Listing of Recorded Annual Whole Body Exposures ML20073Q7051990-12-31031 December 1990 Annual Radiological Environ Operating Rept 48,1990 ML20073H3461990-12-31031 December 1990 Radiation Dose Assessment Rept, 1990 ML20082M0181990-12-31031 December 1990 Corrected Solid Radwaste Portion of Semiannual Effluent Release Rept for Jul-Dec 1990 ML20029B0801990-12-31031 December 1990 Exposure Rept. W/910227 Ltr ML20090B4441990-12-31031 December 1990 Revised Annual Whole Body Exposure for 1990 ML20029B0791990-12-31031 December 1990 Semiannual Effluent Release Rept 30,Jul-Dec 1990. W/910227 Ltr ML20028G8201990-06-30030 June 1990 Peach Bootom Atomic Power Station Semiannual Effluent Release Rept,Jan-June 1990. ML20043J1001990-05-25025 May 1990 NPDES Nonccompliance Notification:On 900329,discharge of 30-40 Gallons of Fuel Oil Into Storm Sewer Drain Occurred & Release of 25 Gallons Fuel Oil Into Discharge Canal Occurred on 900510.Spill Prevention Control Plan Encl.W/O Encl ML20090B4561989-12-31031 December 1989 Revised Annual Whole Body Exposure for 1989 ML20043B6441989-12-31031 December 1989 1989 Annual Radiological Environ Operating Rept 47. W/ 900524 Ltr ML20115A6391989-12-31031 December 1989 Revised 1989 Occupational Exposure Rept, Consisting of Listing of Recorded Annual Whole Body Exposure ML20012C2541989-12-31031 December 1989 Recorded Annual Whole Body Exposure for Period Jan-Dec 1989. W/900309 Ltr ML20012C6181989-12-31031 December 1989 Semiannual Effluent Release Rept 28,Jul-Dec 1989. W/900228 Ltr ML20247G9191989-09-14014 September 1989 NPDES Noncompliance Notification:On 890907,bypass of Onsite Sewage Plant Resulted in Discharge of Not More than 1,000 Gallons of Untreated Sewage.Caused by Crack in Sewage Line. Domestic Water Secured & Sewage Pipe Repaired ML20245H4811989-08-0707 August 1989 NPDES Noncompliance Notification:On 890626,11 Gallons of Houghto-Safe 620 Hydraulic Fluid Spilled in Subpile Room of Unit During Preparation for CRD Removal Work.Major Portion of Spill Collected in Dry Well Sumps & Floor Flushed ML20246J9431989-06-30030 June 1989 Semiannual Effluent Releases Rept 27 for Jan-June 1989 ML20247M0291989-06-30030 June 1989 Rev 1 to Semiannual Effluent Releases Rept,Jan-June 1989 1999-08-12
[Table view] |
Text
_ _ _ -
L 7590-01-P UNITED STATES NUCLEAR REGUI.ATORY COMMISSION
, PECO ENERGY COMPANY DOCKET NOS. 50277 AND 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U. S. Nuclear Regulaimy Commission (the Commission) is considering issuance of
.l an exemption from the requirements of 10 CFR 70.24 for Facility Operating License Nos. DPR-
{
44 and DPR-56, issued to PECO Energy Company ( the licensee), for operation of the Peach Bottom Atomic Power Station, Units 2 and 3, located in York County, Pennsylvania.
ENVIRONMENTAL ASSESSMENT Identification of Proposed Action:
The proposed action would exempt the licenses from the requirements of 10 CFR 70.24(a), which require in each are9 in which special nuclear material is handled, used, or stored a monitoring system that will energize clear audible alarms if accidental criticality occurs. The proposed action would also exempt the licensee from the requirements to maintain emergency procedures for each area in which this licensed special nuclear material is handled, used, or stored to ensure that all personnel withdraw to an area of safety upon the sounding of the alarm, t
to familiarize personnel with the evacuation plan, and to designate responsible individuals for dwiermining the cause of the alarm, and to place radiation survey instruments in accessible locations for use in sfxh an emergency.
L The proposed action is in accordance with the licensee's application for exemption dated March 18,1998.
ADOCK O 77
_ P PDR l o -
L The Need for the Proposed Action:
The purpose of 10 CFR 70.24 is to ensure that, if a criticality were to occur during the handling of special nuclear material, personnel would be alerted to that fact and would take appropriate action. At a commercial nuclear power plant, the inadvertent criticality with which 10 CFR 70.24 is concemed could occur during fuel handling opershons. The special nuclear material that could be assembled into a critical mass at a commercial nuclear power plant is in the form of nuclear fuel; the quantity of other ferms of special nuclear material that is stored on site is small enough to preclude achieving a critical mass. Because the fuel is not enriched t;eyond 5.0 weight percent Uranium-235 and because commercial nuclear plant licensees have procedures and design features that prevent inadvertent criticality, the staff has determined that it is unlikely that an inadvertent criticality could occur due to the handling of special nuclear material at a commercial power reactor. The requirements of 10 CFR 70.24(a), therefore, are not necessary to ensure the safety of personnel during the handling of special nuclear materials l
st commercial power reactors. However, an sxemption to 10 CFR 70.24(a) is needed to permit a deviation from these requirements.
EnvironmentalImoacts of the Froocsed Action: j The Commission has completed its evaluation of the proposed action and concludes that the proposed action involves features located entirely within the restricted area as defined in 10 j
. CFR Part 20. ;
1 The proposed action will not result in an increase in the probability or consequences of accidents or insult in a change in occupational or pubic dose. Thorofore, there are no l radiological impacts associated with the proposed action. l l
The proposed action will not result in a change in nonradiological plant affluents and will have no other .ionradiological environmental impact.
_ ~ _ _ _ _ . _ _, ; __ , _
L I
Accordingly, the Commission concludes that there are no envlronmental impacts associated with this action.
j l
Altematives to the Proposed Aqt'st;
' Since the Commission has concluded that there is no measurable environmental impact associated with the proposed action, any altematives with equal or greater environmental impact
{
need not be evaluated. As an altemative to the proposed action, the staff considered denial of the proposed action. Denial of the application would result iri no change in current environmer,tal impacts. The environmentalimpacts of the proposed action and the altomative action are similar.
Altemative Use.of Resources:
This action does not involve the use of any resources not previously considered in the -
l " Final Environmental Statement Related to the Operation of Peach Bottom Atomic Power Station, -
Units 2 and 3," April 1973.
Aoencies and Persons Consulted:
i in accordance with its stated policy, on May 6,1998, the staff consulted with the I Pennsylvania State official, Mr. David Ney, of the State of Pennsylvania, Bureau of Radiation l L !
l Protection, regarding the environmentalimpact of the proposed action. The State official had no i
j comments, y EINDING OF NO. SIGN 1& CANT _lMPACI Based upon the environmental assessment, the Commission concludes that the proposed action will not have a significant effect on the quality of the human environment.
Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed action.
l l
. 1
-- _ ___ _ . ___ ___. .____._....m_.--m- . .
u For further details with respect to the proposed action, see the licensee's letter dated March 18,1998, which is available for public inspection at the Commission's Public Document Room, The Gelman Building,2120 L Street, NW., Washington, DC, and at the local public document room located at the Govemment Publications Section, State Ubrary of Pennsylvania I
(REGIONAL DEPOSITORY) Education Buliding, Walnut Street and Commonwealth Avenue, Box %di, Harrisburg, PA. !
Dated at Rockville, Maryland, this 15th day of ' June 1998.
FOR THE NUCLEAR REGUI.ATORY COMMISSION -
1 i
t 1WIohan C. dan, r roje Manager Project Directorate 1-2 !
Division of Reactor Projects- t/II Office of Nuclear Reactor Regulation
./