ML20249A774
| ML20249A774 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/15/1998 |
| From: | Thadani A NRC (Affiliation Not Assigned) |
| To: | Geoffrey Edwards PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20249A775 | List: |
| References | |
| TAC-MA1342, TAC-MA1343, NUDOCS 9806180221 | |
| Download: ML20249A774 (3) | |
Text
June 15,1998 e
Mr. Garrett D. Edwards
. Director-Licensing, MC 62A-1 PECO Energy Company
- Nuclear Group's Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195
SUBJECT:
ENVIRONMENTAL ASSESSMENT OF REQUEST FOR EXEMPTION FROM 10
)
CFR 70.24 CRITICALITY ACCIDENT REQUIREMENTS - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS MA1342 AND MA1343)
Dear Mr. Edwards:
. The staff of the Nuclear Regulatory Commission has prepared an environmental assessment in response to yuur request, dated March 18,1998, for an exeroption from the requirements of 10 CFR 70.24 concerning criticality accident requimments at Peach Bottom Atomic Power Station, Units 2 and 3.
Enclosed is a copy of the Environmental Assessment and Finding of No Significant impact of the requested exemption bei.9g forwarded to the Office of the Federal Register for publication.
- Smcorely, Mohan/
/S C. Thadani, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - t/11 l
Office of Nuclear Reactor Regulation Docket Nos. 50 277 l
and 50-278
Enclosure:
Environmental Assessment c0\\
Q~\\
ccw/ar:ci: See next page DISTRIBUTION:
Docket
. MO'Brien ACRS PUBLIC RCapra OGC PDI-2 Reading MThadani CAnderson, RGNI JZwolinski TEssig
, (t g DOCUMENT NAM
- \\ PEACH.EA A
kB kk h
LA:PDAlb PD:PDl-2 PGEB/BC,
OGC OFFICE NAME MThadani MdBdn RCapra N TEssigff k DATE 6/2b IN/98
'l b/98 b +/98 -
527/98-l l
/
COPY Yes/No Yes/No Yes/No Yes/No 4 Yes/No OFFICIAL RECORD COPY
, Yf IAb b lb$ khbhl, -,}
l 9906190221 990615 ADOCK 0 % 7 DR i
' June 15,1998 D
- Mr. Garrett D. Edwards Direew-Licensing, MC 62A-1.
PECO Energy Company Nuclear Group's Headquarters Correspondence Control Desk l
P.O. Box No. 195 l
Wayne, PA 19087-0195 I
SUBJECT:
ENVIRONMENTAL ASSESSMENT OF REQUEST FOR EXFJWIPTION FROM 10 CFR 70.24 CRITICALITY ACCIDENT REQUIREMENTS - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. MA1342 AND MA1343)
Dear Mr. Edwards:
The staff of the Nuclear Regulatory Commission has prepared an environmental assessment in response to your request, dated March 18,1998, for an exemption from the requirements of 10.
' CFR 70.24 concoming cnticality accident requirements at Peach Bottom Atomic Power Station, i
Units 2 and 3.
l Enclosed is a copy of the Environmental Assessment and Finding of No Significant impact of the I
requested exemption being forwarded to the Office of the Federal Register for publication.
Sincerely,
/S/
Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reacter Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-277 l
and 54278
Enclosure:
Environmental Assessment c0\\
7 i
cc w/enci: See next page i
DlRTElBUIlQtt l
Docket MO'Brien ACRS PUBLIC RCapra OGC
. PDI-2 Reading MThadani CAnderson, RGNI g
JZwolmski TEssig gd DOCUMENT NAM
- \\ PEACH.EA A
k.M b2 1.A:PQAth/
PD:PDI-2 PGE8/BC,
OGC )
OFFICE Md'Brien RCapra N TEssigh k NAME MThadani DATE 6/2'b8
. N/98
'l 5 /98 E 4'/98 5 2-7/98 l
i
/
COPY Yes/No Yes/No Yes/No Yes/No '
I Yes/No l
i OFFICIAL RECORD COPY-l yp pn n,nkp h0f GU L LG kUld 3
s 9906190221 990615 ADOCK 0
,77 gDR 2
f M4 g
y UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30806 0001
/
June 15, 1998 Mr. Garrett D. Edwards Director-Uoonsing, MC 62A-1 PECO Energy Company Nuclear Group's Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 190874195
SUBJECT:
ENVIRONMENTAL ASSESSMENT OF REQUEST FOR EXEMPTION FROM 10 CFR 70.24 CRITICALITY ACCIDENT REQUIREMENTS - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. MA1342 AND MA1343)
Dear Mr. Ec' wards:
~
The staff of the Nuclear Regulatory Commission has prepared an environmental assessment in response to your request, dated March 18,1998, for an exempbon from the requirements of 10 CFR 70.24 concaming criticality accident requirements at Peach Bottom Atomic Power Station, Units 2 and 3.
Enclosed is a copy of the Environmental Assessment and Finding of No Significant impact of the requested exemption being forwarded to the Office of the Federal Register for publication.
I
- Sincemly, n C. Thedaii, Senior P joct nager Project Directorate I-2 Division of Reactor Projects-1/ll Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
Environmental Assessment ocw/ encl: See next page
,p.,
,yg.
k e
=
.4--4.
t
\\
l I
Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Uriits 2 and 3 l
oc~
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street,826-1 P.O. Boy. 8469 i
Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre I
Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean ll.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B 3, Tawes State Office Building Regional Administrator, Region I i
U.S. Nuclear Regulatory Commission Dr. Judi'.h Johnsrud
'475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State Co!!ege, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-owner j
Baltimore, MD 21201 Affairs Pub!!c Service Electric and Gas A. F. Kirt>y, til Company External Operations - Nuclear P.O. Box 236 Delmarva Power & Light Comparrf.
Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy C&oany Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.19.5 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 Mr. Roy Denmark Enydanmental Review Coordinator 841 Chestnut Street Philadelphia, PA 19107 -
_ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _