Finding | |
---|---|
Title | Failure to Timely Identify, Document, and Evaluate Conditions that Challenge Operability |
Description | The team identified a finding of very-low safety significance (Green) and an associated NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to timely identify, document, and evaluate nonconforming conditions that called the operability of one or more SSCs into question. Specifically, the licensee was not timely in capturing and evaluating ten CAQs identified during this inspection in their CAP and in accordance with their procedures, which resulted in untimely operability determinations. The licensee captured this issue in their CAP as CARD 16-26633, CARD 16-26776, CARD 16-26534, and CARD 16-26678, and completed the associated operability determinations, which reasonably determined the affected SSCs remained operable. The performance deficiency was determined to be more-than-minor because, if left uncorrected, it would have the potential to lead to a more significant safety concern. The finding screened as of very-low safety significance (Green) because it did not result in the loss of operability or functionality of mitigating systems. Specifically, the licensee performed operability evaluations that reasonably determined that all of the affected SSCs remained operable. The team determined that this finding had a cross cutting aspect in the area of Human Performance because the licensee did not use a consistent, systematic approach to make decisions. Specifically, the licensee did not use the CAPs systematic process to identify CAQs and make timely and adequate prompt operability decisions. |
Site: | Fermi |
---|---|
Report | IR 05000341/2016007 Section 4OA2 |
Date counted | Sep 30, 2016 (2016Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | B Jose G Gardner G Nicely J Benjamin M Jeffers N Feliz-Adorno N Valos R Baker R Fernandes V Petrella |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |
Finding - Fermi - IR 05000341/2016007 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Fermi) @ 2016Q3
Self-Identified List (Fermi)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||