05000341/FIN-2015008-01

From kanterella
Revision as of 20:54, 20 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Fermi DTE Energy icon.png
Report IR 05000341/2015008 Section 1R17
Date counted Mar 31, 2015 (2015Q1)
Type: NCV: Green
cornerstone Barrier Integrity, Initiating Events, Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.17
Inspectors (proximate) A Dahbur
A Shaikh
J Corujo-Sandin
R Daley
Violation of: Technical Specification - Procedures

10 CFR 50 Appendix B Criterion III, Design Control

Technical Specification
INPO aspect
'