Title | Failure to Develop Adequate Procedures for Pre-Planning and Performing Maintenance Affecting Safety-Related Hydramotor |
Description | The inspectors documented a self-revealing non-cited violation of Clinton Power Station Technical Specification 5.4.1, Procedures for a failure to develop adequate procedures for properly pre-planning and performing maintenance affecting the performance of safety-related equipment which resulted in the subsequent failure of the Division 3 Diesel Room Ventilation damper hydramotor on August 15, 2013. Specifically, during pre-scheduled performance testing of the Division 3 (High Pressure Core Spray System) Emergency Diesel Generator Room Ventilation Damper hydramotor, the ventilation supply air intake damper, 1VD01YC, failed to open as a result of Damper Hydramotor 1TZVD003A experiencing an age-related degradation failure. This was due in part to the licensees failure to properly pre-plan and perform the appropriate preventive maintenance for the hydramotor due to inadequate procedures. Procedure WC-AA-113, Predefine Database Revisions, Revision 2, did not provide adequate instructions appropriate to the circumstances to properly pre-plan and perform maintenance affecting the performance of safety-related equipment. This resulted in a loss of safety function of the Division 3 Diesel Generator and its supported High Pressure Core Spray system because of the low confidence that diesel room temperature would be maintained to support the diesel during an event when it would be required to perform its function. The licensee replaced the failed hydramotor, performed testing on the new hydramotor, restored the diesel ventilation system to an operable status, and changed WC-AA-113 to ensure that work would be properly scheduled in the future. This issue is documented the corrective action program as IR 1546973 and IR 1547294. The performance deficiency was more than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone attribute and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences and is therefore a finding. Using IMC 0609, Appendix A, The SDP for Findings At-Power, issued June 19, 2012, Exhibit 2 for the Mitigating Systems Cornerstone. The inspectors answered Yes to the screening question under the Mitigating Screening Cornerstone Does the finding represent a loss of system and/or function? since the finding resulted in a loss of safety function. Therefore, a detailed risk evaluation was performed using IMC 0609, Appendix A. The SRAs evaluated the finding using the Clinton SPAR model version 8.17, SAPHIRE version 8.1.0 and concluded that the risk increase to the plant due to this finding is very low (Green). The inspectors determined that no cross-cutting aspect will be assigned to this performance deficiency since it occurred in 2005 and is not indicative of current plant performance. (Section 4OA3) |
Site: | Clinton |
---|---|
Report | IR 05000461/2014003 Section 4OA3 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | C Lipa E Sanchez Santiago K Carrington S Mischke W Schaup |
Violation of: | Technical Specification - Procedures Technical Specification |
INPO aspect | |
' | |
Finding - Clinton - IR 05000461/2014003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|