ML20245C433

From kanterella
Revision as of 04:52, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 871030 Meeting W/Util in Bethesda,Md to Discuss Compensatory Measures in Support of Licensee 871027 Request for Temporary Exemption to GDC 56
ML20245C433
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/1987
From: Stefano J
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Sniezek J
NRC
References
NUDOCS 8711030090
Download: ML20245C433 (2)


Text

- _ . _ _ . _ _ - _ _ _ _ - . _

J

  • - l e . 1

/ 'o Ig i i [ g UNITED STATES

$ Ve R NUCLEAR REGULATORY COMMISSION

%, sh WASHING ton. D. C. 20555 October 29, 1987 I Docket No. 50-341 MEMORANDUM FOR: T. Murley*

J. Sniczek J. Partlow R. Cooper F. Congel F. Miraglia* J. Roe G. Knighton R. Varga*

Starostecki* S. Black

  • D. Wigginton S. 8. Boger D. Muller D.Shao*

Crutchfield* G. Lainas J. Calvo L.

G. Holahan*

C. ibssi*

A. Thadani 5. Richardson i W. Lanning THRU:

Martin J. Virgilio, Project Director Project Directorate III-1 3 Division

& SpecialofProjects Reactor Projects - III, IV, V,

} FROM:

John J. Stefano, Project Manager Project Directorate III-1 Division ofProjects

& Special Reactor Projects - III, VI, V,

SUBJECT:

Fermi-2 MEETING WITH DETROIT EDISON ON FERMI in Bethesda on OctoberA 30, 1987 meeting will be held with representatives Phillips27Building October to explore com,pensatory measure:s inbeginning at 10I

' GDC-56 was, requested to preclude plant .

shutdown The exemption to wh the Primary Containment Radiation Monitor (PCRM) and e isolation D for design Sampling System is upgraded to meet GDC-56. rywell Hydrogen /0xygen isolation design was discovered by theen licenseThe Sampling System need in the found that automatic isolation Program.valves e on October installed 16, 1987 when intheythat change, plant Tech Specs or the ILRT system were not addressed GDC-56. the licensee discovered that a further redesign was ne d din pur ee to fully meet l

l l

8711030090 871029 DR ADOCK 0500 1 1

L . . _ _ _ _ _ _ _ .

. id .

Mr. B. Ralph Sylvia Detroit Edison Company Fermi-2 Facility cc:

Mr. Harry H. Voigt, Esq.

LeBoeuf, Lamb Leiby & MacRae 1333 New Hamps, hire Avenue, N.W. Ronald C. Callen Washington, D.C. 20036 Adv. Planning Review Section Michigan Public Service Commission John Flynn, Esq. 6545 Mercantile Way Senior Attorney P. O. Box 30221 Detroit Edison Company Lansing, Michigan 48909 2000 Second Avenue Detroit, Michigan 48226 Regional Administrator, Region III U.S. Nuclear Regulatory Commission -

799 Roosevelt Road Nuclear MonitoringFacilities Section Office and Glen Ellyn, Illinois 60137 Environmental Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Steve Frost Supervisor-Licensing Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161

l October 29, 1987 3 i

Since October 16th, the containment penetration has been isolated and the j plant has been in a 30 day LC0 Action required by Tech Spec 3.4.3.1 due to the loss of the PCRM. l l

Original signed by M. Virgilio John J. Stefano, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V

& Special Projects

  • Meetings between NRC technical staff and applicants for licensees are open for '

interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Register 28058, 6/28/78.

Distribution and Concurrence for Meeting Notice dated - 10/29/87 Distribution 2 Docket-File M E" NRC PDR Local PDR PD31 Memo File W. Lanning T. Murley J. Sniezek AD/ Region III Project Manager R. Ingram OGC-Bethesda E. Jordan Receptionist (Building where meeting is being held)

NRC Participants ACRS (10)

GPA/PA V. Wilson R. Cooper, ED0 B. Kolostyak cc: Licensee / applicant & Service List PM: PD31: DRSP D:PD31:DRSP MN lo/ vV87

[Al ng MJVIRGILIO lu/t1/87