_. _..
d
~
?
LICENSEE: Detroit Edison Company (DECO)
February 10, 1999 i
FACILITY:.
. Fermi 2 Nuclear Plant
SUBJECT:
MEETING WITH _THE DETROIT EDISON COMPANY TO DISCUSS THE FERMI 2 IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION 1
The NRC staff met with DECO at NRC Headquarters on January 25 and 26,1999, to discuss issues related to the Fermi 2 submittal for the conversion to the improved standard technical specifications.' The primary focus of the meeting was to_ discuss the December 4,1998, request
)
for additional information (RAI) for Sections 3.4 and 3.9 of the conversion and the proposed questions for an RAI for Section 3.6. The meeting was originally scheduled for 4 days.
However, the meeting was shortened to 2 days because the NRC lead reviewer for Section 3.6 l
was unavailable. The meeting to discuss the questions for Section 3.6 was rescheduled for the week of February 1. The Enclosure lists the meeting participants.
{
1 The staff was able to clarify some of its questions for Section 3.4 and 3.9 during the discussion, which will assist the licensee in preparing its responses. The staff and the licensee also discussed the timing for the licensee responses and the shff review and preparation of the i
safety evaluation. The licensee proposed submitting closure packages (final technical specifications pages, markups, etc.) for the various sections between the beginning of April and i
the end of June. The staff used this information to evaluate the impacts on its review schedule.
The staff believes it can now issue the amendment by the end of August 1999. To realize this i
schedule the staff will have to reduce its review time at the end of the process. The staff j
considers this schedule achievable.. However, it leaves little or no time to accommodate unforeseen problems. These issues were discussed with the licensee.
ORIGINAL SIGNED BY l
Andrew J. Kugler, Project Manager Project Directorate lil-1 l
Division of Reactor Projects-lil/IV 1
Office of Nuclear Reactor Regulation Docket No. 50-341 i
Enclosure:
As stated cc w/ encl: See next page j
QlSTRIBUTION:
E-mail Paper Coov g
SCollins/RZimmerman (SJC1/RPZ)
- COmaha(pge430441)]
j s
EAdensam (EGA1)
PUBLIC lg MWeston (MWW)
PD3-1 R/F 1
THiltz (TGH).
OGC i
JFoster (JWF)
ACRS BBoger (BAB2)
AKugler i
\\
j 9(0 l
AVegel (AXV).
DOCUMENT NAME: G:\\PD3-1\\WPDOCS\\ FERMI \\MTSSTS09.WPD To seco6ue a copy of Wits docuenoret leidicate in the box: *C" = Copy without atlichment/ enclosure "E* = Copy with attachment / enclosure "N"= No copy OFFICE PM:PD31 lE LA:PD31 l,N PD:PD3-1 lc NAME AKugler:db QM CJamersoM CACarpenter C8 f
DATE-02/ 9 /99 V 02/ 9 /99 []
02/ % /99 OFFICIAL REEORD COPY; l
9902180301 990210
&me i
. kmy 9wF @. - i'u w'v,
em
- A PDR 'ADOCK 05000341 a w
/v b
P
.l pop a
d
-e
)
w l
2-Detroit Edison Company Fermi 2 1
cc:
John Flynn, Esquire Mr. Douglas R. Gipson Senior Attomey Senior Vice President Detroit Edison Company Nuclear Generation 2000 Second Avenue Detroit Edison Company Detroit, Michigan 48226 6400 North Dixie Highway Newport, MI 48166 3
Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality i
3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission Resident inspector's Office i
6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville i
Monroe, Michigan 48161 Regional Administrator, Rogion lll l
U.S. Nuclear Regulatcc/ Commission 801 Warrenville Road Lisle,lilinois 60532-435.1 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, Michigan 48166 i
i December 1998 l
i
i j
e-l-
e g
I
~
MEETING ATTENDEES FOR JANUARY 25 AND 26,1999, FERMI 2 MEETING ON THE lMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION
)
N6ME AFFILIATION Andrew Kugler NRC/NRR/DRPW/PD31, Project Manager Jack Foster
- NRC/NRR/ADPR/TSB, Conversion Lead Reviewer Maggalean Weston*
NRC/NRR/ADPR/TSB, Section 3.4/3.9 Lead Reviewer Glenn Ohlemacher Detroit Edison, Licensing Charles Boyce Excel Inc. (contractor to Detroit Edison)
Dan Williamson Excel Inc. (contractor to Detroit Edison) i l
Part-time participant i
ENCLOSURE
- -