ML20212H537

From kanterella
Revision as of 01:11, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Views of Chairman Jackson on SECY-96-176
ML20212H537
Person / Time
Issue date: 09/23/1996
From: Slosson M
NRC COMMISSION (OCM)
To: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20212H254 List:
References
FRN-64FR17510, RULE-PR-72 AG02-2-032, SECY-96-176-C, NUDOCS 9910010174
Download: ML20212H537 (2)


Text

e k h$ 2. # Z

. /*D/f

- #" "% UNITED STATES

.fl g NUCLEAR REGULATCflY COMMISSION .

,k o' WASHINGTON, D. C. 20555 A

j E p-s! f p-,

OFFICE OF THE September 23, 1996 s~~

CHAIRMAN Bahadur Riani

"~ ~ ~ '

MEMORANDUM TO: John C. Hoyle, Secretary FROM: Marylee M. Slosson Executive Assistant / W 1 and Director Office of the Chairman t

]

SUBJECT:

SECY 96-176 - PROPOSED RULEMAKING ACTIVITY PLAN Attached are the revised views of Chairman Jackson on SECY-96-176.

Attachment:

As stated cc: Commissioner Rogers Commissioner Dicus '

Commissioner Diaz Commissioner McGaffigan EDO OGC 1

k i

1 9910010174 990924 PDR PR 72 64FR17510 PDR ,

  • ~

0 b'C

fI .

l Rovised Chairman's views on SECY-96-176 I have no objection to the proposed rulemaking activity plan. While I do not object to moving forward with the development of a rulemaking plan to shorten or eliminate the 30-day period in loading sp~e nt fuel after preoperational testing, I. note that continued vigilance is seded in the development of staff

.and industry guidance in the area of dry cask storage. Staff guidance in the form of a Standard Review Plan and Industry guidanca in tbn 4rrc of a Regulatory Guide should be robust and consistent to ensure that all appropriate areas are comprehensively evaluated. Specific emphasis should be placed on assuring that loading and unloading procedures for b)th normal and abnormal occurrences ar^ in place and appropriate. In addition, the staff should continue to provide extensive oversight presence during preoperational testing examining acceptance criteria and test results in real time.

N hwy ~

Mal %

l l

l-