MONTHYEARML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20237E0271998-08-25025 August 1998 Summary of 980625 Meeting W/Entergy Operations,Inc to Discuss Bulletin 96-003 Re Installation of ECCS Suction Strainer in Ninth Refueling Outage for Plant.List of Attendees & Licensee Handout ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20236F8171998-06-24024 June 1998 Summary of 980331 Meeting W/Util to Brief NRC on Licensee Risk Mgt of Upcoming Ninth Refueling Outage.List of Attendees & Handouts Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20216C6471998-03-0505 March 1998 Summary of 980123 Meeting W/Entergy Operations,Inc Re EP Changes Being Considered by Licensee.List of Meeting Attendees,Meeting Agenda & Info Provided by Licensee at Meeting in Handout Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20217E0131997-09-29029 September 1997 Trip Rept of 970825-26 Visit to Plant,Unit 1 for Interviews in Preparation of Salp.Agenda for Interviews Encl ML20198R3481997-09-0404 September 1997 Trip Rept of 961121 Visit to GGNS to Discuss Implementation Methodologies Employed for Graded Aq in Procurement Area ML20141H3661997-07-17017 July 1997 Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl ML20137U1331997-04-10010 April 1997 Summary of 970325 Meeting W/Util in Clariborne County,Ms to Discuss Entergy Operations,Inc MOV Thrust Methodology Used for GL 95-07 for Plant.List of Attendees & Info Provided by NRC Staff Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20132D1421996-12-17017 December 1996 Summary of 960827 Meeting W/Util in Rockville,Md Re Graded Quality Assurance Initiative at Facility.W/Attendees List, Summary of Licensee Presentation & Licensee Expert Panel Guidance Document ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134N5661996-11-21021 November 1996 Summary of 961003 Meeting W/Licensee in Rockville,Md to Discuss Licensee Upcoming Eighth Refueling Outage for Ggns,Unit 1 ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20129G5261996-07-31031 July 1996 Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants ML20059C4041993-12-27027 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl ML20058P4491993-12-15015 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20062H4811990-11-28028 November 1990 Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl ML20056B4161990-08-17017 August 1990 Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20244D8961989-06-12012 June 1989 Summary of 890518 Meeting W/Util Re Performance of Licensing Activities.Meetings Should Be Scheduled to Seek Means for Eliminating Weaknesses Identified by NRC ML20244C6441989-06-0909 June 1989 Summary of 890517 Meeting W/Seri in Rockville,Md Re Licensee Plans for Fuel Cycle 5,which Include Use of New Type of Fuel Assembly Developed by Advanced Nuclear Fuels Corp ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L4791989-05-11011 May 1989 Summary of 890214 Meeting W/Util in Rockville,Md Re Pipe Support Calculations.List of Attendees & Handouts Encl ML20247F8481989-05-11011 May 1989 Summary of 890214 Meeting W/Util in Rockville,Md Re Proposed Alternate DHR Sys & Proposed Exceptions to Tech Spec 3.0.4. Agenda & Related Info Encl ML20196B5971988-12-0505 December 1988 Summary of 881116 Meeting W/Util to Brief Reviewers Re Request for Tech Spec Changes Per Generic Ltr 87-09 ML20195G0741988-11-15015 November 1988 Summarizes Discussions W/Licensee During CRGR 881102-03 Visit to Plant.Util Mgt Described Licensing History,Past SALP Records & Key Issues Which Resulted in Delays & Addl Costs.Util Rept of Visit to Foreign Reactors Encl.W/O Encl ML20206E3031988-11-15015 November 1988 Summary of 881110 Meeting W/Util in Rockville,Md Re Design Criteria & Safety Aspects of Alternate DHR Sys.Attendance List & Viewgraphs Encl ML20206E6711988-11-15015 November 1988 Summary of 881101 Meeting W/Licensee at Site Re Potential Changes to Tech Specs Concerning Review of Fire Protection Program & New Auxiliary Hoist for Fuel Handling Platform Over Spent Fuel Pool ML20155H9771988-10-18018 October 1988 Summary of 880831 Meeting W/Util in Rockville,Md Re Status of Leasing Activities & Schedule for Completion of Activities.Related Info,Including Meeting Agenda & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20154E6161988-09-14014 September 1988 Summary of 880815 Meeting W/Util Re Plans for Third Refueling Outage.Major Activities During Outage Include: Chemical Cleaning of Standby Svc Water Sys,Low Pressure Turbine Insp & Inservice Insp of RCS ML20154E6511988-09-14014 September 1988 Summary of 880815 Meeting W/Util Re Potential Changes to Tech Specs.Other Actions Discussed Includes,Status of Completion of Conditions in Operating License & Actions Taken Re Problems Identified in Info Notices ML20153E4321988-09-0101 September 1988 Summary of 880728 Meeting W/Util on Licensing Actions Re Third Fuel Reload.List of Attendees & Viewgraphs Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R7011988-08-0808 August 1988 Summary of 880614 & 15 Meetings W/Util Re Potential Changes to Tech Specs,Allowing Change in Operational Modes When Limiting Conditions for Operation Not Met.List of Participants & Potential Tech Spec Changes Encl ML20150E0241988-06-21021 June 1988 Summary of 880615 Meeting W/Utils Re Proposed Establishment & Licensing of Sys Energy Resource,Inc as Operators & Licensing Agent for Plants 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20237E0271998-08-25025 August 1998 Summary of 980625 Meeting W/Entergy Operations,Inc to Discuss Bulletin 96-003 Re Installation of ECCS Suction Strainer in Ninth Refueling Outage for Plant.List of Attendees & Licensee Handout ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20236F8171998-06-24024 June 1998 Summary of 980331 Meeting W/Util to Brief NRC on Licensee Risk Mgt of Upcoming Ninth Refueling Outage.List of Attendees & Handouts Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20216C6471998-03-0505 March 1998 Summary of 980123 Meeting W/Entergy Operations,Inc Re EP Changes Being Considered by Licensee.List of Meeting Attendees,Meeting Agenda & Info Provided by Licensee at Meeting in Handout Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20141H3661997-07-17017 July 1997 Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl ML20137U1331997-04-10010 April 1997 Summary of 970325 Meeting W/Util in Clariborne County,Ms to Discuss Entergy Operations,Inc MOV Thrust Methodology Used for GL 95-07 for Plant.List of Attendees & Info Provided by NRC Staff Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20132D1421996-12-17017 December 1996 Summary of 960827 Meeting W/Util in Rockville,Md Re Graded Quality Assurance Initiative at Facility.W/Attendees List, Summary of Licensee Presentation & Licensee Expert Panel Guidance Document ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134N5661996-11-21021 November 1996 Summary of 961003 Meeting W/Licensee in Rockville,Md to Discuss Licensee Upcoming Eighth Refueling Outage for Ggns,Unit 1 ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20129G5261996-07-31031 July 1996 Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants ML20059C4041993-12-27027 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl ML20058P4491993-12-15015 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20062H4811990-11-28028 November 1990 Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl ML20056B4161990-08-17017 August 1990 Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20244D8961989-06-12012 June 1989 Summary of 890518 Meeting W/Util Re Performance of Licensing Activities.Meetings Should Be Scheduled to Seek Means for Eliminating Weaknesses Identified by NRC ML20244C6441989-06-0909 June 1989 Summary of 890517 Meeting W/Seri in Rockville,Md Re Licensee Plans for Fuel Cycle 5,which Include Use of New Type of Fuel Assembly Developed by Advanced Nuclear Fuels Corp ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247F8481989-05-11011 May 1989 Summary of 890214 Meeting W/Util in Rockville,Md Re Proposed Alternate DHR Sys & Proposed Exceptions to Tech Spec 3.0.4. Agenda & Related Info Encl ML20246L4791989-05-11011 May 1989 Summary of 890214 Meeting W/Util in Rockville,Md Re Pipe Support Calculations.List of Attendees & Handouts Encl ML20196B5971988-12-0505 December 1988 Summary of 881116 Meeting W/Util to Brief Reviewers Re Request for Tech Spec Changes Per Generic Ltr 87-09 ML20206E3031988-11-15015 November 1988 Summary of 881110 Meeting W/Util in Rockville,Md Re Design Criteria & Safety Aspects of Alternate DHR Sys.Attendance List & Viewgraphs Encl ML20206E6711988-11-15015 November 1988 Summary of 881101 Meeting W/Licensee at Site Re Potential Changes to Tech Specs Concerning Review of Fire Protection Program & New Auxiliary Hoist for Fuel Handling Platform Over Spent Fuel Pool ML20155H9771988-10-18018 October 1988 Summary of 880831 Meeting W/Util in Rockville,Md Re Status of Leasing Activities & Schedule for Completion of Activities.Related Info,Including Meeting Agenda & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20154E6161988-09-14014 September 1988 Summary of 880815 Meeting W/Util Re Plans for Third Refueling Outage.Major Activities During Outage Include: Chemical Cleaning of Standby Svc Water Sys,Low Pressure Turbine Insp & Inservice Insp of RCS ML20154E6511988-09-14014 September 1988 Summary of 880815 Meeting W/Util Re Potential Changes to Tech Specs.Other Actions Discussed Includes,Status of Completion of Conditions in Operating License & Actions Taken Re Problems Identified in Info Notices ML20153E4321988-09-0101 September 1988 Summary of 880728 Meeting W/Util on Licensing Actions Re Third Fuel Reload.List of Attendees & Viewgraphs Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R7011988-08-0808 August 1988 Summary of 880614 & 15 Meetings W/Util Re Potential Changes to Tech Specs,Allowing Change in Operational Modes When Limiting Conditions for Operation Not Met.List of Participants & Potential Tech Spec Changes Encl ML20150E0241988-06-21021 June 1988 Summary of 880615 Meeting W/Utils Re Proposed Establishment & Licensing of Sys Energy Resource,Inc as Operators & Licensing Agent for Plants ML20154S0341988-05-27027 May 1988 Summary of 880519 Meeting W/Middle South Utils Representatives Re Proposed Establishment & Licensing of Middle South Utils Nuclear Operating Co.Agenda Encl ML20154G8161988-05-17017 May 1988 Summary of 880510 Meeting W/Util Re Licensing Matters.Util Will Submit Commitment to Install GE Wide Range Monitor by Fourth Refueling Outage.List of Attendees Encl ML20149J9181988-02-19019 February 1988 Summary of 871202 Meeting to Brief Director & Assistant Director for Region II Reactors in NRR on Util Operations. Meeting Attendee & Handout Encl 1999-08-04
[Table view] |
Text
.
34 UNITED STATES
, [ iw g NUCLEAR REGULATORY COMMISSION 3 p WASHINGTON, D. C. 20555 c
%, '..... / March 3, 1987 Docket No. 50-416 LICENSEE: System Energy Resources, Inc. (SERI)
FACILITY: Grand Gulf Nuclear Station, Unit 1~
SUBJECT:
SUMMAPY OF FEBRUARY 11, 1987 MEETING REGARDING CONTAINMENT PURGING The purpose of the meeting was to discuss a program for obtaining operational data regarding containment purging. SERI participants were J. G. Cesare,
'J. Fowler and L. Robertson. NRC participants were J. Kudrick, P. Hearn, J. Unda and L. Kintner. Enclosure 1 is a handout prepared by SERI.
The present limits in the Technical Specifications on purging during plant operation (continuous puroe through the 6-inch line and 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> per year through the 20-inch line) were based on General Electric Company analyses of reactor coolant activity and leakage. In accord with License Condition 2.C.16, SERI provided a report dated October 3, 1986, based on data gathered during the first fuel cycle. SERI recommended in the report that the present limits on purging be continued.
Based on its review of the report, the staff expressed two concerns: (1) that the purge system should not be used for temperature and humidity control; and (2) that the data provided in the report was not adequate to justify the present purge limits. The information presented in this meeting was in response to these concerns.
The licensee described the need for routine, periodic access to the Mark III containment because many reactor support systems are located inside containment and maintenance and surveillance requires entries every day.
Sheet 2 of the Enclosure shows typical systems and access requirements.
Sheets 4 through 6 show the design of the Mark III containment and the purge system and present criteria for its operation. The system is not relied on for temparature or humidity control. The system includes recirculation of 3000 CFM through a charcoal filter train. Containment purge isolation valves are required by Technical Specifications to close in four seconds and are designed to close against LOCA pressures.
The staff questioned whether surveillance and maintenance activities were coordinated to achieve minimum access time in containment. The licensee stated that some surveillances are required once a day (e.g. reactor water samples and standby liquid control system concentration). Because of the large containment volume, the large purge system requires two days to make one air change.
Therefore, if cleanup were needed for access, continuous purge may be needed.
The air recirculation filter system is run continuously. During the first fuel cycle, radioactivity in the containment air was small (about 1% of the 10 CFP 8703090157 870303 PDR P ADOCK 05000416 pop ,
. Part 70 maxirum permissible concentration (MPC) at the end of the first fuel cycle). Presently, the containr.,ert air is about 8% MPC. The need for a continuous purae for access has not been demonstrated in the first fuel cycle.
From ALARA considerations, 25% MPC is selected as a reasonable limit for access.
The licensee proposed a program to obtain additional data regarding the need to purge during the second fuel cycle (See Sheets 7 and 8 of Enclosure 1). Tc resolve the concern that purging not be used to control temperature and humidity, the licensee proposed a 30 dry test in which the puroa sytem would be isolated.
Parameters to be meesured would include temperature, relative huridity, pressure and air radioactivity. If radioactivity reaches 25% MPC, purging for access would be initiated. The test is planned to be run in February and March. To resolve the concern for adequate data regarding need for access, containment access will be monitored (individual's name, discipline, and time spent in containment) during the second fuel cycle. The security computer monitoring program has been modified tc obtain needed data. The purge systems will be isolated unless containment air radioactivity reaches 25% MPC.
SERI will send NRC a letter within a few weeks summarizing the test monitoring program described in this meeting and provide a commitment to document the methodology used to determine the annual purcing time limits for Grand Gulf after the second fuel cycle.
hDs Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing Enclosure (s):
As stated ccw/ enclosure (s):
See next page 1
o .
D Mr. Oliver D. Kingsley, Jr.
System Energy Resources, Inc. Grand Gulf MLclear Station (GGNS)
CC.
Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager and Support . System Energy Resources, Ir.c.
Syster Energy Resources. Inc. Post Office Box 756 Post Office Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Hnnorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39101 Washington, D. C. 20036 Attorney General Mr. Ralph T. Lally Gartin Building Manaoer of Quality Assurance Jackson, Mississippi 39205 Middle South Utilities System Services, Inc.
P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. John G. Cesare Resources Director, Nuclear Licensing and Safety Bureau of Pollution Control System Energy Resources, Inc. Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.
Mr. R. W. Jackson, Project Engineer State Fealth Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Cutcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Pegional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. James E. Cross GGNS Site Director Systen. Energy Resources, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
. Er. closure l' NRC - SERI MEETING: CONTAINMENT PURGE BETHESDA, MARYLAND FEBRUARY ll, 1987 MEETING AGENDA I. INTRODUCTION J. G. CESARE II, 0VERVIEW 0F THE-MARK III-CONTAINMENT J. L. ROBERTSON ACCESS REQUIREMENTS III, DESIGN OF THE CONTAINMENT PURGE J. L, ROBERTSON/
J. O. F0WLER IV. NRC CONCERNS REGARDING THE ADEQUACY OF J. 0, F0WLER THE CONTAINMENT COOLING SYSTEM V. CYCLE 2 MONITORING PROGRAM /USE OF PURGE J. G,-CESARE VI
SUMMARY
/ CONCLUSION REMARKS J. G. CESAPE 4
J16 AGENDA 87020301 - 2
MARK Ill CONTAINMENT ACCESS REOUIREMENTS 0 COMPARISON OF THE MARK 11 AND MARK 111 CONTAINMENT DESIGNS MARK 11 CONTAINMENT ROUGHLY EQUIVALENT IN SIZE TO THE MARK 111 DRYWELL MARK 111 CONTAINMENT DESIGN ALLOWS MORE REACTOP SUPPORT ,
SYSTEMS TO BE LOCATED INSIDE CONTAINMENT THEREFORE REQUIRING ACCESS DURING POWER OPERATION O TYPICAL EQUIPMENT / SYSTEMS LOCATED INSIDE THE MARK lli CONTAINMENT REACTOR WATER CLEANUP SYSTEM REACTOR WATER SAMPLE PANEL
~
STANDBY LIQUID CONTROL CRD HYDRAULIC CONTROL UNITS RECIRC FLOW CONTROL VALVE HYDRAULIC POWER UNITS REACTOR VESSEL & DRYWELL INSTRUMENTATION RACKS UPPER CONTAINMENT POOLS TRANSVERSING INCORE PROBE SYSTEM i
ISOLATION VALVES CONSIDERED ACCESSIBLE O TYPICAL ACCESS REQUIREMENTS BASED ON EARLY CYCLE 2 DATA (1/6/87 - 1/31/87)
OPERATIONS - 41 MAN HOURS / WEEK MAINTENANCE - 73 MAN HOURS / WEEK HEALTH PHYSICS - 47 MAN HOURS / WEEK CHEMISTRY - 12 MAN HOURS / WEEK THE ABOVE ACTIVITIES REPRESENT THE MAJORITY (94%) 0F IN-CONTAINMENT WORK WHILE AT POWER, J16 AGENDA 87020301 - 3 2-
o .
a f %
I w n
. . ' ']
I
_f
\
l Reactor -
veuei N-
, , j Prnmary centainment '
'l
~ '"
Wet well E
Dry weil l -g M
g __
Pedecal %
l v.j ;
?;;;r - x l ..,
.D h_ 8 _ _ _
Downcomers e< ,-
I .
S** * * * 'Y containment
~ ' :- ~~ .' -( ^
=L
' = - -
p _ .
- f. - :'.
8"S,D" "i "
P
. . i l .
Figure 3. BWR Mark II containment.
NUREG-1037 5 APPENDIX B 2
J l_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . . - ..-.~ - - - - - - - - ~ ~ - -
.. Primary containment o
0.25-in steel liner Polar crane .:.
m w _ r t l ,;
,-l 2.5-ft coni: rete
,; ,. (Detail drawing not to scale)
- Upper contalnment pool ',.l,'
j - C.
.- ' Note: Upper containr ent dome and lower
.h-s et .
. wetwell communicate
.' ' N '
I 'l .
'. with each other
.. , , 'i .
,e
?
,'. I l,]m I i , . - ., . . . . - Temporary
'. ,e d,-
",7 3i . ,
Fi . fuel storage C '-
l e
Dryweii jl l .
r ... , : ' . . ,. - ; . - -
- s. .-
- 8. ' b M Reactor
'l. Drywell wall f*
el e, . ' , _ .
'e. .
l +, ' *
-l .
./ etweil Vent w.11
',.i ,* :' " *
annulus t
/. , . ,
p;
..j *
'.' .! a wall .=
/ '.
.. : .-- l \, y; -
== *:
g . .. -
.; 1 .. Horizontal ..'
',I Suppress. ion -
i.-.s8
/ -
-a y nts ,.
pool Pedestal .< -
a ,
/
.....:e
..... .:i. :.: . ; .. . . * . . . vt..* .:o.; - Containment
. . . . ; : . .:*:. ::.;.. . . . ; .e. ... V: ' !. . . . . , ':s ...;.r..g... .:... -. l. ?. . ;.. ... :;;;r. p
.; ., m,,
Figure 4. BWP Mark III containment.
NUREG-1037 6 APPENDIX B f
DESIGN OF THE CONTAINMENT PURGE O DESCRIPTION OF THE LOW VOLUME AND HIGH VOLUME PURGE O COMPLIANCE WITH THE POSITIONS OF BTP 6-4 ISOLATION VALVES HAVE BEEN SHOWN TO FUNCTION PROPERLY AGAINST LOCA PRESSUPES. CLOSURE TIMES ARE REQUIRED BY TECH SPECS TO BE LESS THAN 4 SECONDS. TESTING OF THE ISOLATION VALVES IS COVERED UNDER THE ISI PROGRAM.
THE NUMBER OF SUPPLY AND EXHAUST LINES TRE LIMITED TO ONE SUPPLY LINE AND ONE EXHAUST LINE FOR EACH PURGE SUBSYSTEM. TECH SPECS PROHIBIT USE OF BOTH THE HVP AND THE LVP AT THE SAME TIME.
THE LVP NOMINAL LINE SIZE IS 6 INCHES. THE HVP NOMINAL LINE SIZE IS 20 INCHES, HOWEVER, USE OF THE HVP IS LIMITED TO 1000 HOURS PER YEAR WHILE IN OPERATIONAL CONDITIONS 1, 2 AND 3.
THE PURGE PENETRATIONS MEET GDC 54 AND 56 FOR LINES PENETRATING CONTAINMENT.
PURGE LINES HAVE REDUNDANT ISOLATION VALVES WHICH ISOLATE ON LOCA SIGNALS. OUTBOARD AND INBOARD VALVES ARE POWERED BY SEPARATE DIVISIONS.
ISOLATION VALVES ARE TESTED PERIODICALLY IN ACCORDANCE WITH TECH SPECS.
SEISMIC CATEGORY I SCREENS ARE PROVIDED FOR BOTH THE INLET AND EXHAUST VALVES TO PREVENT DEBRIS FROM EFFECTING VALVE CLOSURE UNDER POSTULATED ACCIDENT CONDITIONS.
NOT RELIED ON TO CONTROL TEMPERATURE AND HUMIDITY.
PROVISIONS FOR ATMOSPHERE CLEANUP ARE PROVIDED BY THE CONTAINMENT FILTRATION SUBSYSTEM.
ISOLATION FUNCTION IS DEMONSTRATED ONCE PER 18 MONTHS AND LEAK RATE TESTED ONCE PER 92 DAYS.
ANALYSIS HAS BEEN PERFORMED ON THE CONSEQUENCES OF A LOCA WHILE PURGING THE CONTAINMENT ATMOSPHERE. THE RADIOLOGICAL CONSEQUENCES ARE WITHIN THE 10CFR100 GUIDELINES.
J16 AGENDA 87020301 - 4 5
l
. c n R M
R Ev m'c.r N U
T r l
M 1
M
. " ou -r ,c
f V
El Ml t
b E H
" c y D i
, ,e u, LO
,C I
~'
L A
V E REN O c" n FY W S A l
N c E C I
=
s u
n
=>m,m r h
R
- AE C S R, T
G ,, "w' . LA RB EN I
E i I
L s, T I
l E w L O - T T
I m a=m.mA C oaob URDD A E E t
ucuOs h gL = 'i
{
P P d . I
=
-n_u Om I
E K c'aLg@Q@
m
=
gr
- )P v
- (t J, us g
Q Qru A m
O((
r t
N '
= '
1 'm 2O p )
e t
s 4s g;g g i! ey hS m %9'- '
t n
3.*2 r 3m m. N f o oi t
~ Efy >
g x
!"e
- ga nr c? E on no s
@ g{_ g f
,u T-l E '
M Tm i t D
wl ai rF
,c 9
- Mv I t l
i 9' Q'" en E
T R(
Rs i t a a; sn d 7iI l l l r jl i
.l g [ nlf l '
A -
UnA oo 4H pi o
Tm
= " mt oa c - WF Cl
, i l i i t 9- _q - _ - cn i e f V
- 7> T- -- 1 ry,,,, ,
, fy
- y (g
aa o
t en
)
1 t pn me i m S n 7& ,_ " i
< a g_ ( r.
l = m ,u t
n g r
- o cs
> h g G @mc C g _ '" @
c "" h
=
- - i yvy- '
g _,
{
,S f 3$
c b <~
7 4c,- 7'- - =
1x m - &=
m
N E N
cg UR PO
=
I mm -
TSS ME T
CR MP v y- -
\p J.$us 7 9.J_
~ i
_ y; -
r=4 =
s _ : :
C j !, ) l l\ l ll l l'
- s. .
UFC CONCERNS REGARDING THE ADE0l!ACY OF THE-CONTAINMENT COOLING SYSTEM 0 STATEMENT OF THE CONCERN 0 SPECIAL' TEST WILL CONFIRM THE ADEQUACY OF THE CONTAINMENT COOLING SYSTEM 0 DESCRIPTION OF THE SPECIAL TEST WITH PURGE ISOLATED PARAMETERS TO BE MONITORED TEMPERATURE RELATIVE HUMIDITY CONTAINMENT PRESSURE OXYGEN LEVEL EXPLOSIVE GASES PARTICULATE ISOTOPES GASEOUS ISOTOPES TEST DURATION OF AT LEAST 30 DAYS ACCESS WILL BE MONITORED IN ACCORDANCE WITH THE CYCLE 2 CONTAINMENT PURGE MONITORING PROGRAM 0 DURING THE TEST, KEY AIR QUALITY PARAf1ETERS WILL BE EVALUATED TO ASSURE NO HAZARDS TO PERSONNEL ENTERING THE CONTAINMENT.
THE PURGE MAY BE INITIATED AT ANY TIME THAT AIR QUALITY APPROACHES FRE-SPECIFIED' LIMITS, O A REPORT OF THE TEST RESULTS WILL BE SUBMITTED WITHIN 60 DAYS OF COMPLETION OF THE TEST. THE TEST REPORT WILL ADDRESS:
TEMPERATURE AND RELATIVE HUMIDITY TRENDS DURING THE TEST PERIOD USE OF THE LVP DURING THE TEST PERIOD (IF REQUIRED)
ADJUSTMENTS TO THE CYCLE 2 CONTAINMENT PURGE MONITORING PROGRAM (IF REQUIRED)
O SCHEDULE FOR TEST J16 AGENDA 87020301 - 5 7
.. e a'
9 CYCLE'2 CONTAINMENT PURGE MONITORING PROGRAM /USE OF PURGE O PURPOSE OF THE PROGRAM GATHEP DATA TO EVALUATE THE LONG TERM NEED FOR CONTAINMENT PURGE DURING OPERATION O MONITORED AIR QUALITY PARAMETERS OXYGEN EXPLOSIVE LIMITS PARTICULATE ISOTOPES GASEOUS ISOTOPES 0 CRITERIA FOR THE USE OF THE PURGE DURING OPERATION LVP WILL EE USED ONLY TO MAINTAIN AIR QUALITY WITHIN ESTABLISHED GUIDELINES.
O USE BASED ON THRESHOLDS 0 SPECIAL CONDITIONS (EXPECTED TO BE RARE)
HVP WILL BE CONTROLLED IN ACCORDANCE WITH TECH SPECS.
O IMPROVED CONTAINMENT ACCESS MONITORING PROGRAM SECURITY SOFTWARE MODIFICATIONS ARE NOW COMPLETE ACCESS TO CONTAINMENT IS MONITOPED CONTINUOUSLY - RECORDS ARE MAINTAINED AS TO INDIVIDUALS NAME, DISCIPLINE AND TIME
. SPENT IN CONTAINMENT.
SAMPLE PRINTOUT OF CONTAINMENT ACCESS REPOPT 0 REPORT WILL BE SUBMITTED PRIOR TO RESTART FROM RF02.
,- DETAIL OF CYCLE 2 DATA RECOMMENDATIONS FOR USE OF LVP FOR CYCLE 3 J16 AGENDA 87020301 - 6 2f
,.y < o .
Part 20 maximum pemissible concentration (MPC) at the end of the first fuel cycle). Presently, the containment air is about 8% MPC. The need for a continuous purge for access has not been demonstrated in the first fuel cycle.
From ALARA considerations, 25% MPC is selected as a reasonable limit for
-access.
The licensee proposed a program to obtain additional data regarding the need to purge during the second fuel cycle (See Sheets 7 and 8 of Enclosure 1). To resolve the concern that purging not be used to control temperature and humidity, the licensee proposed a 30_ day test in which the purge sytem would be isolated.
Parameters to be measured would include temperature, relative humidity, pressure and air radioactivity. If radioactivity reaches 25% MPC, purging for access would be initiated. The test is planned to be run in February and March. To resolve the concern for adequate data regarding need for access, containment access will be monitored (individual's name, discipline, and time spent in containment) during the second fuel cycle. - The security computer monitoring program has been modified to obtain needed data. The purge systems will be isolated unless containment air radioactivity reaches 25% MPC.
SERI will send NRC a letter within a few weeks summarizing the test monitoring program described in this meeting and provide a commitment to document the methodology used to determine the annual purging time limits for Grand Gulf' after the second fuel cycle.
N Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing Enclosure (s):
As stated ccw/ enclosure (s):
See next page-D STRIBUTION I
- R M NRC PDR LPDR PDf4 Reading
, WButler i LKintner/BSiegel JUnda M0'Brien Young, OGC EJordan
-BGrimes ACRS(10) ]
l PDI4/D PDI4/ Jkib)
LLKintner:ca ' Jund WButler W
)/)/87 3 /s /87 p y /87