ML20212N322

From kanterella
Revision as of 15:51, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 870202 Meeting W/Saxton Nuclear Experimental Corp in King of Prussia,Pa to Discuss Installation of Sump Pump in Radwaste Decontamination Facility Basement & long- Term Water Sampling & Discharge Activities
ML20212N322
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 01/28/1987
From: Elsasser T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20212N235 List:
References
NUDOCS 8703120445
Download: ML20212N322 (5)


Text

- _ _ - _ _ _ _ - _ _ - _ _ _ _ __ ____ - ____ _ - _ _ _ _ _ _ _ _ _ _ - . _

ENCLOSURE 1 J P 2 0 1997 U.5. NUCLEAR REGULATORY COMMISSION No.87-017 REGION I Licensee: Saxton Nuclear Experimental Corporation Facility: Saxton Nuclear Experimental Facility Docket No.: 50-146 Time and Date: 9:00 a.m., February 2, 1987 Location: Region I Office, King of Prussia, PA (Executive Conference Room)

Purpose:

To Discuss Installation of a Sump Pump in the Radwaste Decon-tamination Facility Basement and Long Term Water Sampling and Discharge Activities NRC Attendees: T. Elsasser, Chief, Reactor Projects Section 3C, Division of Reactor Projects (DRP)

M. Shanbaky, Chief, Facilities Radiation Protection Section, Division of Radiation Safety and Safeguards (DRSS)

D. Haverkamp, Project Engineer, DRP A. Weadock, Radiation Specialist, DRSS Licensee Attendees: R. McGoey, Manager, PWR Licensing J. Auger, Licensing Engineer Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., January 30, 1987 via telephone call to D. Haver mp, Region I, at FTS 8-488-1120.

Prepared by M T. C. r, Chief, RPS 3C Distribution:

Victor Stello, Jr. , Executive Director for Operations James Sniezek, Deputy Executive Director for Regional Operations and Generic

, Requirements James M. Taylor, Director, Office of Inspection and Enforcement l James G. Partlow, Director, Division of Inspection Programs, IE l Jane Axelrad, Director, Enforcement Staff, IE

) J. Lieberman, Assistant General Counsel for Enforcement, Office of the General Counsel R. Carter, Project Manager, NRR F. Mirgalia, Director, Division of PWR Licensing-B, NRR H. Berkow, Director, Special and Standardization Projects, NRR Public Document Room (PDR) local Public Document Room (LPDR) 0703120445 870305 PDR ADOCK 05000146 P PDR

.A. .'*.-

(

ENCLOSURE 2 NRC/ LICENSEE MEETING ON FEBRUARY 2, 1987 MEETING ATTENDEES GPU Nuclear Corporation

  • R.' McGoey, Manager, PWR Licensing J. Auger, PWR Licensing Engineer
  • In behalf of Saxton Nuclear Experimental Corporation .

Nuclear Regulatory Commission W. Baunack, Project Engineer, Division of Reactor Projects (DRP)

D. Haverkamp, Project Engineer, DRP R. Bores, Technical Assistant, Division of Radiation Safety and Safeguards (DRSS)

M. Shanbaky, Chief, Facilities Radiation Protection Section, DRSS W. Pasciak, Chief, Effluents Radiation Protection Section, DRSS A..Weadock, Radiation Specialist, DRSS l

l l

l

=

ENCLOSURE 3 BRIEFING ON SAXTON NUCLEAR FACILITY STATUS FEBRUARY 2, 1987 AGENDA

1. INTRODUCTION II. RADI0 ACTIVE WASTE DISPOSAL FACILITY (RWDF) AND PIPE TUNNEL DEWATERING STATUS.

A. Original Groundwater Removal Status B. Specifics on Ground Water Released C. Inleakage of Groundwater III. RWDF BASEMENT RADIOLOGICAL SURVEY RESULTS A. General Configuration / Condition of Basement B. Fixed Contamination C. Loose Surface Contamination IV.

SUMMARY

OF INFORMATION GAINED FROM EFFORTS V. FUTURE EFFORTS AT SAXTON A. Routine Maintenance / Decontamination / Surveys B. Dismantlement of Outbuildings C. Corrosion Study of Containment Vessel D. Status of PA PUC Controlled Trust Funds for Saxton Decommissioning l

1 i

18819

an 'o

? '

E CHLORINATION g PUMPHOUSE ENCE X X X X X x x x x x . x x

(

SAFETY INJECTION

./ REFUELING TANK

[  :(

\ l

< > 0 NV/ ,,
< CONTAINMENT VESSEL  :(

, , g ( PIPE TUNNEL

> I_'  :<

(

l -

RAD WASTE DISPOSAL FACILITY  :(

CONTROL & AUX. -

DEWATERING BUILDING _ SYSTEM

(

Y' 7 -_ -

m _

\

FILLED DRUM STORAGE i

~

V V y y y ,,

SITE LAYOUT / FACILITY

4 w

  • M 2

n d M E N E<g

. o

'E; L -- -

1 5 .1 l 7* a=--sa .r . ., p 7 i M a o. 1

,' l 111l. -

= u - ., . ., s ,

e g

, I A 't-

{ T I

, 1,

~

= a

~M 1 L 2,

j _==e, y ass v -

E ke l

b ,l" J

=

I"h hk gU*

  • a 2 = c a 4 l

=

  • $$h C h 0] l_ .s ,

8 4A8 O b

.--. - -- - - -.-_- --__ - . - . .