Finding | |
---|---|
Title | Failure to Meet GL 89-13 Program for Mussel Control |
Description | The inspectors identified a finding of very low safety significance for the failure to meet a commitment made in the Generic Letter (GL) 89-13 program. Specifically, the program states that biocide treatments at Point Beach are performed at least annually and are directly applied to the service water system for mussel control and eradication to prevent fouling of safety-related heat exchangers. However, the 2008 biocide treatment for mussel control was deferred until 2009. After the treatment in 2009, greater than expected tube blockage and reduced flow to safety-related heat exchangers due to mussels was identified. In response, the licensee adjusted flow through the affected heat exchangers and opened and cleaned the heat exchangers to remove mussels that caused the tube blockage. The licensee took corrective actions to ensure that future annual biocide treatments would be conducted annually. This finding was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the associated cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Phase 1 Initial Screening and Characterization of Findings, Table 4a, for the Mitigating Systems Cornerstone, dated January 10, 2008. The finding was determined to be of very low safety significance because the issue did not result in the actual loss of a safety function. This finding did not involve a violation of NRC regulatory requirements. The inspectors determined this performance deficiency was not indicative of current performance; therefore, no cross-cutting aspect was identified. (Section 1R12.1 |
Site: | Point Beach |
---|---|
Report | IR 05000266/2009005 Section 1R12 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | Finding: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | D Jones D Mcneil E Sanchez Santiago J Cassidy J Gilliam J Jandovitz M Kunowski M Thorpe Kavanaugh N Feliz Adorno R Edwards R Jickling R Ruiz S Burton |
INPO aspect | |
' | |
Finding - Point Beach - IR 05000266/2009005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|