ML20207S091

From kanterella
Revision as of 23:42, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Repts for Oct 1986
ML20207S091
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 10/31/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207S076 List:
References
NUDOCS 8703180517
Download: ML20207S091 (2)


Text

, . . . ~ . - .

REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: OCTOBER 1986
3. LICENSED THERMAL POWER (MNT): ______________ 2700

_4. NAMEPLATE RATING (GROSS MWE): ______________ 850

5. DESIGN ELECTRICAL RATING (NET MWE): ________ 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE): ___ 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____ 839
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS: ________________________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONSe IF ANY: _______________________________________

_____________________________________L___________________________________

. MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _________________ 745 7296 86448.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745 0 6960.0 l 63108.7
13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE _________________ 745.0 6889.6 62691.7
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1998087 18400074 159292341
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 657650 6130430 52186935
18. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 624337 5819335 49253127
19. UNIT SERVICE FACTOR _____________________ 100.0 94.4 72.5
20. UNIT AVAILABILITY FACTOR ________________ 100.0 94.4 72 6 l

! 21. CAPACITY FACTOR (USING MDC NET) _________ 99.9 96.2 l 71.3 69.9

22. CAPACITY FACTOR (USING DER NET) _________ 101.0 96.1
23. UNIT FORCED OUTAGE RATE _________________ 0 1.3 4.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/21/86, 8 WEEKS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

8703180517 870316

PDR ADOCKOSOOOggO R

. o.

REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389.

DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAMEt ST. LUCIE . UNIT 2
2. REPORTING PERID0! OCTOBER 1986
3. LICENSED THERMAL POWER (MWT)* ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)! ______________ 854
5. DESIGN ELECTRICAL RATING (NET MWE)* ________ 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! ___ 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! _ _ . , _ _ 839
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERID0! _________________ 745 7296 29345 9 I 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745 0 5862.7 23911 6
13. REACTOR RESERVE SHUTDOWN HOURS __________ 6.0 0.0 0.0

, 14. HOURS GENERATOR ON-LINE _________________ 745.0 5791.5 23363 8 '

15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 0 l 16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1994252 15450637 60097170
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 645239 5164670 20071350 i
18. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 631452 4890223 18961266 i 19. UNIT SERVICE FACTOR _____________________ 100 0 79.4 82 4 l
20. UNIT AVAILABILITY FACTOR ________________ 100.0 79.4 82 4
21. CAPACITY FACTOR (USING MDC NET) _________ 101.0 80.0 l 82.5l
22. CAPACITY FACTOR (USING DER NET) _________ 102.1 80.8 81 9
23. UNIT FORCED OUTAGE RATE _________________ e 1.3 86 l 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS * ,

i

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt ________

i

(

-_ _ - _ . . _ . _ _ _ _ _ _ _ _ - . _ . _ . _ _ _ . _ _ , _ _ _ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ . . - . . _