REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD: OCTOBER 1986
3. LICENSED THERMAL POWER (MNT):

2700

_4.

NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONSe IF ANY:

_____________________________________L___________________________________

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

745 7296 86448.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

745 0 6960.0 l 63108.7

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

745.0 6889.6 62691.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935
18. NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127
19. UNIT SERVICE FACTOR _____________________

100.0 94.4 72.5 l

20. UNIT AVAILABILITY FACTOR ________________

100.0 94.4 72 6

21. CAPACITY FACTOR (USING MDC NET) 99.9 96.2 l 71.3
22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9
23. UNIT FORCED OUTAGE RATE _________________

0 1.3 4.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/21/86, 8 WEEKS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8703180517 870316 ADOCKOSOOOggO PDR R

o.

REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389.

DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAMEt ST. LUCIE.

UNIT 2

2. REPORTING PERID0! OCTOBER 1986
3. LICENSED THERMAL POWER (MWT)* ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)! ______________

854

5. DESIGN ELECTRICAL RATING (NET MWE)*

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERID0! _________________

745 7296 29345 9 I

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

745 0 5862.7 23911 6

13. REACTOR RESERVE SHUTDOWN HOURS __________

6.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

745.0 5791.5 23363 8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

0 l

16. GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 645239 5164670 20071350
18. NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 i

i

19. UNIT SERVICE FACTOR _____________________

100 0 79.4 82 4 l

20. UNIT AVAILABILITY FACTOR ________________

100.0 79.4 82 4

21. CAPACITY FACTOR (USING MDC NET) 101.0 80.0 l 82.5l
22. CAPACITY FACTOR (USING DER NET) 102.1 80.8 81 9
23. UNIT FORCED OUTAGE RATE _________________

e 1.3 86

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS
  • l i
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i

(

.. -..