ML20207S094

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Repts for Nov 1986
ML20207S094
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 11/30/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207S076 List:
References
NUDOCS 8703180521
Download: ML20207S094 (2)


Text

_ _ ___.

REVISED COPY OPERATING DATA REPORT DOCNET NO 50 - 335 DATE 12/11/84 COMPLETED BY N. W. GRANT TELEPHONE 305/494/4432 OPERATING STATUS

1. UNIT NAME!

ST. LUCIE UNIT 1

2. REPORTING PERIODINOVEMBER 1984
3. LICENSED THERMAL POWER (MWT)! ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)*

854

5. DESIGN ELECTRICAL RATING (NET MWE)! ________

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)*

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!

839

3. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) k SINCE LAST REPORT, GIVE REASONSt ___________________..___________________
  • 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

'10. REASONS FOR RESTRICTIONSe IF ANY!..___.._______________________. ______

MONTHLY

-YTO-CUMULATIVE

11. HOURS IN REPORT PERIODI 720 Stie 87168.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

720.0 7680.0 l 63828 7

13. REACTOR RESERVE SHUTDOWN HOURS __________

00 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

720.0 7409.6 63411.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1933003 20333077 161225344
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 634510 6744940 52823445
18. NET ELECTRICAL ENERGY GENERATED (MWH) 444271 6423404 49857398
19. UNIT SERVICE FACTOR _____________________

100.0 94.9 72.7

20. UNIT AVAILASILITY FACTOR _______.___..___

100 0 94.9 72.8

21. CAPACITY FACTOR (USING MOC NET) 100.0 96.5 l 71.4
22. CAPACITY FACTOR (USING DER NET) 101.1 94.5 70.1
23. UNI.T FORCED OUTAGE RATE....____________.

6 1.2 4.0

24. SHUTOOWNS SCHEDULED OVER NEXT 4 MONTHS 1 REFUELING 2/14/97, 63 DAYS _____________________________________________
25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUPt ________

8703180521 B70316 PDR ADOCK 05000250 R

PDR

REVISED COPY OPERATING DATA REPORT 00CNET NO 50 - 389 DATE 12/11/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME!

ST. LUCIE UNIT 2

2. REPORTING PERID0! NOVEMBER 1984
3. LICENSED THERMAL POWER (MWT)* ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)!

850 l

5. DESIGN ELECTRICAL RATING (NET MWE)*

830 6.-MAXIMUM DEPENDASLE CAPACITY (GROSS MWE)*

882

[

7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE)t ____.

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUNSER 3 THROUGH 7)

SINCE LAST REPORTe GIVE REASONSt ___________________ ____________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)._______________________

l

10. REASONS FOR RESTRICTIONS, IF ANYt _______________________________________

l r

MONTHLY

-YTO-CUMULATIVE I

l l

11. HOURS IN REPORT PERIOO! _________________

720 8016 29065 0 l

l

12. NUMBER OF HOURS REACTOR WAS CRITICAL.___

720.0 4582.7 24631.4

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

720.0 4511.5 24083.8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1934474 17387313 62033844
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 449530 5814200 20720880
18. NET ELECTRICAL ENERGY GENERATED (MWH) 414873 5507096 19578139
19. UNIT SERVICE FACTOR _____________________

100.0 8l1. 2 82.9

20. UNIT AVAILASILITY FACTOR ________________

100 0 81.2 82 9 l,

21. CAPACITY FACTOR (USING MDC NET) 102 1 82.0 l

83.0

22. CAPACITY FACTOR (USING DER NET) 103.2 82 8 82 4
23. UNIT FORCED OUTAGE RATE _________________

0 11 8.4

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS !
25. IF SHUT DOWN AT END OF REPORT PERID0e ESTIMATED DATE OF STARTUP!

-......- --.. - - -