ML20207S103

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Repts for Dec 1986
ML20207S103
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207S076 List:
References
NUDOCS 8703180531
Download: ML20207S103 (2)


Text

,.

l REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERAT.ING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD: DECEMBER 1986
3. LICENSED THERMAL' POWER (MWT): ______________ 2700
4. NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 8760 87912.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

744.0 8424.0l 64572.7

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

744.0 8353 6 64155.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

14. GROSS THERMAL ENERGY GENERATED (MWH) 1993847 22326924 163219191
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 461700 7428640 53485145
18. NET ELECTRICAL ENERGY GENERATED (MWH) 628425 7052031 50485823
19. UNIT SERVICE FACTOR _____________________

100.0 95.4 73.0 73.0 l

20. UNIT AVAILABILITY FACTOR ________________

100.0 95.4

21. CAPACITY FACTOR (USING MDC NET) 100.7 96.9 l 71.8
22. CAPACITY FACTOR (USING DER NET) 101.8 97.0 70.4
23. UNIT FORCED OUTAGE RATE _________________

0 1.1 4.0

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS :

REFUELING 2/7/87, 63 DAYS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:

8703180531 B70316 PDR ADOCK 05000250 R

PDR

o.

REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/13/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME!

ST. LUCIE UNIT 2

2. REPORTING PERIODtDECEMBER 1986
3. LICENSED THERMAL POWER (MWT)! ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)! ______________

850

5. DESIGN ELECTRICAL RATING (NET MWE)! ________

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!

882

7. MAXIMUM DEPENOABLE CAPACITY (NET MWE)*

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTe GIVE REASONS!

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

4

10. REASONS FOR RESTRICTIONSe IF ANY l

MONTHLY

-YTD-CUMULATIVE i

11. HOURS IN REPORT PERIOO! _________________

744 8760 29809.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

744.0 7326.7 25375.6

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

744.0 7255.5 24827.8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) 2004055 19391368 64037901
17. GROSS ELEC.TRICAL ENERGY GERERATED (MWH) 673270 6487470 21394150
18. NET ELECTRICAL ENERGY GENERATED (MWH) 639445 4146561 20217604
19. UNIT SERVICE FACTOR _____________________

100.0 82.8 83.3

20. UNIT AVAILABILITY FACTOR ________________

100.0 82.8 83.3

21. CAPACITY FACTOR (USING MDC NET) 102.4 83.8 l

83.5

22. CAPACITY FACTOR (USING DER NET) 103.6 84.5 83 0
23. UNIT FORCED OUTAGE RATE _________________

0 1.0 8.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:

i i

-