Corrected Monthly Operating Repts for Sept 1986
ML20207S086
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/30/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207S076 List:
References
NUDOCS 8703180510
Download: ML20207S086 (2)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _.

REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305,694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD SETEMBER 1986
3. LICENSED THERMAL POWER (MWT)*

2700

4. NAMEPLATE RATING (GROSS MWE)*

850 5.' DESIGN ELECTRICAL RATING (NET MWE)!

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)*

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS!

FOR ITEN 7. MDC RAISED 9/29/86 DUE TO INCREASED EFFICIENCY.

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIODt 720 6551 85703.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

703.7 6215.0 62371.0

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

664.8 6144.6 61946.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1722036 16401987 157294254
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 564480 5472780 51529285
18. NET ELECTRICAL ENERGY GENERATED (MWH) 533532 5194998 48628790
19. UNIT SERVICE FACTOR _____________________

92.3 93.8 72.3

20. UNIT AVAILABILITY FACTOR ________________

92.3 93.8 72.3

21. CAPACITY FACTOR (USING MDC NET) 88,3 l

95.7 l

71 1

22. CAPACITY FACTOR (USING DER NET) 89.3 95.5 69.6
23. UNIT FORCED OUTAGE RATE _________________

7.7 1.5 4.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP!

0703180510 870316 ADOCK03OOOg0 DR

_~

c.

REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME!

ST. LUCIE UNIT 2

2. REPORTING PERIOD!SETEMBER 1986
3. LICENSED THERMAL POWER (MWT)! ______________ 2700
4. NAMEPLATE RATING (GROSS MWE) 850
5. DESIGN ELECTRICAL RATING (NET MWE)*

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)*

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! ____.

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTe GIVE REASONS!

FOR ITEM 7, MDC RAISED 9/29/86 DUE TO INCREASED EFFICIENCY.

i

9. PO'4ER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________
10. REASONS FOR RESTRICTIONSe IF ANY!

l MONTHLY

-YTD-CUMULATIVE i

11. HOURS IN REPORT PERIODt 726 4551 27600.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

712.4 5117.7 23166.6 l

13. REACTOR RESERVE SHUTDOWN HOURS -______-__

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________--______

698.4 5046.5 22618.8

15. UNIT RESERVE SHUTDOWN HOURS ____-________

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1870405 13454385 58102918
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 620240 4499440 19406120
18. NET ELECTRICAL ENERGY GENERATED (MWH) 587987 4258771 18329814
19. UNIT SERVICE FACTOR _____________________

97.0 77.0 82.0

20. UNIT AVAILABILITY FACTOR ________________

97.0 77.0 82.0

21. CAPACITY FACTOR (USING MDC NET) 97.3 77.7 l 82.0 l'
22. CAPACITY FACTOR (USING DER NET) 98.4 78.3 81.4
23. UNIT FORCED OUTAGE RATE ____________-____

3.0 1.5 8.9

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP!