MONTHYEARML20217E0371999-09-30030 September 1999 Application for Amend to License NPF-57,supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10.Proprietary & non-proprietary Info Re Subject Amend,Encl. Proprietary Info Withheld,Per 10CFR2.790(a)(4) LR-N990357, Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool1999-08-26026 August 1999 Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML20195B5461999-05-24024 May 1999 Application for Amend to License NPF-57,correcting Typos & Editorial Errors Contained in Ts.Corrections Are Considered to Be Administrative in Nature LR-N990137, Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,20001999-05-17017 May 1999 Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,2000 ML20206G0651999-03-29029 March 1999 Redistributed Application for Amend to License NPF-57, Incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements.Rev 18 to ODCM Also Encl ML20205E7931999-03-29029 March 1999 Application for Amend to License NPF-57,incorporating Programmatic Controls in TS for Radioactive Effluents & Environ Monitoring,Conforming to Applicable Regulatory Requirements ML20198T0131998-12-30030 December 1998 Application for Amend to License NPF-57,proposing Rev to Flood Protection TS LCO & Associated Action Statements ML20198N3901998-12-28028 December 1998 Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept1998-12-16016 December 1998 Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept ML20155D3441998-10-22022 October 1998 Application for Amend to License NPF-57,to Revise TS to Establish More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5821998-10-19019 October 1998 Application for Amend to License NPF-57,eliminating Restrictions Imposed by TS 3.0.4 for Filtration, Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N980363, Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries1998-09-0808 September 1998 Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4301998-08-25025 August 1998 Application for Amend to License NPF-57,implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs.Proprietary & non-proprietary Description of Revs to TS Encl.Proprietary Info Withheld ML20236F1121998-06-25025 June 1998 Application for Amend to License NPF-57,deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8101998-06-12012 June 1998 Application for Amend to License NPF-57,providing Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintaining Ultimate Heat Sink Operation within Design.Engineering Analyses Also Encl ML20247K7301998-05-13013 May 1998 Application for Amend to License NPF-57,revising TS Inservice Leak & Hydrostatic Testing Requirements.Review Is Requested by 981220,to Support Next Refueling Outage ML20217P9221998-04-28028 April 1998 Application for Amend to License NPF-57,revising TS 3/4.4.2 by Implementing More Appropriate SRV Setpoints.Proprietary GE TR NEDC-32511P, Safety Review for Hope Creek SRV Tolerance Analysis, Encl.Proprietary Info Withheld LR-N970670, Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 19891997-12-19019 December 1997 Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 1989 LR-N970622, Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated1997-09-29029 September 1997 Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated LR-N970618, Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves1997-09-24024 September 1997 Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves ML20211M2571997-08-26026 August 1997 Sanitized Supplement to 970331 & 970716 Applications for Amend to License NPF-57,revising Ts.Addl Info & Revised TS Bases Pages Associated W/Amend 101 ML20217Q6641997-08-26026 August 1997 Application for Amend to License NPF-57,requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20210P3341997-08-20020 August 1997 Application for Amend to License NPF-57,deleting References to Plants Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage,Per NRC Bulletin 96-003 ML20211M2451997-07-16016 July 1997 Sanitized Version of Supplement to 970331 Application for Amend to License NPF-57,revising TS & Providing Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8) ML20149G4271997-07-16016 July 1997 Supplements Application for Amend to License NPF-57, Submitted 970331.Supplement Provides Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8).TSs & Proprietary Info Re SLMCPR Changes,Encl.Proprietary Info,Withheld LR-N970217, Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10%1997-06-19019 June 1997 Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20141G8221997-05-19019 May 1997 Application for Amend to License NPF-57,revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Related Issues Documented in Hope Creek Corrective Action Program ML20140F0261997-04-30030 April 1997 Application for Transfer of Control Re Operating License NPF-57 for Hcngs.Joint Proxy Statement/Prospectus Describing Details of Util Agreement & Plant of Merger W/Delmarva Power & Light Co,Encl LR-N970183, Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J1997-04-0101 April 1997 Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20137M5811997-03-31031 March 1997 Application for Amend to License NPF-57,representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1. Info Re Safety Limit Min Critical Power Ratio Changes Encl. Info Withheld ML20135E8041997-03-0303 March 1997 Application for Amend to License NPF-57,changing TS 3/4.3.1, Reactor Protection Sys Instrumentation, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.3.3, Emergency Core Cooling Sys Actuation Instrumentation ML20134M0771997-02-11011 February 1997 Application for Amend to License NPF-57,requesting Rev to 3/4.8 Re Electrical Power Systems for Improvements to EDG ML20134B5441997-01-24024 January 1997 Application for Amend to License NPF-57,changing TS 3.1.5, Control Rod Scram Accumulators ML20134F4231996-10-25025 October 1996 Application for Amend to License NPF-57,requesting Rev to 3.1.3.5 Re Control Rod Scram Accumulators ML20117K1231996-08-30030 August 1996 Application for Amend to License NPF-57,changing FSAR Decoupling SSE from LOCA ML18102A2541996-07-12012 July 1996 Suppls to Application for Amend to Licenses DPR-70,DPR-75 & NPF-57 Re Qualifications of Operations Manager ML20100R0841996-03-0606 March 1996 Application for Amend to License NPF-57,revising Diesel Fuel Oil Storage & Transfer Requirements ML18101B2501996-02-26026 February 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant ML20097C5671996-02-0505 February 1996 Application for Amend to License NPF-57,revising SR 4.6.2.2.b & 4.6.2.3.b to Include Flow Through RHR Heat Exchanger Bypass Line in SPC & Suppression Pool Spray Flow Path Used During RHR Pump Testing ML18101B1751996-01-11011 January 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls & Replacing Specific Mgt Titles W/Generic Mgt Functional Positions ML20099L6571995-12-28028 December 1995 Application for Amend to License NPF-57,revising TS Definition 1.4 Re Channel Calibr to Ensure Required Testing Methodology Aligns W/Std Industry Methodology for Instrument Channels Having T/C or RTD as Sensor ML20098D0011995-10-0707 October 1995 Application for Amend to License NPF-57,revising SR 4.8.1.1.2 Re Testing of EDGs to Be Consistent W/Applicable Licensing Documents Used for Development of EDG Surveillance ML20086T6991995-07-27027 July 1995 Application for Amend to License NPF-57,revising Ts,By Incorporating Updated Pressure Vs Temperature Operating Limit Curves Contained in TS Figure 3.4.6.1-1 ML20083B9591995-05-0404 May 1995 Application for Amend to App a of License NPF-57,increasing Annual Operational Limit for Drywell & Suppression Chamber Purge Sys from 120 H to 500 H ML20082T3351995-04-18018 April 1995 Application for Amend to License NPF-57,revising TS Table 4.3.7.1-1, Radiation Monitoring Instrumentation SRs by Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument ML20082C1171995-03-30030 March 1995 Application for Amend to License NPF-57 for Hope Creek Generating Station.Amend Would Eliminate Selected Response Time Testing Requirements from TS & Associated Bases Changes ML20078C8351995-01-20020 January 1995 Application for Amend to License NPF-57,to Remove Specification from TSs & Relocates Bases to Plant UFSAR & Surveillance Requirements to Applicable Surveillance Procedures ML20078C8141995-01-20020 January 1995 Application for Amend to License NPF-57,to Revise Surveillance Requirement 4.1.3.1.2.b Re CR Immovable as Result of Excessive Friction or Mechanical Interference 1999-09-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217E0371999-09-30030 September 1999 Application for Amend to License NPF-57,supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10.Proprietary & non-proprietary Info Re Subject Amend,Encl. Proprietary Info Withheld,Per 10CFR2.790(a)(4) ML20211N5471999-09-0808 September 1999 Amend 121 to License NPF-57 Revising TSs by Locating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990357, Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool1999-08-26026 August 1999 Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML20195B5461999-05-24024 May 1999 Application for Amend to License NPF-57,correcting Typos & Editorial Errors Contained in Ts.Corrections Are Considered to Be Administrative in Nature LR-N990137, Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,20001999-05-17017 May 1999 Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,2000 ML20205E7931999-03-29029 March 1999 Application for Amend to License NPF-57,incorporating Programmatic Controls in TS for Radioactive Effluents & Environ Monitoring,Conforming to Applicable Regulatory Requirements ML20206G0651999-03-29029 March 1999 Redistributed Application for Amend to License NPF-57, Incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements.Rev 18 to ODCM Also Encl ML20198T0131998-12-30030 December 1998 Application for Amend to License NPF-57,proposing Rev to Flood Protection TS LCO & Associated Action Statements ML20198N3901998-12-28028 December 1998 Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept1998-12-16016 December 1998 Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept ML20155D3441998-10-22022 October 1998 Application for Amend to License NPF-57,to Revise TS to Establish More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5821998-10-19019 October 1998 Application for Amend to License NPF-57,eliminating Restrictions Imposed by TS 3.0.4 for Filtration, Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N980363, Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries1998-09-0808 September 1998 Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4301998-08-25025 August 1998 Application for Amend to License NPF-57,implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs.Proprietary & non-proprietary Description of Revs to TS Encl.Proprietary Info Withheld ML20236F1121998-06-25025 June 1998 Application for Amend to License NPF-57,deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8101998-06-12012 June 1998 Application for Amend to License NPF-57,providing Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintaining Ultimate Heat Sink Operation within Design.Engineering Analyses Also Encl ML20247K7301998-05-13013 May 1998 Application for Amend to License NPF-57,revising TS Inservice Leak & Hydrostatic Testing Requirements.Review Is Requested by 981220,to Support Next Refueling Outage ML20217P9221998-04-28028 April 1998 Application for Amend to License NPF-57,revising TS 3/4.4.2 by Implementing More Appropriate SRV Setpoints.Proprietary GE TR NEDC-32511P, Safety Review for Hope Creek SRV Tolerance Analysis, Encl.Proprietary Info Withheld LR-N970670, Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 19891997-12-19019 December 1997 Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 1989 ML20199C1411997-11-0606 November 1997 Amend 108 to License NPF-57,changes TS 3/4.11.1, Liquid Effluent-Concentration. Change Adds Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Station Service Water Sys LR-N970622, Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated1997-09-29029 September 1997 Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated LR-N970618, Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves1997-09-24024 September 1997 Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves ML20217Q6641997-08-26026 August 1997 Application for Amend to License NPF-57,requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2571997-08-26026 August 1997 Sanitized Supplement to 970331 & 970716 Applications for Amend to License NPF-57,revising Ts.Addl Info & Revised TS Bases Pages Associated W/Amend 101 ML20210P3341997-08-20020 August 1997 Application for Amend to License NPF-57,deleting References to Plants Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage,Per NRC Bulletin 96-003 ML20149G4271997-07-16016 July 1997 Supplements Application for Amend to License NPF-57, Submitted 970331.Supplement Provides Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8).TSs & Proprietary Info Re SLMCPR Changes,Encl.Proprietary Info,Withheld ML20211M2451997-07-16016 July 1997 Sanitized Version of Supplement to 970331 Application for Amend to License NPF-57,revising TS & Providing Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8) LR-N970217, Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10%1997-06-19019 June 1997 Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20141G8221997-05-19019 May 1997 Application for Amend to License NPF-57,revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Related Issues Documented in Hope Creek Corrective Action Program ML20140F0261997-04-30030 April 1997 Application for Transfer of Control Re Operating License NPF-57 for Hcngs.Joint Proxy Statement/Prospectus Describing Details of Util Agreement & Plant of Merger W/Delmarva Power & Light Co,Encl LR-N970183, Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J1997-04-0101 April 1997 Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20137M5811997-03-31031 March 1997 Application for Amend to License NPF-57,representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1. Info Re Safety Limit Min Critical Power Ratio Changes Encl. Info Withheld ML20135E8041997-03-0303 March 1997 Application for Amend to License NPF-57,changing TS 3/4.3.1, Reactor Protection Sys Instrumentation, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.3.3, Emergency Core Cooling Sys Actuation Instrumentation ML20134M0771997-02-11011 February 1997 Application for Amend to License NPF-57,requesting Rev to 3/4.8 Re Electrical Power Systems for Improvements to EDG ML20134B5441997-01-24024 January 1997 Application for Amend to License NPF-57,changing TS 3.1.5, Control Rod Scram Accumulators ML20134F4231996-10-25025 October 1996 Application for Amend to License NPF-57,requesting Rev to 3.1.3.5 Re Control Rod Scram Accumulators ML20117K1231996-08-30030 August 1996 Application for Amend to License NPF-57,changing FSAR Decoupling SSE from LOCA ML18102A2541996-07-12012 July 1996 Suppls to Application for Amend to Licenses DPR-70,DPR-75 & NPF-57 Re Qualifications of Operations Manager ML20100R0841996-03-0606 March 1996 Application for Amend to License NPF-57,revising Diesel Fuel Oil Storage & Transfer Requirements ML18101B2501996-02-26026 February 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant ML20097C5671996-02-0505 February 1996 Application for Amend to License NPF-57,revising SR 4.6.2.2.b & 4.6.2.3.b to Include Flow Through RHR Heat Exchanger Bypass Line in SPC & Suppression Pool Spray Flow Path Used During RHR Pump Testing ML18101B1751996-01-11011 January 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls & Replacing Specific Mgt Titles W/Generic Mgt Functional Positions ML20099L6571995-12-28028 December 1995 Application for Amend to License NPF-57,revising TS Definition 1.4 Re Channel Calibr to Ensure Required Testing Methodology Aligns W/Std Industry Methodology for Instrument Channels Having T/C or RTD as Sensor ML20098D0011995-10-0707 October 1995 Application for Amend to License NPF-57,revising SR 4.8.1.1.2 Re Testing of EDGs to Be Consistent W/Applicable Licensing Documents Used for Development of EDG Surveillance ML20086T6991995-07-27027 July 1995 Application for Amend to License NPF-57,revising Ts,By Incorporating Updated Pressure Vs Temperature Operating Limit Curves Contained in TS Figure 3.4.6.1-1 ML20083B9591995-05-0404 May 1995 Application for Amend to App a of License NPF-57,increasing Annual Operational Limit for Drywell & Suppression Chamber Purge Sys from 120 H to 500 H ML20082T3351995-04-18018 April 1995 Application for Amend to License NPF-57,revising TS Table 4.3.7.1-1, Radiation Monitoring Instrumentation SRs by Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument ML20082C1171995-03-30030 March 1995 Application for Amend to License NPF-57 for Hope Creek Generating Station.Amend Would Eliminate Selected Response Time Testing Requirements from TS & Associated Bases Changes 1999-09-08
[Table view] |
Text
_ _ _ _ _ _ _ - _ _
Pubhc Service Electric and Gas Company Steven E. Millenberger Public Service Electnc and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 3391100 vice rmioeni and CNe' Nackar 0%cer DEC 2 81920 NLR-N90237
Reference:
LCR 90-05 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
REQUEST FOR AMENDMENT FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) hereby transmits an application to amend Appendix A of Facility Operating License No. NPF-57 in accordance with 10CFR50.90. This amendment request would revise the Administrative Controls section of the Hope Creek Generating station (HCGS) Technical Specifications.
A description of the requested amendment, supporting information and analyses for the change, and the basis for a no significant hazards consideration determination are provided in Attachment 1.
The Technical Specification pages affected by the proposed change are marked-up in Attachment 2.
Upon NRC approval of this proposed change, PSE&G requests that the amendment be made effective on the date of issuance, but implementable within sixty days to provide sufficient time for associated procedural modifications.
Pursuant to the requirements of 10CFR50.91(b) (1) , PSE&G has provided a copy of this amendment request to the State of New Jersey.
00 r 9101080291 9o122g k\
hDR ADOCK 05000334 PDR UUJUA(
Document Control Desk UEC 2 8 1990 NLR-N90237 Should you have any questions regarding this request, we will be pleased to discuss them with you.
Sincerely,
, f b=kff g;g Attachments Af fidavi t C Mr. T. T. Martin, Administrator USNRC Region I Mr. S. Dembok USNRC Licensing Project Manager Mr. T. P. Johnson USNRC Senior Resident Inspector Mr. K. Tosch, Chief, Dureau of Nuclear Engineering Now Jersey Department of Environmental-Protection
n l
i Reft NLR-N90237 STATE OF NEW JERSEY .)
) SS.
COUNTY OF SALEM )
S. La Bruna, being duly sworn according to law deposes and says:
- I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated . DE C 2 8 1990 , concerning the Hope Creek-Generating Station, are true to the best of my knowledge,
.information and belief.
/
30 rY l+rz-r~
-Subscribed and Sworn to 53 fore me this d Y I day of Ieav,c/b>,1990
' l, -
(/ Al/fQv
, Notary PUblic of New Jersey DetausDHADOGN My' Commission expires'on we @ W NmJersey _
._ .aa,13eg .
i
4 Ref: LCR 90-05 ATTACilMENT 1 PROPOSED TECIINICAL SPECIFICATION CilANGE l
l
. .. ~ . -- --
.- ..- - ,. . ~. - . -
i *
~h(.
I
' PROPOSED CIIANGE- TO 'THB TECilNICAL SPECIFICATIONS FACILITY OPERATING LICENSE NPF-57 ilOPE CREEK' GENERATING STATION -l 5 _ DOCKET NO. 50-354 i ref: LCR 90-05
- pESCRIPTION OF TIIE CilANGE As shown' on the marked-up Technical Specifications -(TS) pages in Attachment 2, lPSE&G requests-that Adinistrative Controls, UNIT STAFF, Section 6.2.2 be-revised .to: reflect the current flope Creek Generating Station (11C0S) operating 3 ishif ti schedules, which: average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per week, but. consist of- twelve hour' i chilts. The same limitations on excess _ive overtime are maintained as in the
, present TS. Additionally;; modify = Administrative Controls, TECilNICAL REVIEW LAND CONTROL, pection-6.5.3.2.c to indicate that Station Qualifled Reviewers.
. meet'or exceed the qualifications: described'in Section 4.1 and 4.7 of ANS 3.1,
'1981.
- i t
4 .
f I
, a
/
REASON'FOR TIIE CilANGE: ,
t UNIT STAFPL TS-6.2.2 _. 3 Asipart:of: an extended . test,2 (over one year) the operating personnel at 11C08
- have worked 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> _shif ts for three or- four days per week wherein they-
- average forty-hours.per_ week. The' proposed' change' removes existing TS wording. '
that1conflicts with.this work schedule. }
- TECilNICAL' REVIEW AND:CONTR0Li-TS 6.5.3.2.c _ _
& The current TS indicates that~ Station Qualified Reviewers will meet or exce^d-
-the qualifications-described in Section-4 4 of ANS 3.1, 1981. This Section b does'not adequately provide qualification for review personnel in the areas of
? Operations"and' Maintenance. The proposed ANS Sections in this change are more appropriate for the review function, in general, and encompass all pertinent
.disciplin'es.
_ _- . .- - . , , ~ _ ,- g m, %y g -sw.- y y ,
E e
i a-
~ .'i}
i JUSTIFICATION FOR THE CHANGE- [
' UNIT STAFF, TS 6-2.2 The-current 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift schedule, which has been in place for two years-as l part of_a trial,:has enjoyed a high degree of acceptance among shift personnel,
~both; workers and supervision alike. During the trial period, shift workers
.haveLdemonstrated. higher morale, a high degree of alertness, high productivity, '
and. lower incidence of absence due to illness. .0'n the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift schedule,-
personnel _ceceive more consecutive time off and remain on the same shift for i blocks'of-time as. opposed'to rotating to different hours each. work week; these Econditions are considered as contributors to a healthier work force and improved ~ productivity in EPRI NP-6748, " Control Room Operator Alertness and .
Performance in Nuclear Power Plants", dated February, 1990. !
TECHNICAL REVIEW-AND CONTROL, TS 6.5.3.2.c Section 4.4 of ANS:3.1,~1981- contains-qualifications for. professional-technical
- group leaders,.whileLSection-4.7 pertains directly.to review personnel and is
.the more appropriate standard for delineating the qualifications-of Station
? Qualified Reviewers. !
i
_10CFR50.92 SIGNIFICANT' HAZARDS-CONSIDERATION ANALYSIL PSE&G_has, pursuant to 10CFR50.92,- reviewed;the proposed amendment to determine
.whetherLour request involven a significant hazards consideration. We have determinedLthat:-
f 1Thg operationLof; Hope Creek Generatino Station (HCGS)- in accordance with- the
' proposed chance will not-involve a significant -increase in the probability or
- a. . consequences of an accident previously evaluated. ;
-The= proposed amendment does not involve a physical or procedural change to-any
- structure, component or system that significantly.affects_the probability or-
^ consequences'of'anyEaccident or malfunctionJof equipment important to= safety 1 -;
- previously evaluated in the Updated Final Safety Analysis Report (UFSAR)'. The Lproposed changes will 'l)Lpermit the use of 12. hour shif ts which average 40.
(hours periveek and in-allLother aspects, satisfy the current hours-of-work 1
-guidelines linLTSL6.2.2 for operating shifts.and--2)(change the TS 6.5.3.2;c-specified ANS 3.I', 1981 section which. delineates =the qualifications of the-StationtQualified Reviewer position to the appropriate ANS 3.1,'1981-Section.
-These changes are. administrative in nature and have no significant impact on the probabilities or consequences of any evaluated accident or malfunction of
.safetygimportant' equipment.
The operation of Hope Creek Generating Station (HCGS) in accordance with the prop;osed chan3_e will not create the possibility of a new or differer!. kind of accident from any previously evaluated.
There are no physical changes to the plant or to the manner in which plant systems are operated involved in the proposed revision. The change modifies the working hours per shift for operating personnel without significantly changing the hours worked per week from the current TS requirements and retains the current limitations on excessive overtime. This change and the shift to the appropriate ANS Section for Station Qualified Reviewer qualifications are administrative in nature; therefore, no new or different accident is created.
The operation of Hope Creek Generating Station (HCGS) in accordance with the proposed change does not involve a pianificant reduction in_a_ margin of safety.
The Administrative controls TS sections for which these revisions are proposed have no Bases. described in the Technical Specifications. Plant operation with the proposed revision to shift working hours has been found to improve operator morale and performance. Citing of the more appropriate ANS 3.1 qualifications standard for Station Qualified Reviewers will more adequately ensure that all personnel performing review functions are properly qualified. Therefore, these proposed administrative changes will, if anything, enhance plant safety by
'their adoption.
Conclunion:
Dased upon the above, we have determined that this proposed change does not involve a Significant Hazards Consideration.