MONTHYEARML20093G4541995-10-18018 October 1995 Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommissioning Procedures for Nuclear Power Reactors ML20058K7381993-12-0303 December 1993 Memorandum & Order CLI-93-25.* Commission Denies State of Nj Petition for Leave to Intervene & Request for Adjudicatory Hearing Filed on 931008.W/Certificate of Svc.Served on 931203 ML20058E0151993-11-14014 November 1993 Comment Opposing Proposed Rule 10CFR50 Re Exemptions in Accident Insurance for Nuclear Power Plants Prematurely Shut Down ML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B0621993-10-20020 October 1993 Long Island Power Authority Response to Nuclear Regulatory Commission Order of 931014.* Requests That NRC Reject State of Nj Filing.W/Certificate of Svc ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059A4581993-10-14014 October 1993 Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld ML20057G2141993-10-14014 October 1993 Order.* Requests for Simultaneous Responses,Not to Exceed 10 Pages to Be Filed by State,Peco & Lipa & Served on Other Specified Responders by 931020.NRC May File by 931022. W/Certificate of Svc.Served on 931014 ML20059F0191993-10-0808 October 1993 Long Island Power Authority Reply to New Jersey Filing of 931020.* Licensee Requests That NRC Deny State of Nj Intervention Petition.W/Certificate of Svc ML20057F2191993-09-30030 September 1993 Exemption from Requirements of 10CFR50.54(q) Eliminating Licensee Requirement to Follow & Maintain in Effect Emergency Plans ML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20097C2911992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeal.* Dismisses 911203 Notice of Appeal W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees Due to Encl Settlement Agreement. W/Certificate of Svc ML20097C1361992-06-0303 June 1992 Petitioners Consented Motion to Dismiss.* Petitioners by Counsel Move ASLB to Dismiss Petitioners as Petitioners for Leave to Intervene & Request for Hearing in Proceeding W/ Prejudice.W/Certificate of Svc ML20097C1081992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Appeal.* Petitioners Hereby Move to Dismiss 910628 Notice of Appeal in Matter W/Prejudice & W/Each Party to Bear Own Costs & Atty Fees.W/ Certificate of Svc ML20097C2631992-06-0303 June 1992 Petitioner Consented Motion to Dismiss.* NRC Should Issue Order Dismissing School District & Scientists & Engineers for Secure Energy,Inc as Petitioners in Proceeding.W/ Settlement Agreement & Certificate of Svc ML20097C2891992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeals.* Appeals Being Dismissed Due to Encl Settlement Agreement.Nrc Should Dismiss Appeals W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees.W/Certificate of Svc ML20097C3241992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Joint Opposition to Issuance of Decommissioning Order Prior to Hearing.* W/Certificate of Svc ML20096A5921992-05-0707 May 1992 Motion to Withdraw Supplemental Filing.* Petitioners Urge NRC to Allow Withdrawal of Supplement for Good Cause Shown. W/Certificate of Svc ML20096A5311992-05-0606 May 1992 Long Island Power Authority Comments on SECY-92-140 & Response to Petitioner Joint Opposition to Decommissioning Order.* Util Urges NRC to Adopt Recommendation in SECY-92-140 & Approve Order.W/Certificate of Svc ML20096A5071992-05-0505 May 1992 Suppl to Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Supplements Joint Opposition Prior to Hearing.W/Certificate of Svc ML20095K8991992-04-29029 April 1992 Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Petitioners Urge Commission to Reject NRC Staff Proposal in SECY-92-140.W/Certificate of Svc ML20095H5611992-04-28028 April 1992 Affidavit of Lm Hill.* Affidavit of Lm Hill Supporting Util Position That Circumstances Exist Warranting Prompt NRC Action on NRC Recommendation That Immediately Effective Order Be Issued Approving Decommissioning Plan ML20094G3971992-02-26026 February 1992 Notice of State Taxpayer Complaint & Correction.* NRC Should Stay Hand in Approving Application for License Transfer as Matter of Comity Pending Resolution of Question as Util Continued Existence in Ny State Courts.W/Certificate of Svc ML20094G2261992-02-25025 February 1992 Petitioner Notice of Lilco/Long Island Power Authority Exaggeration & of Commencement of State Court Action.* NRC Should Await Ny State Decision Re Matter within Special Jurisdiction.W/Certificate of Svc ML20092K9021992-02-24024 February 1992 Petitioner Opposition to Ltr Request for Dismissal of Pages.* Suggests That Transfer of License Inappropriate at Present Time.W/Certificate of Svc ML20092K9511992-02-21021 February 1992 Response of Lilco & Long Island Power Authority to Petitioner Opposition to NRC Staff Recommendation for License Transfer Approval.* W/Certificate of Svc ML20092K8701992-02-20020 February 1992 Petitioners Opposition to NRC Staff Recommendation for Approval of License Transfer.* Urges Commission to Reject NRC Recommendation in SECY-92-041 & Remand Matter for Consideration in Normal Proceeding.W/Certificate of Svc ML20091E2661992-02-20020 February 1992 Petitioner Opposition to NRC Staff Motion to Dismiss.* Petitioners Urge NRC to Deny Staff Motion or Defer Action Until Petitioners Have Fully Developed Petitions & Supplied Detailed Contentions.W/Certificate of Svc ML20091E4011992-02-18018 February 1992 Answer of Long Island Power Authority to NRC Staff Motion to Dismiss Intervention Petitions.* Util Urges NRC to Grant Motion & Dismiss Intervention Petitions.W/Certificate of Svc ML20091E3161992-02-13013 February 1992 Lilco Response to NRC Staff Motion to Dismiss Intervention Petitions on Decommissioning Plan.* Requests That Petitions Be Struck & Petitioners Be Instructed of Possible Dismissal.W/Certificate of Svc ML20091E2741992-02-0606 February 1992 Answer of Long Island Power Authority to Intervention Petitions Concerning Shoreham Decommissioning Plan.* Requests That Petitions for Leave & Requests for Hearing Be Denied.W/Certificate of Svc & Notice of Appearance ML20092D2931992-02-0606 February 1992 Answer Denying Petitions for Leave to Intervene & Request for Prior Hearing Re Decommissioning ML20091E2941992-02-0606 February 1992 Lilco Opposition to Petitioner Request for Hearing on Shoreham Decommissioning Plan.* Informs That Util Opposes Both Requests for Hearing.W/Certificate of Svc ML20091E2831992-01-22022 January 1992 Shoreham-Wading River Central School District Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition for Leave Be Granted & Hearing Held. W/Certificate of Svc & Notice of Appearance ML20091E2811992-01-22022 January 1992 Scientists & Engineers for Secure Energy,Inc Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition Be Granted & Hearing Be Held.W/Certificate of Svc & Notice of Appearance ML20086T7231992-01-0303 January 1992 Motion of Long Island Power Authority for Leave to File Supplemental Matls.* Requests That Supplemental Memorandum & Supplemental Legislative History Matls Be Filed. W/Certificate of Svc ML20086T7541992-01-0303 January 1992 Memorandum of Long Island Power Authority Concerning Supplemental Legislative History Matls.* Supports Legislative History & Argues That License Not Subj to Termination Under Section 2828.W/Certificate of Svc ML20086Q9281991-12-30030 December 1991 Opposition of Util to Motion for Stay of License Transfer & to Suggestion of Mootness.* Concluded That Relief Sought in Petitioner Motion & Suggestion Should Be Denied. W/Certificate of Svc ML20086Q9171991-12-30030 December 1991 Lilco Opposition to Petitioners Request for Stay & Suggestion of Mootness.* Suggests That Stay Request & Suggestion of Mootness Be Denied.W/Certificate of Svc ML20091H8261991-12-19019 December 1991 Suggestion of Mootness Due to Long Island Power Authority Imminent Demise.* Concludes That If Commission Were to Transfer Shoreham Licenses to Lipa,Nrc Could Find Itself W/Class 103 Facility W/O Licensee.W/Certificate of Svc ML20091H8661991-12-18018 December 1991 Lilco Opposition to SE2 Appeal from LBP-91-26 & LBP-91-39. Concludes That Appeal Should Be Summarily Rejected or Be Denied on Merits.W/Certificate of Svc ML20086N1661991-12-17017 December 1991 Motion for Stay of License Transfer Pending Final Order on Petition to Intervene & Request for Hearing & for Addl or Alternative Stay.W/Certificate of Svc ML20086M0791991-12-16016 December 1991 Certificate of Svc.* Certifies Svc of Petitioner Notice of Appeal & Brief in Support of Appeal in Proceeding to Listed Individuals ML20086J6351991-12-0909 December 1991 Lilco Opposition to Petitioners Contentions on License Transfer Amend.* Concludes That License Transfer Amend Contentions Be Rejected & Petitioner Request to Intervene Denied.W/Certificate of Svc ML20086J3521991-12-0909 December 1991 Response of Long Island Power Authority to Petitioners Joint Supplemental Petition.* Board Should Dismiss Petitions to Intervene for Lack of Standing & Reject All Contentions Proffered by Petitioners.W/Certificate of Svc ML20094E1041991-12-0909 December 1991 Response to Long Island Power Authority to Petitioners Joint Supplemental Petition ML20091G1971991-12-0303 December 1991 Notice of Appeal.* Informs of Appeal of LBP-91-26 & LBP-91-39 in Facility possession-only License Proceeding ML20091G2051991-12-0303 December 1991 Brief in Support of Appeal.* Commission Should Consider Appeal on Basis That Findings of Matl of Facts Clearly Erroneous.W/Certificate of Svc ML20086C5471991-11-18018 November 1991 App to Joint Supplemental Petition of Shoreham-Wading River Central School District & Scientists/Engineers for Secure Energy,Inc.* ML20086C5381991-11-18018 November 1991 Petitioner Joint Supplemental Petition.* Petition Includes List of Contentions to Be Litigated in Hearing Re License Transfer Application.W/Certificate of Svc 1995-10-18
[Table view] Category:PLEADINGS
MONTHYEARML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B0621993-10-20020 October 1993 Long Island Power Authority Response to Nuclear Regulatory Commission Order of 931014.* Requests That NRC Reject State of Nj Filing.W/Certificate of Svc ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059F0191993-10-0808 October 1993 Long Island Power Authority Reply to New Jersey Filing of 931020.* Licensee Requests That NRC Deny State of Nj Intervention Petition.W/Certificate of Svc ML20097C2631992-06-0303 June 1992 Petitioner Consented Motion to Dismiss.* NRC Should Issue Order Dismissing School District & Scientists & Engineers for Secure Energy,Inc as Petitioners in Proceeding.W/ Settlement Agreement & Certificate of Svc ML20097C2911992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeal.* Dismisses 911203 Notice of Appeal W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees Due to Encl Settlement Agreement. W/Certificate of Svc ML20097C1361992-06-0303 June 1992 Petitioners Consented Motion to Dismiss.* Petitioners by Counsel Move ASLB to Dismiss Petitioners as Petitioners for Leave to Intervene & Request for Hearing in Proceeding W/ Prejudice.W/Certificate of Svc ML20097C1081992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Appeal.* Petitioners Hereby Move to Dismiss 910628 Notice of Appeal in Matter W/Prejudice & W/Each Party to Bear Own Costs & Atty Fees.W/ Certificate of Svc ML20097C2891992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeals.* Appeals Being Dismissed Due to Encl Settlement Agreement.Nrc Should Dismiss Appeals W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees.W/Certificate of Svc ML20097C3241992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Joint Opposition to Issuance of Decommissioning Order Prior to Hearing.* W/Certificate of Svc ML20096A5921992-05-0707 May 1992 Motion to Withdraw Supplemental Filing.* Petitioners Urge NRC to Allow Withdrawal of Supplement for Good Cause Shown. W/Certificate of Svc ML20096A5311992-05-0606 May 1992 Long Island Power Authority Comments on SECY-92-140 & Response to Petitioner Joint Opposition to Decommissioning Order.* Util Urges NRC to Adopt Recommendation in SECY-92-140 & Approve Order.W/Certificate of Svc ML20096A5071992-05-0505 May 1992 Suppl to Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Supplements Joint Opposition Prior to Hearing.W/Certificate of Svc ML20095K8991992-04-29029 April 1992 Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Petitioners Urge Commission to Reject NRC Staff Proposal in SECY-92-140.W/Certificate of Svc ML20094G2261992-02-25025 February 1992 Petitioner Notice of Lilco/Long Island Power Authority Exaggeration & of Commencement of State Court Action.* NRC Should Await Ny State Decision Re Matter within Special Jurisdiction.W/Certificate of Svc ML20092K9021992-02-24024 February 1992 Petitioner Opposition to Ltr Request for Dismissal of Pages.* Suggests That Transfer of License Inappropriate at Present Time.W/Certificate of Svc ML20092K9511992-02-21021 February 1992 Response of Lilco & Long Island Power Authority to Petitioner Opposition to NRC Staff Recommendation for License Transfer Approval.* W/Certificate of Svc ML20092K8701992-02-20020 February 1992 Petitioners Opposition to NRC Staff Recommendation for Approval of License Transfer.* Urges Commission to Reject NRC Recommendation in SECY-92-041 & Remand Matter for Consideration in Normal Proceeding.W/Certificate of Svc ML20091E2661992-02-20020 February 1992 Petitioner Opposition to NRC Staff Motion to Dismiss.* Petitioners Urge NRC to Deny Staff Motion or Defer Action Until Petitioners Have Fully Developed Petitions & Supplied Detailed Contentions.W/Certificate of Svc ML20091E4011992-02-18018 February 1992 Answer of Long Island Power Authority to NRC Staff Motion to Dismiss Intervention Petitions.* Util Urges NRC to Grant Motion & Dismiss Intervention Petitions.W/Certificate of Svc ML20091E3161992-02-13013 February 1992 Lilco Response to NRC Staff Motion to Dismiss Intervention Petitions on Decommissioning Plan.* Requests That Petitions Be Struck & Petitioners Be Instructed of Possible Dismissal.W/Certificate of Svc ML20091E2941992-02-0606 February 1992 Lilco Opposition to Petitioner Request for Hearing on Shoreham Decommissioning Plan.* Informs That Util Opposes Both Requests for Hearing.W/Certificate of Svc ML20091E2741992-02-0606 February 1992 Answer of Long Island Power Authority to Intervention Petitions Concerning Shoreham Decommissioning Plan.* Requests That Petitions for Leave & Requests for Hearing Be Denied.W/Certificate of Svc & Notice of Appearance ML20091E2811992-01-22022 January 1992 Scientists & Engineers for Secure Energy,Inc Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition Be Granted & Hearing Be Held.W/Certificate of Svc & Notice of Appearance ML20091E2831992-01-22022 January 1992 Shoreham-Wading River Central School District Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition for Leave Be Granted & Hearing Held. W/Certificate of Svc & Notice of Appearance ML20086T7231992-01-0303 January 1992 Motion of Long Island Power Authority for Leave to File Supplemental Matls.* Requests That Supplemental Memorandum & Supplemental Legislative History Matls Be Filed. W/Certificate of Svc ML20086Q9281991-12-30030 December 1991 Opposition of Util to Motion for Stay of License Transfer & to Suggestion of Mootness.* Concluded That Relief Sought in Petitioner Motion & Suggestion Should Be Denied. W/Certificate of Svc ML20086Q9171991-12-30030 December 1991 Lilco Opposition to Petitioners Request for Stay & Suggestion of Mootness.* Suggests That Stay Request & Suggestion of Mootness Be Denied.W/Certificate of Svc ML20091H8261991-12-19019 December 1991 Suggestion of Mootness Due to Long Island Power Authority Imminent Demise.* Concludes That If Commission Were to Transfer Shoreham Licenses to Lipa,Nrc Could Find Itself W/Class 103 Facility W/O Licensee.W/Certificate of Svc ML20091H8661991-12-18018 December 1991 Lilco Opposition to SE2 Appeal from LBP-91-26 & LBP-91-39. Concludes That Appeal Should Be Summarily Rejected or Be Denied on Merits.W/Certificate of Svc ML20086N1661991-12-17017 December 1991 Motion for Stay of License Transfer Pending Final Order on Petition to Intervene & Request for Hearing & for Addl or Alternative Stay.W/Certificate of Svc ML20086J3521991-12-0909 December 1991 Response of Long Island Power Authority to Petitioners Joint Supplemental Petition.* Board Should Dismiss Petitions to Intervene for Lack of Standing & Reject All Contentions Proffered by Petitioners.W/Certificate of Svc ML20086J6351991-12-0909 December 1991 Lilco Opposition to Petitioners Contentions on License Transfer Amend.* Concludes That License Transfer Amend Contentions Be Rejected & Petitioner Request to Intervene Denied.W/Certificate of Svc ML20091G2051991-12-0303 December 1991 Brief in Support of Appeal.* Commission Should Consider Appeal on Basis That Findings of Matl of Facts Clearly Erroneous.W/Certificate of Svc ML20086C5381991-11-18018 November 1991 Petitioner Joint Supplemental Petition.* Petition Includes List of Contentions to Be Litigated in Hearing Re License Transfer Application.W/Certificate of Svc ML20086C5471991-11-18018 November 1991 App to Joint Supplemental Petition of Shoreham-Wading River Central School District & Scientists/Engineers for Secure Energy,Inc.* ML20082G8971991-08-0909 August 1991 Lilco Responses to Petitioner Filings of 910805 & 06.* W/Certificate of Svc ML20082G8441991-08-0707 August 1991 Motion for Offical Notice to Correct Representation.* Moves Board to Take Official Notice of Encl NRC Records to Correct Representation Made at Prehearing Conference. W/Certificate of Svc ML20082G8571991-08-0707 August 1991 Petitioners Response to Lilco Re Physical Security Plan.* Petitioners Suggest That Util post-hearing Filing Does Not Dispose of Any Issue as to Util Compliance W/Settlement Agreement.W/Certificate of Svc ML20076D0721991-07-22022 July 1991 Petitioners First Emergency Motion for Stay.* Movants Urge Commission,In Interest of Justice,To Enjoin Lilco from Taking Any Actions Under possession-only License Which Might Moot Renewed Application for Stay.W/Certificate of Svc ML20076D1541991-07-22022 July 1991 Lilco Response to Petitioner Emergency Motions.* Believes Petitioner Emergency Motions Should Be Denied to End Frivolous Pleadings & Burdens of Time & Resources of Nrc. W/Certificate of Svc ML20076D0841991-07-21021 July 1991 Petitioners Second Emergency Motion for Stay.* Petitioners Urge Commission,Ex Parte,To Enjoin Lilco,From Any & All Acts W/Respect to Shoreham Which Would Be Inconsistent W/Nrc Representation in Court.W/Certificate of Svc ML20076D2071991-07-15015 July 1991 Lilco Opposition to Shoreham-Wading River Central School District (Swrcsd) Appeal from LBP-91-26.* Appeal Should Be Denied Due to Listed Reasons.W/Certificate of Svc ML20082D4051991-07-12012 July 1991 Lilco Opposition to SE-2s Contentions on Possession Only License Amend.* Concludes That Contentions Should Be Rejected & Request for Hearing on Possession Only License Amend Should Be Denied.W/Certificate of Svc ML20082D4001991-07-12012 July 1991 Movant-intervenors Motion for Change of Venue of Prehearing Conference.* Intervenors Request Change of Venue of 910730 Prehearing Conference from Hauppauge,Ny to Washington DC Area.W/Certificate of Svc ML20082D3891991-07-10010 July 1991 Lilco Support of NRC Staff Motion for Reconsideration of LBP-91-26.* for Reasons Listed,Nrc 910625 Motion Should Be Granted & Request for Hearing & Petition to Intervene in Amend Proceeding Should Be Denied.W/Certificate of Svc ML20082B4311991-07-0303 July 1991 Lilco Opposition to Petitioner Contentions on Confirmatory Order,Physical Security Plan & Emergency Preparedeness License Amends.* Petitioner Contentions Should Be Rejected & License Amends Denied.W/Certificate of Svc ML20082B3531991-07-0202 July 1991 Unopposed Motion for Variance in Svc Requirements.* Informs That Filing & Svc Requirements Presents No Obstacle to Filing W/Aslb or Svc Upon Any Parties.W/Certificate of Svc. Served on 910702.Granted for Licensing Board on 910702 ML20082B2461991-06-28028 June 1991 Movant-Intervenor Brief in Support Accompany Notice of Appeal.* School District Urges Commission to Reverse & Remand Dismissal Order W/Appropriate Guidance.W/Ceritifcate of Svc ML20082B2571991-06-28028 June 1991 Unopposed Motion for Variance in Svc Requirements.* Petitioners Urge ASLB to Grant Variance in Svc Procedures Requested to Allow Svc of Judge Ferguson.W/Certificate of Svc 1993-10-08
[Table view] |
Text
r e
LILCO, March 23,1987 9
DOCKETED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION -
37 MAR 25 NO 58 F
Before the Atomic Safety and Licensing Board [0C f[
ERAT:CH In the Matter of )
)
LONG ISLAND LIGHTING COMPANY ) Docket No. 50-;s22-OL-5
) (EP Exercise)
(Shoreham Nuclear Power Station, )
Unit 1) )
LILCO'S OPPOSITION TO INTERVENORS' REQUEST FOR EXTENSION ON CONTENTIONS EX 15,16 AND 21 Late last Friday af ternoon, seven days before the deadline for filing testimony on Contentions EX 15,16 and 21, Intervenors filed a request for an eighteen-day extension of that deadline. For the reasons stated below,1! LILCO opposes that request.
- 1. Intervenors Have Not Shown Good Cause for the Lengthy Extension Requested by Them at Virtually the Last Minute.
Intervenors advance a number of reasons as to why they need more time to com-plete their testimony. First, they state that testimony preparation on other issues has taken more time and resources than initially anticipated. That, LILCO submits, is en-tirely Intervenors' choice. All parties have been on equal notice of the schedule set by the Board on January 6 and of their obligations under it. If anything, Intervenors, who 1/ LILCO had expected that Intervenors' motion would be argued as an initial mat-ter at the hearing session scheduled for this morning. Because of the intervening ill-ness of Judge Frye and the cancellation of the hearing session, LILCO submits this reply in writing.
h5hhh$22 Ob PDR
e- have sponsored the contentions at issue, have a head start over the other parties in de-veloping testimony. If Intervenors choose to allocate their resources in a fashion suffi-cient to meet some deadlines but not others, then the other parties, which have bud-geted their time so as to meet all deadlines, should not be penalized by Intervenors' choices.
Second, Intervenors recite the unavaliability of Mr. Zahnleuter due to hearing commitments and of Ms. Letsche due to illness and expected hearing commitments.
Those facts do not commend the requested schedule revision. As to Mr. Zahnleuter, In-tervenors do not make any assertion how his having been in hearings interferes with In-tervenors' ability to complete their testimony on time.U As to Ms. Letsche, LILCO sympathizes with the problems created by the illness of a lawyer working on an issue (one of LILCO's attorneys, Ms. McCleskey, was taken out of action for a couple of weeks earlier this winter with pneumonia). However, the reported duration of Ms.
Letsche's illness - a week - does not justify an extension of two and a half weeks.
Further, the f act that this week's hearings have been cancelled since the filing of Inter-venors' motion eliminates a demand on Ms. Letsche's time and makes it possible for her to work on testimony this week.
2/ More generally, New York State has chosen to participate comprehensively in both this and the related -03 docket, and insists on its right to be treated as a separate party in both. Yet the State has assigned only one attorney to these two complex dock-ets, one of which has been ordered to be expedited. It is no more possible for Mr.
Zahnleuter than for any other mortal to be in more than one place at any given time.
It is, however, both possible and reasonable to expect the Empire State to do what the other participants in these dockets have done - assign enough attorneys to both pro-ceedings to protect its interests, rather than use the obvious limitations on a single lawyer's availability to seek to slow the pace of both proceedings to that of a sole prac-titioner.
i
g ,7
- if _3-With respect to the asserted novelty of the issues presented by Contentions EX 15 and 16, Intervenors make no attempt to particularize these issues, or to show how.
~
they make timely completion'of testimony on them impossible or.why this conclusion
! was recognized only one week before its deadline. This argument from Intervenors is
. all the more surprising since, af ter all, these issues are the Intervenors' issues, and they f
presumably should know the case they wish to present on them. Intervenors proposed these issues in their contentions over six months ago. Their meaning has been refined
. in multiple rounds of litigation since. It is simply not persuasive for them to assert, one j; week before the filing of the testimony on them, that unspecified aspects of the issues' complexity requires nearly three weeks' additional time given this three week re-l quest, the issues' complexity should have been apparent to Intervenors at least two weeks ago.
- 2. The Ra'===ted Extension Would Prejudice the Prrv'aartirw and the Other Parties.
!' Intervenors have the burden of establishing that granting their motion would not i prejudice the proceeding or the 1ther parties to it, or that any such prejudice is offset I
by the beneficial effects of the t?llei they seek. They have not made, or even at-tempted, such a showing.-
t Intervenors assert merely that the requested extension will not delay the hearing 1
I of Contentions EX 15,16 and 21. In this they may be technically correct. However, l
that fact is not the answer but merely the indication of the problem. There have al-l i
l ready been two weeks of hearing sessions. In that time, not even one cluster of issues l
L has been completed. LILCO and Suffolk County counsel stated on the re ;ord on March 19 their expectation that most of the second cluster of issues (Contentions EX 47,22.A.
Y -49 and 36) could be tried during the coming week. Even assuming that schedule is ad-
' hered to, three weeks of hearings will have been held already.E The next cluster of is-sues - the public information issues (Contentions EX 38, 39, et al.) - is the subject of
~
massive preflied testimony by Intervenors, and considerably briefer, but still substan-tial, testimony by LILCO.M These issues are followed by training issues (Contention EX 50), which again are the subject of lengthy filings by both LILCO and Intervenors.N At the current pace of proceedings, it will be several additional weeks before testimony on Contentions EX 15,16 and 21 is reached.
J The net result _is that, at this pace, Intervenors may well be right in asserting l
that their requested delay would not affect the date on which Contentions EX 15,16 and 21 are reached. It is also that Intervenors' cross-examination time alone may well I end up consuming more than a week of live hearing time for each hour of the exercise.
LILCO does not believe that the Commission had this type of pace in mind when it or-dered this proceeding to be expedited.
If Intervenors' current request is granted, there will be three forms of prejudice i to the proceeding and the other parties.
3/ Already Intervenors have begun to back away from those commitments. In tele-l phone conversations over the weekend, counsel for Suffolk County indicated that he was no longer prepared to commit to finishing with cross-examination of LILCO's panel
- on Contention EX 40 in a half-day. In another conversation, other counsel for Suffolk -
County asserted that the time projections stated on the record for cross-examination of LILCO witnesses on the " Cluster 2" issues may be significantly too short. If so, four or
.more weeks of cross-examination, the vast majority of it by Intervenors, may prove to have been required just to get through the " Cluster 2" issues.
l 4/ At 95 pages, LILCO's testimony is only about one-third the length of that filed by Intervenors.
5/ Again, Intervenors' prefiled testimony, at 211 pages, is approximately three times as long as LILCO's.
i i-l 4
V ' 5-First, LILCO will be prejudiced directly and significantly. All the parties have
.had to budget their time and resources to meet the interrelated series of deadlines set out by the Board on January 6. That means that in the finite time available, resources that might have been dedicated, given an unlimited amount of time, to some conten-tions may have had to be allocated to others instead. If LILCO had thought that the testimony for Contentions EX 15,16 and 21 would have been due in mid-April rather than late March, it surely would have been allocating its limited resources differently in the meantime. It is unfair for Intervenors to seek, at virtually the last minute, a major extension of one deadline out of a series when the other parties have been working in good faith to meet them all.EI Second, there is hardly such a thing as a delay that does not have further conse-quences for a proceeding. That is certainly the case for a major delay of the type re-quested here, if only because with so much additional time to write prefiled testimony, issues may become unnecessarily broadened.II To the extent that this delay broadens or delays the overall proceeding, it would be irreconcilable with the Commission's man-date in CLI-86-11 that the proceeding be expedited.
Third, this Board's own authority may be undermined if it accedes to the re-quested extension. The Board set a schedule on January 6 at a prehearing conference, af ter hearing extended argument from all the parties. LILCO has regarded that sched-ule as a set of serious requirements, and has bent its efforts to meeting it. Intervenors
!/ This is not even Intervenors' first request for an extension. Less than three weeks ago they sought, and were granted over LILCO's objection, a one-week extension of their deadline on training issues, Contention EX 50. There, as here, LILCO had bud-geted its time so as to be able to file its testimony on the original schedule.
1/ In telephone discussions Friday af ternoon with counsel for Suffolk County, coun-set for LILCO endeavored to learn whecier a lesser extension would suffice. Counsel for Suffolk County indicated not.
a
$ have apparently regarded it as a set of optional guidelines, to be observed until incon-venient. The Board has already granted Intervenors one scheduling extension. The cur-rent one is not only on shorter notice than the first extension (7 days v.10 last time) but is for a considerably longer period (18 days v. 7 last time). If Intervenors are given this extension, it may appear, in the absence of other controls, that they, not the ,
Board, are in charge of the proceeding's schedule, and that any requirements set by the Board can be waived by them virtually at will.
CONCLUSION Intervenors' argument does not justify, viewed charitably, an extension of as much as a week. Even that extension causes prejudicial effects. Granting the lengthy extension requested, on the short notice given, will prejudice LILCO. It will also preju-dice the proceeding in more subtle but significant ways. The requested extension should be denied.
Respectfully submitted
] l Ddt1'ald P. Irwin Lee B. Zeugin Kathy E.B. McCleskey Counsel for Long Island Lighting Company Hunton & Williams 707 East Main Street P.O. Box 1535 Richmond, Virginia 23212 DATED: March 23,1987
LILCO, Mrreh 23,1987
(
DOCMETED ll$NiiC CERTIFICATE OF SERVICE TI IWt 25 NO58 In the Matter of GFFICE OF HCitTAe
. LONG ISLAND LIGHTING COMPANY DOCMETihG 4 SEf4VICf.
(Shoreham Nuclear Power Station, Unit 1) BRANCH
- Docket No. 50-322-OL I hereby certify that copies of LILCO'S ' OPPOSITION TO - INTERVENORS' REQUEST ~FOR EXTENSION ON CONTENTIONS EX 15,-16 AND 21 were served this date upon the following by telecopter, as indicated by an asterisk, by Federal Express as indicated by two asterisks, or by first-class mail, postage prepaid.
John H. Frye, III, Chairman'* Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 East-West Towers 4350 East-West Hwy. Oreste Russ Pirfo, Esq.
- Bethesda, MD 20814 Edwin J. Reis Esq.
U.S. Nuclear Regulatory Commission Dr. Oscar H. Paris
- 7735 Old Georgetown Road Atomic Safety and Licensing (to mailroom)
Board Bethesda, MD 20814 U.S. Nuclear Regulatory Commission
- East-West Towers Herbert H. Brown, Esq.
- 4350 East-West Hwy. Lawrence Coe Lanpher, Esq.
Bethesda, MD 20814 Karla J. Letsche, Esq.
Kirkpatrick & Lockhart Mr. Frederick J. Shon
- South Lobby - 9th Floor Atomic Safety and Licensing 1800 M Street, N.W.
} Washington, D.C. 20036-5891
! Board U.S. Nuclear Regulatory Commission
- East-West Towers, Rm. 430 Fabian G. Palomino, Esq.
- 4350 East-West Hwy. Richard J. Zahnleuter, Esq.
Bethesda, MD 20814 Special Counsel to the Governor Executive Chamber Secretary of the Commission Room 229 Attention Docketing and Service State Capitol Section Albany, New York 12224 U.S. Nuclear Regulatory Commission 1717 H Street, N.W. Mary Gundrum, Esq.
Washington, D.C. 20555 Assistant Attorney General 120 Broadway j
Atomic Safety and Licensing Third Floor, Room 3-116 Appeal Board Panel New York, New York 10271 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l -. -
_ ___. - ._ _ .~.._. _ . _ _ _ . _ _ _. _ ._ _ _ _ ._
Spence W. Perry, Esq. * . Ms. Nora Bredes
. William R. Cumming, Esq. Executive Coordinator Federal Emergency Management Shoreham Opponents' Coalition Agency 195 East Main Street 500 C Street, S.W., Room 840 Smithtown, New York 11787 Washington, D.C. 20472 Gerald C. Crotty, Esq.
Mr. Jay Dunkleberger Counsel to the Governor New York State Energy Office Executive Chamber Agency Building 2 State Capitol Empire State Plaza Albany, New York 12224 Albany, New York 12223 Martin Bradley Ashare, Esq.
Stephen B. Latham, Esq. ** Eugene R. Kelly, Esq.
Twomey, Latham & Shea Suffolk County Attorney 33 West Second Street H. Lee Dennison Building P.O. Box 298 Veterans Memorial Highway Riverhead, New York 11901 Hauppauge, New York 11787 Mr. Philip McIntire Dr. Monroe Schneider Federal Emergency Management North Shore Committee Agency P.O. Box 231 26 Federal Plaza Wading River, NY 11792 New York, New York 10278 Jonathan D. Feinberg, Esq.
New York State Department of Public Service, Staff Counsel Three Rockefeller Plaza Albany, New York 12223
.h~ *Y
Hunton & Williams 707 East Main Street P.O. Box 1535 Richmond, Virginia 23212 I DATED: March 23,1987 l