Monthly Operating Rept for Mar 1987
ML20206P785
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/31/1987
From: White P, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8704210265
Download: ML20206P785 (8)


Text

_-

3 s'

  • AVERAGE DAILY UNIT POWER LEVEL Docket No. 311 Unit Name Salem # 2 Date -April 10,1987

. Completed by Pell White Telephone -609-935-6000 Extension 4451 l

Month March 1987 Day Average Daily Power Level Day Average Daily Power Level' (MWe-NET) (MWe-NET) ,

l 1 1021 17 792 2 808 18 702 3 813 19 745 4 802- 20 746 5 773 21 749 6 692 22 749 7 709 23 746 8 717 24 744 9 1005 25 747 i

10 1053 26 744 l 11 1063 27 716 l-12 410- 28 934 l

13 0 29 936 14- 0 30 940 l

l 15 809 31 861 1

i 16 1004 Pg. 8.1-7 R1 8704210265 870331 PDR ADOCK 05000311

'h E

R PDR

\

.s OPERATING DATA REPORT Docket No. 50-311 Date April 10,1987 Telephone 935-6000 Completed by Pell White Extension 4451 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period March 1987
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) IITY
6. Maximum Dependable Capacity (Gross MWe)l149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) NA
10. Reasons for Restrictions, if any This Month Year to Date Cumulative
11. Hours in Reporting Period 744 2160 47905
12. No. of Hrs. Reactor was Critical 700.5 ~

2101.3 28041.2

13. Reactor Reserve Shutdown Hrs. O 0 0
14. Hours Generator On-Line 695.7 2093.4 27031.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1863264 6493918 , 32502390
17. Gross Elec. Energy Generated (MWH) 600380 2135200 27312340
18. Net Elec. Energy Generated (MWH) 569815 2047411 25894816
19. Unit Service Factor 93.5 96.9 56.4
20. Unit Availability Factor 93.5 96.9 56.4
21. Unit Capacity Factor (using MDC Net) 69.2 85.7 48.9
22. Unit Capacity Factor (using DER Net) 68.7 85.0 48.5
23. Unit Forced Outage Rate 6.5 3.1 33.3
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2

/

UNIT SHUTDOWN AND POWER REDUCTIONS -- - ~ ' Dock 3t No. 50-311 -

REPORT MONTH MARCH-1987- Unit' Nam 3 sak m NO.Z Date .

April 10,1987 -

Completed by Pell White 6 Telephone 609-935-6000' '

Extension 4451 Method of Duration Shutting- License Cause and Corrective No. Date Type Hours -Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence 0100 03-12-87 F 48.22 A 3 ----

HA 1 GENERA Exciter Field Bheostat.

Nuclear Valves and Piping' Reactor 0103 03-31-87 F 4.17 A 5 ----

PC- PIPEXX Water Clean-l l

l 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File (NUREG 0161)

H-Other-explain

V MAJOR' PLANT MODIFICATIONS DOCKET NO.: 50-311 JREPORT MONTH MARCH 1987 UNIT NAME: Salem 2 DATE: April-13, 1987 COMPLETED BY: L. Miller TELEPHONE:. 609/339-4497

  • DCR NO . PRINCIPAL SYSTEM SUBJECT 2SC-1245 . Pressurizer Over- Change design of Pressurizer Pressurization 'Overpressurization System to Protection 'one similar to Unit:#1, utilizing 2PR1.and 2PR2 as the

" POPS" valves.

  • Design Change Request

] e

- MAJOR PLANT MODIFICATIONS DOCKET NO: 50-311 REPORT MONTH - MARCH 1986 UNIT NAME:: Salem 2-DATE: April 13,1987 COMPLETED BY: L. Miller TELEPHONE: (609)339-4497

' Overpressurization System,'similar'to Unit #1, utilizing 2PRI and 2PR2 as the " POPS" Valves.

- The Marotta Valves presently installed are very difficult to keep operationt.1, also valves manufactured by Target Rock (installed on head vents) have experienced similar problems The inoperability;of these valves has caused the inability to shut down Unit #2 in an. orderly.

manner and delays in the restart of the unit.,

The DCR will not change any plant process .cuf discharge and will not effect the existing environmental impact.of the-plant. Therefore, no unreviewed safety or environmental questions are involved.

  • DCR - Design Change Request 6

-y- , - ___x.. ,_-,_.,_,,-........,.,,..m.,. , ,y.,, , .._.,.,_.,,_.,.,_.,,,p...,_y __,,-,a,,.,_,.,_..p,,..,. . , , . , , - _ _ . . _ . , _ _ mm .,

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 2 MARCH 1987 i

On Sunday, March 1, the high voltage lines from Hope Creek to Keeney (5015) parted when a tanker struck and destroyed one of the towers in the Delaware River. Two other towers suffered damage from the sudden change in tower forces. The Salem and Hope Creek Units were reduced to approximately 75% and were held at that level for electrical system stability. Initial indications are that repairs could take between 12 and 18 months to return the line to service. In the interim, steps are being taken to change the relaying protection (trip-a-unit scheme) so that the units can be returned to near 100% power.

The unit began the month at essentially full power and operated at that-level until March 1, 1987 (Sunday) when it was reduced to 75%

L power, limited by electrical system stability as mentioned above. The unit continued at that level until March 6, 1987, when it was reduced to about 65%, still limited by electrical stability.

After Unit I was removed from service, Unit 2 power was increased on j March 9, 1987 to 88% and to 96% on March 10, 1987, where it remained until March 12, 1987. The loss of generator field excitation caused a turbine reactor trip on March 12, 1987. After thorough investigation and testing, the unit was returned to service on March 14, 1987 and by March 15, 1987 had achieved 93% power where it remained until March 17, 1987. Power was reduced to 75%, and subsequently to 72% on March 18, 1987, for grid stability.

The unit continued at 790 MW until Friday, March 27, when the trip-a-unit system was energized following a presentation meeting with the NRC. A power escalation was initiated and 89% power was achieved during the weekend. On Tuesday, March 31, power was reduced at the Load Dispatcher's request because the trip-a-unit scheme was de-energized due to an approaching thunderstorm. Power was increased to approximately 87% later the same day.

REFUELING INFORMATION DOCKET NO.: 50-311 COMPLETED BY: L.K. Miller UNIT NAME: Salem 2 DATE: April 13, 1987 TELEPHONE: 609/935-6000 EXTENSION: 4497 Month March 1987

1. Refueling information has changed from last month:

YES NO X

2. Scheduled date for next refueling: April 9, 1988
3. Scheduled date for restart following refueling:

June 8, 1988

4. A) Will Technical Specification changes or other license amendments be required?

YES NO X B) Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X If no, when is it scheduled? February, 1988

5. Scheduled date(s) for submitting proposed licensing action:

February 1988 if required

6. Important licensing considerations associated with refueling:

NONE

7. Number of Fuel Assemblies:

A) Incore 193 B) In Spent Fuel Storage 224

8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: March 2003 8-1-7.R4

L:

p? :

O PSEG Public Service Electric and Gas Company - ~ P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station April 13, 1987 Director, Office of Management U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of March 1987 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major = Plant Modification Operating Summary

' Refueling Information Sincerely yours,

, J. . pko, Jr.

General Manager - Salem Operations JR:sl cc: Dr. Thomas E. Murley Regional Administrator USNRC 4 Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-1-7.R4 The Energy People ,,i osaw u, u n

- _ _ - _ _ . -