ML20195F794
From kanterella
ML20195F794 | |
Person / Time | |
---|---|
Issue date: | 11/17/1998 |
From: | NRC (Affiliation Not Assigned) |
To: | |
Shared Package | |
ML20195F782 | List: |
References | |
NUDOCS 9811200086 | |
Download: ML20195F794 (7) | |
Similar Documents from NRC (Affiliation Not Assigned) | |
---|---|
Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999
[Table view]Some use of "" in your query was not closed by a matching "".Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20217J0721999-10-18018 October 1999 Safety Evaluation of Topical Rept EMF-2158(P),Rev 0, Seimens Power Corp Methodology for Boiling Water Reactors, Evaluation & Validation of Casmo-4/Microburn-B2. Rept Acceptable for Licensing Evaluations of BWR Neutronics ML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary ML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 ML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217G0931999-10-15015 October 1999 Safety Evaluation of Topical Rept BAW-10179P,Rev 3, Safety Criteria & Methodology for Acceptable Cycle Reload Analysis. Rev 3 Found Acceptable & Accurately Include Conditions & Limitations for Applicability of References ML20217K0651999-10-15015 October 1999 Safety Evaluation of Topical Rept BAW-10193P, RELAPS5/MOD2-B&W for Safety Analysis of B&W-Designed Pressurized-Water Reactors. Rept Acceptable for Referencing in Licensing Applications ML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair ML20217G2161999-10-15015 October 1999 Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 ML20217J1101999-10-13013 October 1999 Safety Evaluation of Topical Rept TR-108727, BWRVIP Vessel & Internals Project,Bwr Lower Plenum Insp & Flaw Evaluation Guideline (BWRVIP-47). Rept Will Provide Acceptable Level of Quality for Exam of safety-related Components ML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217C9121999-10-12012 October 1999 SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change ML20217C1311999-10-0808 October 1999 Safety Evaluation Supporting Amend 153 to License DPR-3 ML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217B1641999-10-0505 October 1999 Safety Evaluation of Topical Rept BAW-10228P. Science. Rept Acceptable for Licensing Applications,Subject to Listed Conditions in Accordance with Fcf Agreement (Reference 4) ML20212M2141999-10-0505 October 1999 Safety Evaluation Concluding That Topical Rept EMF-2158(P), Rev 0,acceptable for Licensing Evaluations of BWR Neutronics Designs & Applications,As Per SPC Agreement (Ref 9) Subj to Stated Conditions ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico ML20212K9781999-09-30030 September 1999 Safety Evaluation Accepting USI A-46 Implementation Program ML20212J1301999-09-30030 September 1999 Safety Evaluation Concluding That Topical Rept WCAP-12472-P-A,Addendum 1, Beacon-Core Monitoring & Operations Support System, Acceptable for Licensing Applications Subj to Pertinent Restrictions ML20212J9141999-09-29029 September 1999 Safety Evaluation of Topical Rept TR-108724, BWRVIP Vessel & Internals Project,Vessel Id Attachment Weld Insp & Flow Evaluation Guidelines (BWRVIP-48) ML20212J9661999-09-29029 September 1999 Safety Evaluation of Topical Rept TR-107285, BWRVIP Vessel & Internals Project,Bwr Top Guide Insp & Flaw Evaluation Guidelines (BWRVIP-26), Dated Dec 1996.Rept Acceptable ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20212E6341999-09-23023 September 1999 Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 ML20212D3831999-09-20020 September 1999 Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216F9831999-09-20020 September 1999 Safety Evaluation Supporting Amend 11 to License R-115 ML20216H9901999-09-20020 September 1999 Proposed Final Rept Impep Review of South Carolina Agree- Ment State Program 990712-16 ML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 1999-09-30 Category:TOPICAL REPORT EVALUATION MONTHYEARML20217J0721999-10-18018 October 1999
[Table view]Some use of "" in your query was not closed by a matching "".Safety Evaluation of Topical Rept EMF-2158(P),Rev 0, Seimens Power Corp Methodology for Boiling Water Reactors, Evaluation & Validation of Casmo-4/Microburn-B2. Rept Acceptable for Licensing Evaluations of BWR Neutronics ML20217G0931999-10-15015 October 1999 Safety Evaluation of Topical Rept BAW-10179P,Rev 3, Safety Criteria & Methodology for Acceptable Cycle Reload Analysis. Rev 3 Found Acceptable & Accurately Include Conditions & Limitations for Applicability of References ML20217K0651999-10-15015 October 1999 Safety Evaluation of Topical Rept BAW-10193P, RELAPS5/MOD2-B&W for Safety Analysis of B&W-Designed Pressurized-Water Reactors. Rept Acceptable for Referencing in Licensing Applications ML20217J1101999-10-13013 October 1999 Safety Evaluation of Topical Rept TR-108727, BWRVIP Vessel & Internals Project,Bwr Lower Plenum Insp & Flaw Evaluation Guideline (BWRVIP-47). Rept Will Provide Acceptable Level of Quality for Exam of safety-related Components ML20212M2141999-10-0505 October 1999 Safety Evaluation Concluding That Topical Rept EMF-2158(P), Rev 0,acceptable for Licensing Evaluations of BWR Neutronics Designs & Applications,As Per SPC Agreement (Ref 9) Subj to Stated Conditions ML20217B1641999-10-0505 October 1999 Safety Evaluation of Topical Rept BAW-10228P. Science. Rept Acceptable for Licensing Applications,Subject to Listed Conditions in Accordance with Fcf Agreement (Reference 4) ML20212J1301999-09-30030 September 1999 Safety Evaluation Concluding That Topical Rept WCAP-12472-P-A,Addendum 1, Beacon-Core Monitoring & Operations Support System, Acceptable for Licensing Applications Subj to Pertinent Restrictions ML20212J9661999-09-29029 September 1999 Safety Evaluation of Topical Rept TR-107285, BWRVIP Vessel & Internals Project,Bwr Top Guide Insp & Flaw Evaluation Guidelines (BWRVIP-26), Dated Dec 1996.Rept Acceptable ML20212J9141999-09-29029 September 1999 Safety Evaluation of Topical Rept TR-108724, BWRVIP Vessel & Internals Project,Vessel Id Attachment Weld Insp & Flow Evaluation Guidelines (BWRVIP-48) ML20216F4771999-09-16016 September 1999 Safety Evaluation of Topical Rept TR-108823, BWR Vessel & Internals Project,Bwr Shroud Support Insp & Flaw Evaluation Guidelines (BWRVIP-38).Requests That BWRVIP Be Reviewed & Resolve Issues & Incorporate Concerns in Revised BWRVIP-38 ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20212B2501999-09-0202 September 1999 Safety Evaluation of TR WCAP-14696, WOG Core Damage Assessment Guidance, Rev 1.Rept Acceptable ML20211K5711999-09-0101 September 1999 FSER by NRR Re BWR Vessel & Internals Project,Instrument Penetration Insp & Flaw Evaluation Guidelines (BWRVIP-49), for Compliance with License Renewal Rule (10CFR54).TR Acceptable ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20209H9571999-07-15015 July 1999 Safety Evaluation Accepting EPRI Rept TR-105696-R1, BWR Vessel & Intervals Project:Reactor Pressure Vessel & Internals Examination Guidelines (BWRVIP-03) Rev 1, ML20209F1571999-07-0808 July 1999 Safety Evaluation of Topical Rept TR-108695, BWR Vessel & Internals Project,Instrument Penetration Inspection & Flaw Evaluation Guidelines (BWRVIP-49). Rept Acceptable.Rept Demonstrates That Aging Effects of Rv Components Adequate ML20209F1261999-07-0808 July 1999 Safety Evaluation of Topical Rept TR-108709, BWRVIP Vessel & Internals Project Low Alloy Steel Vessel Materials in BWR Environment (BWRVIP-60). Rept Acceptable for Assessment of SCC Growth in BWR Low Alloy Steel Pressure Vessels ML20209D9651999-07-0707 July 1999 Safety Evaluation of Topical Rept WCAP-14750, RCS Flow Verification Using Elbow Taps at Wesstinghouse 3-Loop Pressurized Water Reactors. Changes to TS Bases Acceptable ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20196G6321999-06-15015 June 1999 Safety Evaluation of Topical Rept EMF-2087(P),Rev 0, SEM/PWR-98:ECCS Evaluation Model for PWR LBLOCA Application, Rept Acceptable ML20195J2681999-06-14014 June 1999 Safety Evaluation of Topical Rept TR-108726, BWR Vessel & Internals Project,Lpci Coupling Insp & Flaw Evaluation Guidelines (BWRVIP-42). Rept Acceptable for Insp of safety- Related LPCI Coupling Assemblies,Except Where Staff Differ ML20207H1521999-06-0909 June 1999 Safety Evaluation of Topical Rept TR-108708, BWRVIP Vessel & Internals Project,Underwater Weld Repair of Nickel Alloy Reactor Vessel Internals (BWRVIP-44), Sept,1997.Rept Acceptable ML20207G4971999-06-0808 June 1999 Safety Evaluation Re Mods to TR CENPD-266-P-A, Application of Dit Cross Section Library Based on ENDF/B-VI. Rept Acceptable ML20195D3061999-06-0202 June 1999 Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable ML20207C7321999-05-26026 May 1999 Safety Evaluation of Topical Rept BAW-2248, Demonstration of Mgt of Aging Effects for Reactor Vessel Internals. Rept Provides Individual B&W Nuclear Power Plant Utility Owner with Technical Details for for License Application Renewal ML20195J2271999-05-25025 May 1999 Safety Evaluation of CE Owner Group Topical Rept CE NPSD-951 Rev 1,justifying, Reactor Trip Circuit Breakers Surveillance Frequency Extension ML20207A6251999-05-21021 May 1999 Safety Evaluation of TR WCAP-14449(P), Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection. Rept Acceptable ML20207B0241999-05-18018 May 1999 Safety Evaluation of Topical Rept TR-107285, BWR Vessel & Intervals Project,Bwr Top Guide Insp & Flaw Evaluation Guidelines (BWRVIP-26), Dtd December 1996.Rept Acceptable ML20206K7691999-05-0808 May 1999 Topical Rept Evaluation of CENPD-389-P, 10x10 Svea Fuel Critical Power Experiments & CPR Correlations:SVEA-96+. Rept Acceptable ML20206D5441999-04-28028 April 1999 Safety Evaluation of Topical Rept TR-107284, BWRVIP Vessel & Internals Project,Bwr Core Plate Insp & Flaw Evaluation Guideline (BWRVIP-25). Rept Acceptable for Insp & Flaw Evaluation of Subject safety-related Core Interal ML20206D4951999-04-26026 April 1999 Safety Evaluation Supporting Topical Rept BAW-2251, Demonstration of Mgt of Aging Effects for Rv ML20205L9441999-04-0808 April 1999 Safety Evaluation of Topical Rept CENPD-289-P, Use of Inert Replacement Rods in Abb C-E Fuel Assemblies. Rept Acceptable ML20205L9671999-04-0707 April 1999 Safety Evaluation of Topical Rept TR-108727, BWRVIP Vessel & Internals Project,Bwr Lower Plenum Insp & Flaw Evaluation Guideline (BWRVIP-47). Rept Found Acceptable Except Where Staff Conclusions Differ from BWRVIP ML20205F0251999-03-21021 March 1999 Safety Evaluation of Topical Rept TR-108727, BWRVIP Vessel & Internals Project Vessel Id Attachmant Weld Insp & Flaw Evaluation Guidelines. Rept Acceptable ML20207E3821999-03-0202 March 1999 Topical Rept Evaluation of SL-5159(P), Methodology & Verification of Gapp Program for Analysis of Piping Systems with E-Bar Supports. Staff Finds Topical Rept Acceptable for Referencing in Licensing Applications ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20203C1841999-02-0303 February 1999 Safety Evaluation of Topical Rept NEDC-32721P, Application Methodology for General Electric Stacked Disk ECCS Suction Strainer, Part 1.Concluded That Use of GE Hydraulics Design Method Acceptable for All Plants,With One Noted Exception ML20203A7461999-02-0202 February 1999 Safety Evaluation of Siemens Power Corp Topical Rept EMF-92-116(P), Generic Mechanical Design Criteria for PWR Fuel Design. Rept Acceptable ML20199L6651999-01-25025 January 1999 Topical Rept/Ser of BAW-10186P, Extended Burnup Evaluation. Rept Acceptable.Staff Finds That Improved Methodology Adequate & Acceptable for Fuel Reload Licensing Applications Subject to Listed Conditions ML20198G1851998-12-15015 December 1998 Safety Evaluation for Topical Rept WCAP-14572,rev 1, WOG Application of Risk-Informed Methods to Piping ISI Topical Rept ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F7041998-11-17017 November 1998 Safety Evaluation Accepting Topical Rept NEDC-24154P, Supplement 1,for Referencing in Licensing Applications to Extent Specified & Under Limitations Delineated in Rept ML20195F7941998-11-17017 November 1998 Safety Evaluation of EPRI TR-106708 & TR-106893.Repts Found to Be Acceptable for Replacement &/Or Repair of BWRVIP Vessel & Internals Project,Internal Core Spray Components ML20195C6721998-11-10010 November 1998 Safety Evaluation of Topical Rept WCAP-15029, Westinghouse Methodology for Evaluating Acceptability of Baffle-Former- Bolting Distribution Under Faulted Load Conditions ML20155G3901998-11-0505 November 1998 Safety Evaluation of TR GENE-770-06-2, Addendum to Bases for Changes to Surveillance Test Intervals & Allowed Out-of- Svc Times for Selected Instrumentation Tss. Rept Acceptable ML20155G3031998-11-0505 November 1998 Safety Evaluation of TRs NEDC-30844, BWR Owners Group Response to NRC GL 83-28, & NEDC-30851P, TSs Improvement Analysis for BWR Rps. Rept Acceptable ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable ML20154F0711998-10-0606 October 1998 SE of TR WCAP-14036,Rev 1, Elimination of Periodic Protection Channel Response Time Tests. Rept Acceptable ML20155G2611998-10-0505 October 1998 Corrective Page 9 of Safety Evaluation of TR WCAP-14036,Rev 1, Elimination of Periodic Protection Channel Response Time Tests. Typos Made in Original Rept Re Components Covered by Solid State Protection Sys Were Corrected 1999-09-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20195F794&oldid=2984489"