ML20282A689

From kanterella
Revision as of 23:31, 21 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Section 7 - Appendix V - Significant Enforcement Actions Issued, 2019 - 2020-2021 Information Digest, Vol. 32
ML20282A689
Person / Time
Issue date: 10/30/2020
From: Couret I
Office of Public Affairs
To:
Malone, Tina
Shared Package
ML20282A628 List:
References
NUREG-1350 V32
Download: ML20282A689 (2)


Text

APPENDICES APPENDIX V Significant Enforcement Actions Issued, 2019 Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders.

The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.

Action # Name Type Issue Date Enforcement Action IA-18-044 Mr. John Emore Individual 01/03/2019 SLIII/NOV EA-18-132 Fleis & VandenBrink Engineering, Inc. Materials 01/17/2019 (2) SLIII/NOV EA-18-032 Southern Nuclear Operating Company Reactor 01/29/2019 Confirmatory Order result of an Inc. (Joseph M Farley Nuclear Power ADR mediation Plant)

EA-18-076 Howard University Materials 01/31/2019 SLIII/NOV EA-18-113 Mistras Group, Inc. Materials 02/13/2019 SLIII/NOV IA-18-043 Mr. Randy Bethea Individual 02/13/2019 Order banning for one year EA-18-133 Providence Alaska Medical Center Materials 02/21/2019 SLIII/NOV/Problem/CP-$14,500 IA-18-049 Mr. Timothy Murdock Individual 03/08/2019 SLIII/NOV IA-18-050 Mr. David Monzon Individual 03/08/2019 SLIII/NOV EA-18-155 Southern California Edison Company Reactor 03/25/2019 SLII NOV/SLIII NOV/CP-$116,000 (San Onofre Nuclear Generating Station)

EA-18-104 Exelon Generation Company Reactor 04/01/2019 White/NOV (Clinton Power Station)

EA-18-131 Prime NDT Services, Inc. Materials 04/01/2019 Confirmatory Order result of an ADR mediation/ CP-$3500 EA-18-138 Entergy Operations Inc. Reactor 04/05/2019 SLIII/NOV/Problem (Waterford Steam Electric Station)

EA-18-182 Tennessee Valley Authority Reactor 04/15/2019 White/NOV (Watts Bar Nuclear Plant)

EA-18-174 Entergy Operations Inc. Reactor 04/19/2019 SLIII/NOV (River Bend Station)

EA-18-151 Holtec International Materials 04/24/2019 SLIII/NOV EA-18-153 Idaho State University Materials 05/02/2019 Confirmatory Order result of an ADR mediation EA-18-123 Solis Tek, Inc. Materials 05/15/2019 SLIII Problem/NOV/CP-$43,500 EA-19-024 Mirion Technologies Corporation Materials 05/16/2019 SLIII/NOV EA-19-003 Froehling & Robertson, Inc. Materials 05/20/2019 SLIII Problem/NOV; SLIII/NOV; SLIV/NOV EA-18-170 Source Production & Equipment Co. Materials 06/03/2019 SLIII/NOV EA-18-165 Wolf Creek Nuclear Operating Reactor 07/18/2019 Confirmatory Order result of an Corporation (Wolf Creek) ADR mediation IA-19-005 Mr. Chad Chaffain Individual 07/18/2019 SLIII/NOV EA-17-175 Dead Ringer, LLC Materials 08/08/2019 SLIII/NOV/CP-$43,500 EA-18-183 IA-17-043 Mr. Jesse Erdle Individual 08/08/2019 SLIII/NOV IA-19-002 Mr. Kristian Meyer Individual 08/08/2019 SLIII/NOV IA-19-028 Mr. Alex Block Individual 08/12/2019 SLIII/NOV EA-19-090 APINDE Inc. Materials 08/22/2019 Order - Suspending License EA-18-161 Louisiana Energy Services, LLC (LES) Fuel Facility 09/05/2019 SLIII/NOV (d/b/a URENCO USA)

IA-19-007 Mr. Justin Roberts Individual 09/05/2019 Order banning for one year EA-18-119 Framatome Inc. Non-licensee 09/12/2019 SLIII/NOV EA-18-066 Florida Power and Light Company Reactor 09/12/2019 SLII/NOV/CP-$232,000 (St. Lucie Plant)

IA-18-040 Mr. Thomas Summers Individual 09/12/2019 Order banning for five years IA-19-031 Mr. Patrick Ryan Individual 09/12/2019 SLIII/NOV For the most recent information, go to the Dataset Index Web page at https://www.nrc.gov/reading-rm/doc-collections/datasets/.

148

7 APPENDIX V Significant Enforcement Actions Issued, 2019 (continued)

Action # Name Type Issue Date Enforcement Action EA-19-040 Manufacturing Sciences Corporation Materials 10/10/2019 SLIII/NOV IA-19-027 Mr. Thomas Saunders Individual 10/21/2019 Confirmatory Order result of an ADR meditation EA-17-175 Dead Ringer, LLC Materials 10/22/2019 Order Imposing a EA-18-183 Civil Penalty-$43,500 EA-19-042 Tennessee Valley Authority Reactor 11/19/2019 SLIII/NOV/CP-$145,000 (Watts Bar Nuclear Plant Unit 2)

EA-18-130 Southern Nuclear Operating Company Reactor 11/20/2019 Confirmatory Order result of an EA-18-171 Inc. (Vogtle Units 3 and 4) ADR mediation IA-18-045 Mr. Mark Rauckhorst Individual 11/20/2019 SLIII/NOV IA-19-032 Mr. Wesley McGill Individual 11/22/2019 SLIII/NOV IA-19-036 Mr. Daniel Comisky Individual 11/25/2019 SLIV/NOV EA-19-085 Stillwater Mining Materials 12/19/2019 SLIII/NOV/CP-$7,250 EA-18-034 Western Nuclear Inc. Materials 12/19/2019 SLIII/NOV/CP-$14,500 For the most recent information, go to the Dataset Index Web page at https://www.nrc.gov/reading-rm/doc-collections/datasets/.

149