Section 7 - Appendix K - Commercial Nuclear Power Plant Licensing History 1955-2020 - 2020-2021 Information Digest, Vol. 32
ML20282A677
Person / Time
Issue date: 10/30/2020
From: Couret I
Office of Public Affairs
To:
Malone, Tina
Shared Package
ML20282A628 List:
References
NUREG-1350 V32
Download: ML20282A677 (2)


Text

132 For the most recent information, go to the Dataset Index Web page at https://www.nrc.gov/reading-rm/doc-collections/datasets/.

A PPENDICES APPENDIX K Commercial Nuclear Power Plant Licensing History 1955-2020 Year Original Licensing Regulations (10 CFR Part 50)1 Alternative Licensing Regulations (10 CFR Part 52)3 Permanent Shutdowns6 Operable Units CP Issued2 Full-Power OL Issued COL Issued4 Operating COLs5 1955 1

0 0

0 1956 3

0 0

0 1957 1

1 0

1 1958 0

0 0

1 1959 3

1 0

2 1960 7

1 0

3 1961 0

0 0

3 1962 1

6 0

9 1963 1

2 1

11 1964 3

3 17 13 1965 1

0 0

13 1966 5

2 17 14 1967 14 3

2 15 1968 23 0

17 13 1969 7

4 0

17 1970 10 3

1 20 1971 4

2 0

22 1972 8

6 2

27 1973 14 15 0

42 1974 23 15 2

55 1975 9

2 0

57 1976 9

7 1

63 1977 15 4

0 67 1978 13 4

1 70 1979 2

0 1

69 1980 0

2 0

71 1981 0

4 0

75 1982 0

4 17 78 1983 0

3 0

81 1984 0

6 0

87 1985 0

9 0

96 1986 0

5 0

101 1987 0

8 1

107 1988 0

2 0

109 1989 0

4 3

111 1990 0

2 0

112 1991 0

0 1

111 1992 0

0 2

109 1993 0

1 0

110 1994 0

0 0

109

133 For the most recent information, go to the Dataset Index Web page at https://www.nrc.gov/reading-rm/doc-collections/datasets/.

7 1995 0

0 0

109 1996 0

1 3

109 1997 0

0 0

0 2

107 1998 0

0 0

0 1

104 1999-2011 0

0 0

0 0

104 2012 0

0 4 units 0

0 104 2013 0

0 0

0 4

100 2014 0

0 0

0 1

99 2015 0

1 1 unit 0

0 100 2016 0

0 6 units 0

1 99 2017 0

0 1 unit 0

0 99 2018 0

0 2 units 0

1 98 2019 0

0 0

0 2

96 2020 0

0 0

0 2

94 Total 177 133 14 units 0

38 U.S. Atomic Energy Commission was the regulatory authority.

- - Not applicable 1 Data in columns 1-3 are based on 10 CFR Part 50. Numbers reflect permits or licenses issued in a given year, not extant permits or licenses.

2 Issuance by regulatory authority of a permit, or equivalent permission, to begin construction. Under alternative licensing regulations in 10 CFR Part 52,aconstruction permit (CP)isnot issuedseparatelyfromthe operating license.

3 Data in columns 4-6 are based on 10 CFR Part 52. Numbers reflect permits or licenses issued in a given year, not extant permits or licenses.

4. Number of combined licenses (COLs) issued in a given year, including six that weresubsequently terminated. See Appendix A on status of plant construction and Appendix B for more information on withdrawn and suspended applications.

5 Issuance by the NRC of a finding under 10 CFR 52.103(g), in a given year.

6 Number of operating plants transitioned to shutdown in a given year. Does not represent the total number of reactor units included.

7 These are DOE nuclear legacy sites Hallam (1964), Piqua (1966), Elk River (1968), and Shippingport (1982). For more information, visit DOE's Legacy Management Web site at https://energy.gov/lm/sites/lm-sites and see the Glossary for definitions of decommissioning alternatives (DECON, SAFSTOR).

Source: U.S. Energy Information Administration/Annual Energy Review 2011 located at https://www.eia.gov/aer and compilation of NRC information following 2011.

Data are current as of August 2020; the next printed update will be in August 2021.

APPENDIX K Commercial Nuclear Power Plant Licensing History 1955-2020 (continued)

Year Original Licensing Regulations (10 CFR Part 50)1 Alternative Licensing Regulations (10 CFR Part 52)3 Permanent Shutdowns6 Operable Units CP Issued2 Full-Power OL Issued COL Issued4 Operating COLs5