ML20129A021

From kanterella
Revision as of 06:19, 7 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec Deleting Table 6.9.2-1 Re Requirements to Rept Results of Secondary Containment Leak Tests & Summaries of Primary Coolant Leakage to Drywell
ML20129A021
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/20/1985
From:
GEORGIA POWER CO.
To:
Shared Package
ML20129A000 List:
References
TAC-57907, NUDOCS 8506040441
Download: ML20129A021 (2)


Text

a ..w ,

Georgia Powerkh ATTACBENT 4 NBC DOCKET 50-321 OPERATING LIONSE DPR-57 EDWIN I. HA701 NUCLEAR PIAVf UNIT 1 RtDuutsi 10 REVISE TECHNICAL SPECIFICATIONS:

PROPOSED CHANGES TO SPECIAL REPORTING REQUIRDENIS The proposed change to Technical Specifications (Appendix A.to Operating License DPR-57) wxild be incorporated as follows:

Remove Page Insert Page 6-19 6-19 K$ 20 .

~

700775

7 TABLE 6.9.2-1 SPEX'IAL REPORTIM3 REQUIRENENI'S Tech Spec Area Reference Suhnittal Date

a. Primary Containment 4.7.A Within 3 months following Leak Rate Tests (1) concilct of test
b. In-Service Inspection- 4.6.K 5 years (2)

Evaluation

c. Reactor Coolant Radioactivity 4.6.F Within 30 days of the l

.in excess of specified limits occurrence Notes:

1. Each integrated leak rate test of the primary containment shall be the mbject of a mmnary technical report including remits of tre local leak rate tests since the last report. The report as described in the 10 CFR Part 50, Appendix J, " Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, " shall include data, analysis, and interpretations of the remits which demonstrate compliance in meeting the specified leak rate limits.
2. The report shall be mbnitted within the period of time listed based on the connercial service date as the starting period HNIG - UNIT 1 6-19

<